Aryan 1 Celeste RERA Details - PRM/KA/RERA/1251/472/PR/120824/006968 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Aryan 1 Celeste under registration PRM/KA/RERA/1251/472/PR/120824/006968 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/472/PR/120824/006968
  • Project Name ARYAN 1 CELESTE
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Yelahanka
  • Original Completion 30 June 2028
  • Documents 84 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 February 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

ARYAN LANDMARKS
Registered Address NO 1144, OLD NO 8/9, CHANNASANDRA, VISHNUVARDHAN ROAD,,RR NAGAR BANGALORE ,Bengaluru South ,Bengaluru Urban-560098
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address RESIDENTIAL APARTMENT BUILDING @BBMP KHATHA NO.676/2775/1A , INDUSTRIAL AREA,YELAHANKA 1 ST STAGE , Yelahanka , Bengaluru Urban, Karnataka - 560064

RERA Coordinates

Latitude, Longitude 13.103533, 77.580366
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/11629/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 15 February 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type No. of Floors No. of Units
ARYAN 1 CELESTE 2 15 0 158 Residential 14 130

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
DUPLEX 0 units
  • ARYAN 1 CELESTE
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 102.73 101
GF 3 BHK 110.14 102
GF 3 BHK 106.99 103
GF 3 BHK 106.26 104
GF 2 BHK 85.61 105
GF 3 BHK 108.63 106
GF 2 BHK 84.09 107
GF 2 BHK 88.42 108
GF 3 BHK 95.81 109
GF 3 BHK 97.65 110
1 3 BHK 102.73 201
1 3 BHK 110.14 202
1 3 BHK 106.99 203
1 3 BHK 106.26 204
1 2 BHK 85.61 205
1 3 BHK 108.63 206
1 2 BHK 84.09 207
1 2 BHK 88.42 208
1 3 BHK 95.81 209
1 3 BHK 97.65 210
2 3 BHK 102.73 301
2 3 BHK 110.14 302
2 3 BHK 106.99 303
2 3 BHK 106.26 304
2 2 BHK 85.61 305
2 3 BHK 108.63 306
2 2 BHK 84.09 307
2 2 BHK 88.42 308
2 3 BHK 95.81 309
2 3 BHK 97.65 310
3 3 BHK 102.73 401
3 3 BHK 110.14 402
3 3 BHK 106.99 403
3 3 BHK 106.26 404
3 2 BHK 85.61 405
3 3 BHK 108.63 406
3 2 BHK 84.09 407
3 2 BHK 88.42 408
3 3 BHK 95.81 409
3 3 BHK 97.65 410
4 3 BHK 102.73 501
4 3 BHK 110.14 502
4 3 BHK 106.99 503
4 3 BHK 106.26 504
4 2 BHK 85.61 505
4 3 BHK 108.63 506
4 2 BHK 84.09 507
4 2 BHK 88.42 508
4 3 BHK 95.81 509
4 3 BHK 97.65 510
5 3 BHK 102.73 601
5 3 BHK 110.14 602
5 3 BHK 106.99 603
5 3 BHK 106.26 604
5 2 BHK 85.61 605
5 3 BHK 108.63 606
5 2 BHK 84.09 607
5 2 BHK 88.42 608
5 3 BHK 95.81 609
5 3 BHK 97.65 610
6 3 BHK 102.73 701
6 3 BHK 110.14 702
6 3 BHK 106.99 703
6 3 BHK 106.26 704
6 2 BHK 85.61 705
6 3 BHK 108.63 706
6 2 BHK 84.09 707
6 2 BHK 88.42 708
6 3 BHK 95.81 709
6 3 BHK 97.65 710
7 3 BHK 102.73 801
7 3 BHK 110.14 802
7 3 BHK 106.99 803
7 3 BHK 106.26 804
7 2 BHK 85.61 805
7 3 BHK 108.63 806
7 2 BHK 84.09 807
7 2 BHK 88.42 808
7 3 BHK 95.81 809
7 3 BHK 97.65 810
8 3 BHK 102.73 901
8 3 BHK 110.14 902
8 3 BHK 106.99 903
8 3 BHK 106.26 904
8 2 BHK 85.61 905
8 3 BHK 108.63 906
8 2 BHK 84.09 907
8 2 BHK 88.42 908
8 3 BHK 95.81 909
8 3 BHK 97.65 910
9 3 BHK 102.73 1001
9 3 BHK 110.14 1002
9 3 BHK 106.99 1003
9 3 BHK 106.26 1004
9 2 BHK 85.61 1005
9 3 BHK 108.63 1006
9 2 BHK 84.09 1007
9 2 BHK 88.42 1008
9 3 BHK 95.81 1009
9 3 BHK 97.65 1010
10 3 BHK 102.73 1101
10 3 BHK 110.14 1102
10 3 BHK 106.99 1103
10 3 BHK 106.26 1104
10 2 BHK 85.61 1105
10 3 BHK 108.63 1106
10 2 BHK 84.09 1107
10 2 BHK 88.42 1108
10 3 BHK 95.81 1109
10 3 BHK 97.65 1110
11 3 BHK 102.73 1201
11 3 BHK 110.14 1202
