Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Ankuraa Meridian RERA Details - PRM/KA/RERA/1251/446/PR/151223/006488 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Ankuraa Meridian under registration PRM/KA/RERA/1251/446/PR/151223/006488 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/151223/006488
  • Project Name ANKURAA MERIDIAN
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 30 June 2027
  • Documents 86 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

ANKURAA DEVELOPERS
Registered Address SURVEY NO4/1, 3RD FLOOR, No. 2,WHITEFIELD MAIN ROAD ,Bengaluru East ,Bengaluru Urban-560066
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY.NO:85,86 OF BELATUR VILLAGE & SY.NO:78 OF KUMBENA AGRAHARA VILLAGE , BIDARAHALLI HOBLI, WARD NO-54 , Bengaluru East , Bengaluru Urban, Karnataka - 560067

RERA Coordinates

Latitude, Longitude 13.010281060716672, 77.75070548057556
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0100/ 22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 30 September 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type No. of Floors No. of Units
Aster 1 16 1 95 Residential 14 84
Basil 1 16 1 95 Residential 14 84
Clover 1 16 1 96 Residential 14 84
Daisy 1 16 1 96 Residential 14 86

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • Aster
  • Basil
  • Clover
  • Daisy
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2.5BHK 88.1 101
GF 2.5BHK 88.1 102
GF 2.5BHK 88.1 103
GF 2 BHK 77.37 104
GF 2 BHK 75 105
GF 3BHK 104.37 106
1 2.5BHK 88.28 201
1 2.5BHK 88.28 202
1 2.5BHK 88.28 203
1 2 BHK 77.36 204
1 2 BHK 75 205
1 3BHK 104.4 206
2 2.5BHK 88.28 301
2 2.5BHK 88.28 302
2 2.5BHK 88.28 303
2 2 BHK 77.36 304
2 2 BHK 75 305
2 3BHK 104.4 306
3 2.5BHK 88.28 401
3 2.5BHK 88.28 402
3 2.5BHK 88.28 403
3 2 BHK 77.36 404
3 2 BHK 75 405
3 3BHK 104.4 406
4 2.5BHK 88.28 501
4 2.5BHK 88.28 502
4 2.5BHK 88.28 503
4 2 BHK 77.36 504
4 2 BHK 75 505
4 3BHK 104.4 506
5 2.5BHK 88.28 601
5 2.5BHK 88.28 602
5 2.5BHK 88.28 603
5 2 BHK 77.36 604
5 2 BHK 75 605
5 3BHK 104.4 606
6 2.5BHK 88.28 701
6 2.5BHK 88.28 702
6 2.5BHK 88.28 703
6 2 BHK 77.36 704
6 2 BHK 75 705
6 3BHK 104.4 706
7 2.5BHK 88.28 801
7 2.5BHK 88.28 802
7 2.5BHK 88.28 803
7 2 BHK 77.36 804
7 2 BHK 75 805
7 3BHK 104.4 806
8 2.5BHK 88.28 901
8 2.5BHK 88.28 902
8 2.5BHK 88.28 903
8 2 BHK 77.36 904
8 2 BHK 75 905
8 3BHK 104.4 906
9 2.5BHK 88.28 1001
9 2.5BHK 88.28 1002
9 2.5BHK 88.28 1003
9 2 BHK 77.36 1004
9 2 BHK 75 1005
9 3BHK 104.4 1006
10 2.5BHK 88.28 1101
10 2.5BHK 88.28 1102
10 2.5BHK 88.28 1103
10 2 BHK 77.36 1104
10 2 BHK 75 1105
10 3BHK 104.4 1106
11 2.5BHK 88.28 1201
11 2.5BHK 88.28 1202
11 2.5BHK 88.28 1203
11 2 BHK 77.36 1204
11 2 BHK 75 1205
11 3BHK 104.4 1206
12 2.5BHK 88.28 1301
12 2.5BHK 88.28 1302
12 2.5BHK 88.28 1303
12 2 BHK 77.36 1304
12 2 BHK 75 1305
12 3BHK 104.4 1306
13 2.5BHK 88.28 1401
13 2.5BHK 88.28 1402
13 2.5BHK 88.28 1403
13 2 BHK 77.36 1404
13 2 BHK 75 1405
13 3BHK 104.4 1406
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Retaining Wall (All Types) % not reported
