Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Project On Hold Source: rera.up

Supertech ORB RERA Details - UPRERAPRJ5551, Noida

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Supertech ORB under registration UPRERAPRJ5551 in Noida, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ5551
  • Project Name SUPERTECH ORB-R (PHASE-III)
  • Project Type Residential
  • Project Status Project On Hold
  • State Uttar Pradesh
  • District Gautam Buddha Nagar
  • Taluka Gautam Buddha Nagar
  • Authority Noida Authority
  • Original Completion 29 December 2021
  • Revised Completion 30 June 2021
  • Project Area (in Sq.mt.) 10,058
  • Documents 21 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2012 Expected commencement of civil works and foundation on site.
Original Completion 29 December 2021 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 June 2021 No revision filed against the original committed handover date.
Project Duration
113 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SUPERTECH LIMITED Company
Promoter Type Company
Contact 9999535430
Email rera@supertechlimited.com
Registered Address 1114 HAMKUNT CHAMBERS ,11 FLOOR 89, NEHRU PLACE NEW DELHI DL 110019 INDIA
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Plot Plot No. GH 01 A
Land Area (in Sq.mt.) 2,09,271.47

RERA Coordinates

Latitude, Longitude 28.574266, 77.387420
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number 2014/III-227/757
Permit Date 30 September 2014
Valid Upto 30 September 2019
Extendable Upto 30 September 2024

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 46
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
4 BHK 46 units · avg area 227.05 Sq.mt.
OTHER 0 units
  • ORB-R (PHASE III)
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 4 BHK 226.89 4 2 0 47.4 0
1 4 BHK 226.89 4 2 0 47.4 0
2 4 BHK 227.09 4 2 0 47.61 0
3 4 BHK 227.09 4 2 0 47.61 0
4 4 BHK 227.09 4 2 0 47.61 0
5 4 BHK 227.09 4 2 0 47.61 0
6 4 BHK 227.09 4 2 0 47.61 0
7 4 BHK 227.09 4 2 0 47.61 0
8 4 BHK 227.09 4 2 0 47.61 0
9 4 BHK 227.09 4 2 0 47.61 0
10 4 BHK 227.09 4 2 0 47.61 0
BSMNT OTHER 0 0 0 0 0 0
BSMNT2 OTHER 0 0 0 0 0 0
GF 4 BHK 226.89 2 2 0 47.4 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall % not reported Road Work % not reported
Footpaths % not reported Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain % not reported Parks 30% Tree Planting 9%
Design For Electric Supply Including Street Lighting % not reported Community Buildings 65% Treatment And Disposal System Of Sewage And Sullage Water % not reported
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Dd 1 Lease Deed
Dd 2 Lease Deed
Du 1 Commencement Certificate
Du 2 Proforma Of Application Form
Du 3 Proforma Of Allotment Letter
Du 4 Proforma Of Conveyance Deed
Du 5 Waste Disposal Plan
Du 6 Water Supply Plan
Du 7 Electricity Supply Plan
Du 8 Development Work Plan
Du 9 Affidavit (Form-B)
Du 10 CA CERTIFICATE
Du 11 ARCHITECT CERTIFICATE
Du 12 ENGINEERS CERTIFICATE
Du 13 Registry Document In Case Of Own Land
Du 14 Registry Document In Case Of Own Land
Du 15 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 16 Authentic Copy Of Approval Of Project
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 21,798
Registration Fee ₹ 55,500
Project Account Bank HDFC BANK
Account Number (RERA) 57500000449641
IFSC HDFC0000590
Branch G-283 WINDSOR PARK 5 VAIBHAV KHAND
Branch Address G-283 WINDSOR PARK 5 VAIBHAV KHAND INDIRAPURAM GHAZIABAD
Country/City