RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number P51800080380
- Project Name TBC Marol Phase 1
- Project Type Residential / Group Housing
- Project Status New Launch
- State Maharashtra
- District Mumbai Suburban
- Taluka Andheri
- Village Marol
- Original Completion 31 December 2030
- Revised Completion 31 December 2030
- Project Area (in Sq.mt.) 3,252.18
- Total Buildings/Towers 2
- Documents 2 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Land, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Survey Number 395(Pt), 396B(pt), 396C(pt) ,396D, 397(pt), 398, 398/1,407, 408, 408/1 to 3, 409, 409/1, 410, 412(pt), 413, 413/1 to 18, 414(Pt), 420(Pt), 433, 433/1 & 432(pt.) | |
Boundary Details |
|
| Boundaries East Sports Complex Reservation | Boundaries West 6 Mtr Driveway |
| Boundaries South Layout RG | Boundaries North 13-40 mtr Wide DP Road |
RERA Coordinates |
|
| Latitude, Longitude 19.114747000000000, 72.881529000000000 | |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths % not reported | Water Supply % not reported | Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported |
| Storm Water Drains % not reported | Landscaping & Tree Planting % not reported | Street Lighting % not reported |
| Community Buildings % not reported | Treatment And Disposal Of Sewage And Sullage Water % not reported | Solid Waste Management And Disposal % not reported |
| Water Conservation /Rain Water Harvesting % not reported | Energy Managemcnt % not reported | Fire Protection And Fire Safety Requirements % not reported |
| Electrical Meter Room, Sub-station, Receiving Station % not reported | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
Building Activity Progress
Statutory activity-wise construction progress as declared by the developer, per building/tower.
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | INDUSIND BANK |
|---|---|
| IFSC | INDB0000332 |
| Branch Address | GROUND FLOOR, MARATHE UDYOG BHAVAN, NEXT TO SKODA SHOWROOM, APPASAHEB MARATHE MARG, PRABHADEVI, MUMBAI – 400025 |