Century Kindle RERA Details - PRM/KA/RERA/1251/309/PR/200326/008542 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Century Kindle under registration PRM/KA/RERA/1251/309/PR/200326/008542 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/200326/008542
  • Project Name Century Kindle Phase 1
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 14 March 2031
  • Documents 72 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2026 Expected commencement of civil works and foundation on site.
Original Completion 14 March 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Hebbal Properties Private Limited
Registered Address No. 10/1, Ground Floor, Lakshminarayana Complex,Palace Road, Bangalore ,Bengaluru North ,Bengaluru Urban-560001
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. Nos. 77/2, 78, 79, 80 /1 and 80/2 , Attur Village, Yelahanka Hobli, Bengaluru North Taluk, Bengaluru , Bengaluru North , Bengaluru Urban, Karnataka - 560064

RERA Coordinates

Latitude, Longitude 13.110602, 77.565935
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. GBA/BNCC/Addl.CTP/0001/25-26
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 29 January 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 1 2 20 0 252 Residential 60.4 19 229
Tower 2 2 20 0 252 Residential 60.4 19 229

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • Tower 1
  • Tower 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 68.56 T1- 005
-1 3 BHK 102.5 T1- 006
-1 3 BHK 102.5 T1- 007
-1 2 BHK 68.56 T1- 008
-1 2 BHK 73.81 T1- 009
-1 3 BHK 102.5 T1- 010
-1 3 BHK 101.42 T1- 011
-1 2 BHK 71.68 T1- 012
GF 2 BHK 68.1 T1- 101
GF 3 BHK 96.36 T1- 103
GF 2 BHK 68.32 T1- 104
GF 2 BHK 68.56 T1- 105
GF 3 BHK 102.5 T1- 106
GF 3 BHK 102.5 T1- 107
GF 2 BHK 68.56 T1- 108
GF 2 BHK 73.81 T1- 109
GF 3 BHK 102.5 T1- 110
GF 3 BHK 101.42 T1- 111
GF 2 BHK 71.68 T1- 112
1 2 BHK 68.1 T1- 201
1 3 BHK 86.54 T1- 202
1 3 BHK 86.54 T1- 203
1 2 BHK 68.32 T1- 204
1 2 BHK 68.56 T1- 205
1 3 BHK 102.5 T1- 206
1 3 BHK 102.5 T1- 207
1 2 BHK 68.56 T1- 208
1 2 BHK 73.81 T1- 209
1 3 BHK 102.5 T1- 210
1 3 BHK 101.42 T1- 211
1 2 BHK 71.68 T1- 212
2 2 BHK 68.1 T1- 301
2 3 BHK 86.54 T1- 302
2 3 BHK 86.54 T1- 303
2 2 BHK 68.32 T1- 304
2 2 BHK 68.56 T1- 305
2 3 BHK 102.5 T1- 306
2 3 BHK 102.5 T1- 307
2 2 BHK 68.56 T1- 308
2 2 BHK 73.81 T1- 309
2 3 BHK 102.5 T1- 310
2 3 BHK 101.42 T1- 311
2 2 BHK 71.68 T1- 312
3 2 BHK 68.1 T1- 401
3 3 BHK 86.54 T1- 402
3 3 BHK 86.54 T1- 403
3 2 BHK 68.32 T1- 404
3 2 BHK 68.56 T1- 405
3 3 BHK 102.5 T1- 406
3 3 BHK 102.5 T1- 407
3 2 BHK 68.56 T1- 408
3 2 BHK 73.81 T1- 409
3 3 BHK 102.5 T1- 410
3 3 BHK 101.42 T1- 411
3 2 BHK 71.68 T1- 412
4 2 BHK 68.1 T1- 501
4 3 BHK 86.54 T1- 502
