coming soon
Akula Swarneem Nasrapur, Pune
Akula Swarneem Floor Plans and Pricing
coming soon
Akula Swarneem Price Trends and Market Insights
Comparable Projects
Recent Updates
Get the latest price and market updates for Akula Swarneem.
-
Pune's Infrastructure Gets Major Boost with ₹18,000 Crore in Elevated Road Projects
Cm Devendra Fadnavis laid the foundation stones for three elevated road projects worth ₹18,000 crore in Pune. These projects aim to significantly reduce traffic congestion across the city and its surrounding areas. The projects include the Pune-Shirur Elevated Highway, Hadapsar-Yavat Elevated Highway, and Talegaon-Chakan-Shikrapur Elevated Highway,.
-
Pune Metro Line 3 to Commence Operations by June 15, Connecting Hinjewadi to Shivajinagar
Pune Metro's elevated Line 3, spanning 23.203 km and connecting Hinjewadi to Shivajinagar, will begin operations in phases starting June 15, 2026. The first phase will cover 12 stations from the Hinjewadi side, with the remaining stations expected to be operational by October.
-
PMC Plans New Bridge Parallel to Rajaram Bridge to Ease Sinhagad Road Traffic
PMC is moving forward with plans to construct a new bridge parallel to the existing Rajaram Bridge to alleviate traffic congestion on Sinhagad Road. This project aims to improve connectivity between Sinhagad Road and Karvenagar , DP Road, reducing daily traffic bottlenecks and enhancing commuter experience.
-
Pune Metro Network to Expand to Nearly 200 km, Addressing Traffic Congestion
CM Devendra Fadnavis announced that Pune, Pimpri Chinchwad, and the Pune Metropolitan region will soon have a nearly 200 km Metro network. This expansion aims to significantly alleviate traffic congestion in the city. Currently, about 33 km of the metro network is operational, & 55 km in construction phase ,with further additions planned.
-
Khambataki Ghat Tunnel Opens for Trial Run, Reducing Pune-Satara Travel Time
One tube of the new Khambataki Ghat Tunnel on the Pune-Satara National Highway has opened for a trial run for light vehicles. This is expected to reduce travel time through the ghat from approximately 45 minutes to just 7 minutes, significantly improving connectivity and safety. The tunnel aims to replace the accident-prone ghat section, with the full project, including the second tube, targeted for completion by March 2026.
-
Structural Works reach 60% completion.
-
Structural Works reach 20% completion.
-
SWARNEEM, officially launched on 08-May-2019 and expected to complete by 30-Apr-2023. Registered under RERA No. P52100020757. The project comprises 1 towers and offers 48 residential units, including 1 BHK, 1 RK, 2 BHK, with unit sizes ranging from 161 to 463 Square feet across a total area of 0.73 Acre.
Amenities & Specifications of Akula Swarneem
Sports
- Kids' Play Areas / Sand Pits
Convenience
- Power Backup
- Treated Water Supply
- 24*7 Water Supply
- Lift
Safety
- 24 x 7 Security
Environment
- Normal Park / Central Green
Leisure
- Indoor Games
Specifications
- Master Bedroom-Walls
- Oil Bound Distemper
- Master Bedroom-Flooring
- Vitrified Tiles
- Other Bedrooms-Flooring
- Vitrified Tiles
- Walls
- Oil Bound Distemper
- Living Area-Flooring
- Vitrified Tiles
- Structure
- RCC Frame Structure
Location and Connectivity Around Akula Realty Nasrapur

Estimate commute from your office or kid's school to Akula Swarneem.
Please select the starting point to calculate the travel time.
Trust & Verification
RERA Details of Akula Swarneem
P52100020757
Swarneem
Rera Url:
- Square Yards RERA Reg. A51800000454
How does Akula Swarneem compare with similar projects?
Akula Realty Track Record
Frequently Asked Questions About Akula Swarneem
Maintenance charges at Akula Swarneem depend on the apartment size and society services and are payable monthly or annually.
Akula Swarneem enjoys excellent connectivity via Satara Road and is well connected to the Pune South area.
After taking possession at Akula Swarneem, buyers should inspect electrical fittings, plumbing and water supply (municipal/borewell), elevator operations across 1, parking allocation, common areas, and verify that the flat matches the approved Oil Bound Distemper, Vitrified Tiles, RCC Frame Structure and inventory list before moving in.
Yes, Akula Swarneem is a Ready to Move residential project, allowing buyers to take possession immediately without any construction wait.
Yes, Akula Swarneem is registered under RERA with registration number P52100020757, ensuring transparency and regulatory compliance.
This website is only for the purpose of providing information regarding real estate projects in different geographies. Any information which is being provided on this website is not an advertisement or a solicitation. The company has not verified the information and the compliances of the projects. Further, the company has not checked the RERA* registration status of the real estate projects listed herein. The company does not make any representation in regards to the compliances done against these projects. Please note that you should make yourself aware about the RERA* registration status of the listed real estate projects.
*Real Estate (Regulation & Development) Act, 2016.