Haware Altura RERA Details - P51800029411, Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Haware Altura under registration P51800029411 in Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51800029411
  • Project Name Haware Altura
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Mumbai Suburban
  • Taluka Kurla
  • Village Kurla
  • Original Completion 30 April 2026
  • Revised Completion 30 April 2026
  • Project Area (in Sq.mt.) 945.88
  • Total Buildings/Towers 1
  • Documents 11 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 29 May 2021 Expected commencement of civil works and foundation on site.
Original Completion 30 April 2026 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 April 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address 71JsW4v3NBTXVvU7GACDNuFD7ZWspTXV8q4ODtqrx98c7WIvoPQzNdaoYlobfnn7

RERA Coordinates

Latitude, Longitude 20.864300000000000, 74.934900000000000

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Haware Altura Haware Altura 0 102 23 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 157
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 80 units · avg area 36.66 Sq.mt.
2 BHK 62 units · avg area 52.42 Sq.mt.
Shop 15 units · avg area 13.90 Sq.mt.
  • Haware Altura
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 37.57 19 19
Shop 17.0 1 1
Shop 13.93 1 1
Shop 13.84 1 1
Shop 12.16 1 1
Shop 12.38 1 1
Shop 14.42 1 1
Shop 14.2 1 1
1BHK 36.93 21 20
1BHK 36.78 20 20
Shop 17.37 1 0
2BHK 52.04 21 0
2BHK 52.05 21 1
Shop 12.94 1 0
Shop 9.71 1 1
Shop 19.06 1 0
Shop 11.56 1 1
Shop 13.0 1 0
Shop 16.1 1 1
2BHK 53.22 20 18
1BHK 35.39 20 19
Shop 10.84 1 1
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt 100.0% Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Haware Altura
Haware Altura · Overall Progress 100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 Layout Building Plann.Pdf.Pdf
2 Intimation Of Approval.Pdf.Pdf
3 Sheet No 1 (2).Pdf.Pdf
4 Sheet No 2 (2).Pdf.Pdf
5 Sheet No 3 (1).Pdf.Pdf
6 Pan Card.Pdf.Pdf
7 Legal Title Report.Pdf.Pdf
8 Form B (1).Pdf.Pdf
9 Draft Agreement For Sale.Pdf.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank THE COSMOS CO OPERATIVE BANK LIMITED
IFSC COSB0000029
Branch Address Persepolis premises CHS Plot no 74 Sector 17 Vashi Navi Mumbai
Country/City