4 3 BHK 86.54 T1- 503
4 2 BHK 68.32 T1- 504
4 2 BHK 68.56 T1- 505
4 3 BHK 102.5 T1- 506
4 3 BHK 102.5 T1- 507
4 2 BHK 68.56 T1- 508
4 2 BHK 73.81 T1- 509
4 3 BHK 102.5 T1- 510
4 3 BHK 101.42 T1- 511
4 2 BHK 71.68 T1- 512
5 2 BHK 68.1 T1- 601
5 3 BHK 86.54 T1- 602
5 3 BHK 86.54 T1- 603
5 2 BHK 68.32 T1- 604
5 2 BHK 68.56 T1- 605
5 3 BHK 102.5 T1- 606
5 3 BHK 102.5 T1- 607
5 2 BHK 68.56 T1- 608
5 2 BHK 73.81 T1- 609
5 3 BHK 102.5 T1- 610
5 3 BHK 101.42 T1- 611
5 2 BHK 71.68 T1- 612
6 2 BHK 68.1 T1- 701
6 3 BHK 86.54 T1- 702
6 3 BHK 86.54 T1- 703
6 2 BHK 68.32 T1- 704
6 2 BHK 68.56 T1- 705
6 3 BHK 102.5 T1- 706
6 3 BHK 102.5 T1- 707
6 2 BHK 68.56 T1- 708
6 2 BHK 73.81 T1- 709
6 3 BHK 102.5 T1- 710
6 3 BHK 101.42 T1- 711
6 2 BHK 71.68 T1- 712
7 2 BHK 68.1 T1- 801
7 3 BHK 86.54 T1- 802
7 3 BHK 86.54 T1- 803
7 2 BHK 68.32 T1- 804
7 2 BHK 68.56 T1- 805
7 3 BHK 102.5 T1- 806
7 3 BHK 102.5 T1- 807
7 2 BHK 68.56 T1- 808
7 2 BHK 73.81 T1- 809
7 3 BHK 102.5 T1- 810
7 3 BHK 101.42 T1- 811
7 2 BHK 71.68 T1- 812
8 2 BHK 68.1 T1- 901
8 3 BHK 86.54 T1- 902
8 3 BHK 86.54 T1- 903
8 2 BHK 68.32 T1- 904
8 2 BHK 68.56 T1- 905
8 3 BHK 102.5 T1- 906
8 3 BHK 102.5 T1- 907
8 2 BHK 68.56 T1- 908
8 2 BHK 73.81 T1- 909
8 3 BHK 102.5 T1- 910
8 3 BHK 101.42 T1- 911
8 2 BHK 71.68 T1- 912
9 2 BHK 68.1 T1- 1001
9 3 BHK 86.54 T1- 1002
9 3 BHK 86.54 T1- 1003
9 2 BHK 68.32 T1- 1004
9 2 BHK 68.56 T1- 1005
9 3 BHK 102.5 T1- 1006
9 3 BHK 102.5 T1- 1007
9 2 BHK 68.56 T1- 1008
9 2 BHK 73.81 T1- 1009
9 3 BHK 102.5 T1- 1010
9 3 BHK 101.42 T1- 1011
9 2 BHK 71.68 T1- 1012
10 2 BHK 68.1 T1- 1101
10 3 BHK 86.54 T1- 1102
10 3 BHK 86.54 T1- 1103
10 2 BHK 68.32 T1- 1104
10 2 BHK 68.56 T1- 1105
10 3 BHK 102.5 T1- 1106
10 3 BHK 102.5 T1- 1107
10 2 BHK 68.56 T1- 1108
10 2 BHK 73.81 T1- 1109
10 3 BHK 102.5 T1- 1110
10 3 BHK 101.42 T1- 1111
10 2 BHK 71.68 T1- 1112
11 2 BHK 68.1 T1- 1201
11 3 BHK 86.54 T1- 1202
11 3 BHK 86.54 T1- 1203
11 2 BHK 68.32 T1- 1204
11 2 BHK 68.56 T1- 1205
11 3 BHK 102.5 T1- 1206
11 3 BHK 102.5 T1- 1207
11 2 BHK 68.56 T1- 1208
11 2 BHK 73.81 T1- 1209
11 3 BHK 102.5 T1- 1210
11 3 BHK 101.42 T1- 1211
11 2 BHK 71.68 T1- 1212
12 2 BHK 68.1 T1- 1301
12 3 BHK 86.54 T1- 1302
12 3 BHK 86.54 T1- 1303
12 2 BHK 68.32 T1- 1304
12 2 BHK 68.56 T1- 1305
12 3 BHK 102.5 T1- 1306
12 3 BHK 102.5 T1- 1307
12 2 BHK 68.56 T1- 1308
12 2 BHK 73.81 T1- 1309
12 3 BHK 102.5 T1- 1310
12 3 BHK 101.42 T1- 1311
12 2 BHK 71.68 T1- 1312
13 2 BHK 68.1 T1- 1401
13 3 BHK 86.54 T1- 1402
13 3 BHK 86.54 T1- 1403
13 2 BHK 68.32 T1- 1404
13 2 BHK 68.56 T1- 1405
13 3 BHK 102.5 T1- 1406
13 3 BHK 102.5 T1- 1407
13 2 BHK 68.56 T1- 1408
13 2 BHK 73.81 T1- 1409
13 3 BHK 102.5 T1- 1410
13 3 BHK 101.42 T1- 1411
13 2 BHK 71.68 T1- 1412