Sub Structure Plinth Level Beam % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction: Bricks, Concrete Blocks Etc % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Painting % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Santioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Internal Roads & Footpaths % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Parks & Tree Planting % not reported Internal Infrastructure Street Lighting % not reported
Internal Infrastructure Provision For Community Buildings And For Treatment And Disposal Of Sewage And Sullage Water % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Water Conservation % not reported
Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Education/health/other Public Amenities % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning And Incerntion % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Staircases And Lift Lobbies, Corridor,lobbies, Corridor % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building / Common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas And Common Storage Spaces % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Ankuraa Developers FY 22-23.Pdf
Fd 2 Ankuraa Developers FY 21-22.Pdf
Fd 3 Ankuraa Developers FY 20-21.Pdf
Fd 4 Ankuraa Developers FY 22-23.Pdf
Fd 5 Ankuraa Developers FY 21-22.Pdf
Fd 6 Ankuraa Developers FY 20-21.Pdf
Fd 7 Ankuraa Developers FY 22-23.Pdf
Fd 8 Ankuraa Developers FY 21-22.Pdf
Fd 9 Ankuraa Developers FY 20-21.Pdf
Fd 10 Ankuraa Developers FY 22-23.Pdf
Fd 11 Ankuraa Developers FY 21-22.Pdf
Fd 12 Ankuraa Developers FY 20-21.Pdf
Fd 13 Ankuraa Developers FY 22-23.Pdf
Fd 14 Ankuraa Developers FY 21-22.Pdf
Fd 15 Ankuraa Developers FY 20-21.Pdf
Fd 16 Ankuraa Developers FY 22-23.Pdf
Fd 17 Ankuraa Developers FY 21-22.Pdf
Fd 18 Ankuraa Developers FY 20-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 STP Drawing With Engineer Signature.Pdf
Od 2 STP Demarcation.Pdf
Od 3 Location Demarcation.Png
Od 4 Title Deed 24751-2006-07 Sy No 85-P1.Pdf
Od 5 Title Deed-1839-2010-11 Sy No 86-P1 78-A 78-B.Pdf
Od 6 Title Deed Deed-30563-2006-07 Sy No 86-P1 12 G.Pdf
Od 7 Title Deed 1955-2007-08 Sy No 86-P1.Pdf
Od 8 1 Title Deed 13-09-2007 (No 1957-07-08).Pdf
Od 9 2 Title 18-08-0-2007 (No 1839-07-08).Pdf
Od 10 3 Title 30-8-07 (Doc 1818-07-08).Pdf
Od 11 Conversion Sketch 85 86.Pdf
Od 12 Guidence Value Certificate Copy 2023-24.Pdf
Od 13 Clarification On Commencement Certificate.Pdf
Od 14 Form-6 Engineer Certificate.Pdf
Od 15 Karab SHIFTING SKETCH.Pdf
Od 16 Karab SHIFTING ORDER.Pdf
Od 17 Sensitive Clearance Certificate.Pdf
Od 18 Location Demarcation.Pdf
Od 19 Village Map Demarcation.Pdf
Od 20 CDP Master Extract.Pdf
Od 21 Zoning Regulations RMP2015.Pdf
Od 22 Area Statement.Pdf
Od 23 HAL NOC.Pdf
Od 24 Clarification On Change In Units In KSPCB And SEIAA NOC.Pdf
Ed 1 14-12-2023
Ed 2 14-12-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001343339
IFSC HDFC0000077
Branch Address Bangalore IT Park
Country/City