Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Sampoojitha Heights RERA Details - PRM/KA/RERA/1251/446/PR/270526/008687 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sampoojitha Heights under registration PRM/KA/RERA/1251/446/PR/270526/008687 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/270526/008687
  • Project Name SAMPOOJITHA HEIGHTS
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2029
  • Documents 88 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 10 December 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SAMPOOJITHA DEVELOPERS
Registered Address No 44 9th cross,kalkere village,nri layout,Near Kalyani Bakery Bengaluru ,Bengaluru East ,Bengaluru Urban-560043
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address KHATHA NO:1086, SY NO: 60/2,60/5,60/3,60/6,60/7,60/8,60/9,60/10,60/11,60/12,60/14 & 60/15, , BELATHUR VILLAGE, BIDARAHALLI HOBLI, BANGALORE EAST TALUK-560066 , Bengaluru East , Bengaluru Urban, Karnataka - 560066

RERA Coordinates

Latitude, Longitude 13.003911, 77.751488
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/AD.COM/MDP/0678/24-25
Authority BDA - Bangalore Development Authority
Approved Date 02 September 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BUILDING 1 0 5 5 100 Residential 15.0 4 100

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • BUILDING 1
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 104.70 GF01
GF 3 BHK 103.77 GF02
GF 3 BHK 99.41 GF03
GF 3 BHK 95.78 GF04
GF 3 BHK 96.62 GF05
GF 3 BHK 96.62 GF06
GF 3 BHK 96.62 GF07
GF 3 BHK 96.62 GF08
GF 3 BHK 96.62 GF09
GF 3 BHK 96.62 GF10
GF 3 BHK 90.67 GF11
GF 2 BHK 92.44 GF12
GF 2 BHK 76.55 GF13
GF 2 BHK 76.27 GF14
GF 2 BHK 76.55 GF15
GF 2 BHK 72.46 GF16
GF 2 BHK 73.77 GF17
GF 2 BHK 70.70 GF18
GF 2 BHK 69.68 GF19
GF 2 BHK 72.46 GF20
GF 2 BHK 73.77 GF21
GF 2 BHK 70.70 GF22
GF 2 BHK 69.68 GF23
GF 2 BHK 72.46 GF24
GF 2 BHK 73.77 GF25
1 3 BHK 104.70 101
1 3 BHK 103.77 102
1 3 BHK 99.41 103
1 3 BHK 95.78 104
1 3 BHK 96.62 105
1 3 BHK 96.62 106
1 3 BHK 96.62 107
1 3 BHK 96.62 108
1 3 BHK 96.62 109
1 3 BHK 96.62 110
1 3 BHK 90.67 111
1 2 BHK 92.44 112
1 2 BHK 76.55 113
1 2 BHK 76.27 114
1 2 BHK 76.55 115
1 2 BHK 72.46 116
1 2 BHK 73.77 117
1 2 BHK 70.70 118
1 2 BHK 69.68 119
1 2 BHK 72.46 120
1 2 BHK 73.77 121
1 2 BHK 70.70 122
1 2 BHK 69.68 123
1 2 BHK 72.46 124
1 2 BHK 73.77 125
2 3 BHK 104.70 201
2 3 BHK 103.77 202
2 3 BHK 99.41 203
2 3 BHK 95.78 204
2 3 BHK 96.62 205
2 3 BHK 96.62 206
2 3 BHK 96.62 207
2 3 BHK 96.62 208
2 3 BHK 96.62 209
2 3 BHK 96.62 210
2 3 BHK 90.67 211
2 2 BHK 92.44 212
2 2 BHK 76.55 213
2 2 BHK 76.27 214
2 2 BHK 76.55 215
2 2 BHK 72.46 216
2 2 BHK 73.77 217
2 2 BHK 70.70 218
2 2 BHK 69.68 219
2 2 BHK 72.46 220
2 2 BHK 73.77 221
2 2 BHK 70.70 222
2 2 BHK 69.68 223
2 2 BHK 72.46 224
2 2 BHK 73.77 225
3 3 BHK 104.70 301
3 3 BHK 103.77 302
3 3 BHK 99.41 303
3 3 BHK 95.78 304
3 3 BHK 96.62 305
3 3 BHK 96.62 306
3 3 BHK 96.62 307
3 3 BHK 96.62 308
3 3 BHK 96.62 309
3 3 BHK 96.62 310
3 3 BHK 90.67 311
3 2 BHK 92.44 312
3 2 BHK 76.55 313
3 2 BHK 76.27 314
3 2 BHK 76.55 315
3 2 BHK 72.46 316
3 2 BHK 73.77 317
3 2 BHK 70.70 318
3 2 BHK 69.68 319
3 2 BHK 72.46 320
3 2 BHK 73.77 321
3 2 BHK 70.70 322
3 2 BHK 69.68 323
3 2 BHK 72.46 324
3 2 BHK 73.77 325
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Sampoojitha Developers FY 2024-25.Pdf
Fd 2 NA.Pdf
Fd 3 NA.Pdf
Fd 4 Sampoojitha Developers FY 2024-25.Pdf
Fd 5 NA.Pdf
Fd 6 NA.Pdf
Fd 7 ACK373778770311025.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 BELTHUR VILLAGE MAP.Pdf
Od 2 PRJ 7739 24-25 (1).Pdf
Od 3 KATHA.Pdf
Ed 1 14-04-2026
Ed 2 14-04-2026
Ed 3 14-04-2026
Ed 4 14-04-2026
Ed 5 14-04-2026
Ed 6 14-04-2026
Ed 7 14-04-2026
Ed 8 14-04-2026
Ed 9 14-04-2026
Ed 10 18-05-2026
Ed 11 18-05-2026
Ed 12 18-05-2026
Ed 13 18-05-2026
Ed 14 18-05-2026
Ed 15 18-05-2026
Ed 16 18-05-2026
Ed 17 18-05-2026
Ed 18 18-05-2026
Ed 19 18-05-2026
Ed 20 18-05-2026
Ed 21 18-05-2026
Ed 22 18-05-2026
Ed 23 18-05-2026
Ed 24 18-05-2026
Ed 25 18-05-2026
Ed 26 18-05-2026
Ed 27 18-05-2026
Ed 28 18-05-2026
Ed 29 22-05-2026
Ed 30 22-05-2026
Ed 31 22-05-2026
Ed 32 22-05-2026
Ed 33 22-05-2026
Ed 34 22-05-2026
Ed 35 22-05-2026
Ed 36 22-05-2026
Ed 37 27-05-2026
Ed 38 27-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 50200082543121
IFSC HDFC0001050
Branch Address KALKERE
Country/City