11 3 BHK 106.99 1203
11 3 BHK 106.26 1204
11 2 BHK 85.61 1205
11 3 BHK 108.63 1206
11 2 BHK 84.09 1207
11 2 BHK 88.42 1208
11 3 BHK 95.81 1209
11 3 BHK 97.65 1210
12 3 BHK 101.56 1301
12 DUPLEX 137.57 1302
12 DUPLEX 185.92 1303
12 DUPLEX 166.61 1304
12 DUPLEX 170.78 1305
12 DUPLEX 184.4 1306
12 2 BHK 84.15 1307
12 2 BHK 88.76 1308
12 3 BHK 93.9 1309
12 3 BHK 96.4 1310
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Retaining Wall (All Types) % not reported
Sub Structure Plinth Level Beam % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction: Bricks, Concrete Blocks Etc % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Painting % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Santioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Internal Roads & Footpaths % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Parks & Tree Planting % not reported Internal Infrastructure Street Lighting % not reported
Internal Infrastructure Provision For Community Buildings And For Treatment And Disposal Of Sewage And Sullage Water % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Water Conservation % not reported
Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Education/health/other Public Amenities % not reported
Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported
External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported
External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported
External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning And Incerntion % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Staircases And Lift Lobbies, Corridor,lobbies, Corridor % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building / Common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas And Common Storage Spaces % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Aryan Landmarks FY 2022-23.Pdf
Fd 2 Aryan Landmarks FY 2021-22.Pdf
Fd 3 Not Applicable.Pdf
Fd 4 Aryan Landmarks FY 2022-23.Pdf
Fd 5 Aryan Landmarks FY 2021-22.Pdf
Fd 6 Not Applicable.Pdf
Fd 7 Aryan Landmarks FY 2022-23.Pdf
Fd 8 Aryan Landmarks FY 2021-22.Pdf
Fd 9 Not Applicable.Pdf
Fd 10 Aryan Landmarks FY 2022-23.Pdf
Fd 11 Aryan Landmarks FY 2021-22.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 Aryan Landmarks FY 2022-23.Pdf
Fd 14 Aryan Landmarks FY 2021-22.Pdf
Fd 15 Not Applicable.Pdf
Fd 16 Aryan Landmarks FY 2022-23.Pdf
Fd 17 Aryan Landmarks FY 2021-22.Pdf
Fd 18 Not Applicable.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Form 6 Eng Cert.Pdf
Od 2 Catalyst Discharge Deed.Pdf
Od 3 Edelwesis Discharge Deed.Pdf
Od 4 Mortgage Deed.Pdf
Od 5 Old Khatha Certificate.Pdf
Od 6 Sale Deed 3133 -2007-08.Pdf
Od 7 Sale Deed 3132 2007-08.Pdf
Od 8 Sale Deed 4210 2010-11.Pdf
Od 9 Sale Deed 4772 2011-12.Pdf
Od 10 Sale Deed 4936 2010-11.Pdf
Od 11 Sale Deed 3134 2007-08.Pdf
Od 12 Sale Deed 8689-2013-14.Pdf
Od 13 JAKKUR NOC - Height Clearance.Pdf
Od 14 AREA STATEMENT.Pdf
Od 15 BDA CHANGE OF LAND USE.Pdf
Od 16 CDP Map Demarcation.Pdf
Od 17 Guidance Value Cert.Pdf
Od 18 Satellite Image Area Demarcation.Pdf
Od 19 STP Demarcation.Pdf
Od 20 STP Drawing.Pdf
Od 21 Clarification On Single Layout Map And Order.Pdf
Od 22 Clarification On Commencement Certificate.Pdf
Ed 1 29-07-2024
Ed 2 29-07-2024
Ed 3 29-07-2024
Ed 4 29-07-2024
Ed 5 29-07-2024
Ed 6 29-07-2024
Ed 7 29-07-2024
Ed 8 29-07-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 924020005916174
IFSC UTIB0003265
Branch Address ATTURU LAYOUT
Country/City