Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Greenscape Eternia RERA Details - P52000011766, Navi Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Greenscape Eternia under registration P52000011766 in Navi Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52000011766
  • Project Name ETERNIA
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Raigarh
  • Taluka Panvel
  • Village Rodpali
  • Original Completion 30 December 2023
  • Revised Completion 31 March 2027
  • Project Area (in Sq.mt.) 7,249.58
  • Total Buildings/Towers 5
  • Documents 3 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 31 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 March 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name GREENSCAPE DEVELOPERS PRIVATE LIMITED
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
CYBER ONEPLOT NO 4 AND 6 SECTOR 30A VASHI NAVI MUMBAI4334.79CompletedIndustrial112013-06-112013-06-11NoNA

Promoters, Co-promoters & Members

NameRoleAddress
Suresh Ambavi WaviaDirectorThane, MAHARASHTRA
Jayesh Ambavi VaviaDirectorThane, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
ETERNIA ETERNIA WING A 0 1 16 16 (Basement + Ground + 14 Upper Floors) 15 61 NA
ETERNIA ETERNIA WING B 0 1 16 16 (Basement + Ground + 14 Upper Floors) 14 56 NA
ETERNIA ETERNIA WING C 0 1 16 16 (Basement + Ground + 14 Upper Floors) 14 53 NA
ETERNIA ETERNIA WING D 0 1 16 16 (Basement + Ground + 14 Upper Floors) 14 58 NA
ETERNIA ETERNIA WING E 0 1 16 16 (Basement + Ground + 14 Upper Floors) 15 56 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 284
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 142 units · avg area 30.60 Sq.mt.
2 BHK 116 units · avg area 42.95 Sq.mt.
Shop 26 units · avg area 28.08 Sq.mt.
  • ETERNIA WING A
  • ETERNIA WING B
  • ETERNIA WING C
  • ETERNIA WING D
  • ETERNIA WING E
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
Shop 25.83 2 0
1BHK 39.59 9 4
1BHK 39.6 10 0
1BHK 39.61 10 9
2BHK 46.83 1 0
2BHK 46.88 2 0
2BHK 46.89 4 4
2BHK 46.95 1 0
2BHK 47.0 5 3
1BHK 39.5 5 0
Shop 27.52 2 0
Shop 28.37 2 2
1BHK 39.51 6 6
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water 100.0% Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • ETERNIA WING A
  • ETERNIA WING B
  • ETERNIA WING C
  • ETERNIA WING D
  • ETERNIA WING E
ETERNIA WING A · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank THE COSMOS CO OPERATIVE BANK LIMITED
IFSC COSB0000029
Branch Address PERSEPOLIS PREMISES CHS, PLOT-74, SECTOR-17, VASHI, NAVI MUMBAI-400705
Country/City