14 2 BHK 68.1 T1- 1501
14 3 BHK 86.54 T1- 1502
14 3 BHK 86.54 T1- 1503
14 2 BHK 68.32 T1- 1504
14 2 BHK 68.56 T1- 1505
14 3 BHK 102.5 T1- 1506
14 3 BHK 102.5 T1- 1507
14 2 BHK 68.56 T1- 1508
14 2 BHK 73.81 T1- 1509
14 3 BHK 102.5 T1- 1510
14 3 BHK 101.42 T1- 1511
14 2 BHK 71.68 T1- 1512
15 2 BHK 68.1 T1- 1601
15 3 BHK 86.54 T1- 1602
15 3 BHK 86.54 T1- 1603
15 2 BHK 68.32 T1- 1604
15 2 BHK 68.56 T1- 1605
15 3 BHK 102.5 T1- 1606
15 3 BHK 102.5 T1- 1607
15 2 BHK 68.56 T1- 1608
15 2 BHK 73.81 T1- 1609
15 3 BHK 102.5 T1- 1610
15 3 BHK 101.42 T1- 1611
15 2 BHK 71.68 T1- 1612
16 2 BHK 68.1 T1- 1701
16 3 BHK 86.54 T1- 1702
16 3 BHK 86.54 T1- 1703
16 2 BHK 68.32 T1- 1704
16 2 BHK 68.56 T1- 1705
16 3 BHK 102.5 T1- 1706
16 3 BHK 102.5 T1- 1707
16 2 BHK 68.56 T1- 1708
16 2 BHK 73.81 T1- 1709
16 3 BHK 102.5 T1- 1710
16 3 BHK 101.42 T1- 1711
16 2 BHK 71.68 T1- 1712
17 2 BHK 68.91 T1- 1801
17 3 BHK 86.54 T1- 1802
17 3 BHK 86.54 T1- 1803
17 2 BHK 69.13 T1- 1804
17 2 BHK 69.37 T1- 1805
17 3 BHK 104.43 T1- 1806
17 3 BHK 104.43 T1- 1807
17 2 BHK 69.37 T1- 1808
17 2 BHK 74.62 T1- 1809
17 3 BHK 104.43 T1- 1810
17 3 BHK 102.5 T1- 1811
17 2 BHK 72.5 T1- 1812
18 4 BHK 146.46 T1- 1901
18 4 BHK 149.31 T1- 1902
18 4 BHK 162.32 T1- 1903
18 4 BHK 162.32 T1- 1904
18 4 BHK 173.97 T1- 1905
18 4 BHK 169.33 T1- 1906
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 HPPL Signed FS.Pdf
Fd 2 Annexure 70 Balance Sheet.Pdf
Fd 3 Annexure 70 Balance Sheet.Pdf
Fd 4 HPPL Signed FS.Pdf
Fd 5 Annexure 71 P&L.Pdf
Fd 6 Annexure 71 P&L.Pdf
Fd 7 Annexure 72 ITR FY 24-25 HPPL.Pdf
Fd 8 Annexure 72 ITR FY 23-24 HPPL.Pdf
Fd 9 Annexure 72 ITR FY 2022-23 HPPL.Pdf
Fd 10 Annexure 73.Pdf
Fd 11 Annexure 73 HPPL Directors Report 23-24.Pdf
Fd 12 Annexure 73 HPPL Directors Report 22-23.Pdf
Fd 13 HPPL Signed FS.Pdf
Fd 14 Annexure 74 Cash Flow.Pdf
Fd 15 Annexure 74 Cash Flow.Pdf
Fd 16 HPPL Signed FS.Pdf
Fd 17 Annexure 75 Auditor Report.Pdf
Fd 18 Annexure 75 Auditor Report.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Annexure 113 Village Map.Pdf
Od 2 Annexure 113 CDP.Pdf
Od 3 Annexure 113 ADLR Sketch.Pdf
Od 4 Annexure 113 Development Plan.Pdf
Od 5 Annexure 113 Modified DP.Pdf
Od 6 Annexure 113 BDA Work Order.Pdf
Od 7 Annexure 113 - Clarification On Land Cost.Pdf
Od 8 Annexure 113 Break-Up Types Of Units.Pdf
Od 9 Annexure 113 Kindle STP Drawings.Pdf
Od 10 Annexure 113 Estimated Cost Of Civil Works - Certified By Engineer.Pdf
Od 11 Annexure 113 Amenities & Common Area Details.Pdf
Ed 1 09-03-2026
Ed 2 09-03-2026
Ed 3 09-03-2026
Ed 4 09-03-2026
Ed 5 18-03-2026
Ed 6 18-03-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 923020056845503
IFSC UTIB0001997
Branch Address Cunningham Road
Country/City