Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Aaditya Gurukrupa RERA Details - P52000014717, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Aaditya Gurukrupa under registration P52000014717 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000014717
  • Project Name AADITYA GURUKRUPA
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Raigarh
  • Taluka Panvel
  • Village Panvel
  • Original Completion 30 December 2021
  • Revised Completion 30 December 2021
  • Project Area (in Sq.mt.) 1,287.6
  • Total Buildings/Towers 1
  • Documents 2 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 26 December 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2021 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2021 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
AADITYA SADGURUPLOT NO.7 SECTOR 6 KARANJADE PANVEL350CompletedIndustrial1162017-07-312017-07-26NoNA
AADITYA SHANKARPLOT NO 31 SECTOR 4 KARANJADE PANVEL1150CompletedIndustrial1492016-12-312016-12-20NoNA
AADITYA SARASWATIF P NO 222A M G ROAD PANVEL449.5CompletedIndustrial152013-06-302013-06-10NoNA
AADITYA SUNDARCTS NO 1245B URAN ROAD PANVEL569.4CompletedIndustrial1182013-10-102013-09-30NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
AADITYA GURUKRUPA AADITYA GURUKRUPA 10 10 6 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 38
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 28 units · avg area 65.80 Sq.mt.
Shop 7 units · avg area 34.93 Sq.mt.
shop 3 units · avg area 34.85 Sq.mt.
  • AADITYA GURUKRUPA
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1Bhk 45.17 2 0
Shop 33.74 2 1
Shop 37.17 1 1
1Bhk 84.57 1 1
1BHK 63.2 2 2
1BHK 63.01 2 2
1Bhk 83.83 1 1
Shop 33.92 2 1
1Bhk 69.98 2 2
1Bhk 82.16 2 2
1Bhk 51.02 1 1
1Bhk 62.64 2 2
1Bhk 80.95 1 1
1Bhk 50.65 2 2
Shop 39.03 1 1
Shop 32.99 1 1
1Bhk 51.49 2 1
1 Bhk 68.22 2 1
1Bhk 60.22 2 2
shop 34.85 3 3
1Bhk 81.69 1 1
1Bhk 78.44 2 2
1Bhk 69.98 1 1
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • AADITYA GURUKRUPA
AADITYA GURUKRUPA · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Branch Address NEW PANVEL
Country/City