Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

DS Max Sky Samurai RERA Details - PRM/KA/RERA/1250/304/PR/150224/006622 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for DS Max Sky Samurai under registration PRM/KA/RERA/1250/304/PR/150224/006622 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/150224/006622
  • Project Name DS MAX SKY SAMURAI
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 December 2028
  • Documents 89 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 March 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

DS-MAX PROPERTIES PRIVATE LIMITED
Registered Address I FLOOR, NO.1854, DS-MAX PROPERTIES PVT LTD, ,30TH B CROSS 5TH BLOCK, HBR LAYOUT I STAGE, ,Bengaluru South ,Bengaluru Urban-560102
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 36/1 OF DEVALAPURA VILLAGE , ANUGONDANAHALLI HOBLI , Hosakote , Bengaluru Rural, Karnataka - 560067

RERA Coordinates

Latitude, Longitude 12.98387, 77.82542
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/353/2022-23
Authority Local Planing Authority
Approved Date 12 June 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Sky Samurai 2 18 0 224 Residential 44.5 14 285

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Sky Samurai
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 65.03 1
-1 2 BHK 65.03 2
-1 2 BHK 65.03 3
-1 2 BHK 65.03 4
-1 2 BHK 65.03 5
-1 2 BHK 65.03 6
-1 2 BHK 62.15 7
-1 2 BHK 62.24 8
-1 2 BHK 62.24 9
-1 3 BHK 79.43 10
-1 3 BHK 86.86 11
-1 2 BHK 66.33 12
-1 3 BHK 85.65 13
-1 3 BHK 91.97 14
-1 3 BHK 88.62 15
-1 3 BHK 88.62 16
GF 2 BHK 65.03 1
GF 2 BHK 65.03 2
GF 2 BHK 65.03 3
GF 2 BHK 65.03 4
GF 2 BHK 65.03 5
GF 2 BHK 65.03 6
GF 2 BHK 62.15 7
GF 2 BHK 62.24 8
GF 2 BHK 62.24 9
GF 3 BHK 79.43 10
GF 3 BHK 86.86 11
GF 2 BHK 66.33 12
GF 3 BHK 85.65 13
GF 3 BHK 91.97 14
GF 3 BHK 88.62 15
GF 3 BHK 88.62 16
1 2 BHK 70.79 1
1 2 BHK 70.79 2
1 2 BHK 70.79 3
1 2 BHK 70.79 4
1 2 BHK 70.79 5
1 2 BHK 70.79 6
1 2 BHK 76.45 7
1 2 BHK 70.6 8
1 2 BHK 70.6 9
1 3 BHK 86.58 10
1 3 BHK 104.6 11
1 2 BHK 66.33 12
1 3 BHK 88.62 13
1 3 BHK 91.97 14
1 3 BHK 88.62 15
1 3 BHK 88.62 16
2 2 BHK 70.79 1
2 2 BHK 70.79 2
2 2 BHK 70.79 3
2 2 BHK 70.79 4
2 2 BHK 70.79 5
2 2 BHK 70.79 6
2 2 BHK 76.45 7
2 2 BHK 70.6 8
2 2 BHK 70.6 9
2 3 BHK 86.58 10
2 3 BHK 104.6 11
2 2 BHK 66.33 12
2 3 BHK 88.62 13
2 3 BHK 91.97 14
2 3 BHK 88.62 15
2 3 BHK 88.62 16
3 2 BHK 70.79 1
3 2 BHK 70.79 2
3 2 BHK 70.79 3
3 2 BHK 70.79 4
3 2 BHK 70.79 5
3 2 BHK 70.79 6
3 2 BHK 76.45 7
3 2 BHK 70.6 8
3 2 BHK 70.6 9
3 3 BHK 86.58 10
3 3 BHK 104.6 11
3 2 BHK 66.33 12
3 3 BHK 88.62 13
3 3 BHK 91.97 14
3 3 BHK 88.62 15
3 3 BHK 88.62 16
4 2 BHK 70.79 1
4 2 BHK 70.79 2
4 2 BHK 70.79 3
4 2 BHK 70.79 4
4 2 BHK 70.79 5
4 2 BHK 70.79 6
4 2 BHK 76.45 7
4 2 BHK 70.6 8
4 2 BHK 70.6 9
4 3 BHK 86.58 10
4 3 BHK 104.6 11
4 2 BHK 66.33 12
4 3 BHK 88.62 13
4 3 BHK 91.97 14
4 3 BHK 88.62 15
4 3 BHK 88.62 16
5 2 BHK 70.79 1
5 2 BHK 70.79 2
5 2 BHK 70.79 3
5 2 BHK 70.79 4
5 2 BHK 70.79 5
5 2 BHK 70.79 6
5 2 BHK 76.45 7
5 2 BHK 70.6 8
5 2 BHK 70.6 9
5 3 BHK 86.58 10
5 3 BHK 104.6 11
5 2 BHK 66.33 12
5 3 BHK 88.62 13
5 3 BHK 91.97 14
5 3 BHK 88.62 15
5 3 BHK 88.62 16
5 3 BHK 83.79 17
5 3 BHK 105.9 18
5 3 BHK 86.3 19
5 2 BHK 70.79 20
5 2 BHK 70.79 21
6 2 BHK 70.79 1
6 2 BHK 70.79 2
6 2 BHK 70.79 3
6 2 BHK 70.79 4
6 2 BHK 70.79 5
6 2 BHK 70.79 6
6 2 BHK 76.45 7
6 2 BHK 70.6 8
6 2 BHK 70.6 9
6 3 BHK 86.58 10
6 3 BHK 104.6 11
6 2 BHK 66.33 12
6 3 BHK 88.62 13
6 3 BHK 91.97 14
6 3 BHK 88.62 15
6 3 BHK 88.62 16
6 3 BHK 83.79 17
6 3 BHK 105.9 18
6 3 BHK 86.3 19
6 2 BHK 70.79 20
6 2 BHK 70.79 21
7 2 BHK 70.79 1
7 2 BHK 70.79 2
7 2 BHK 70.79 3
7 2 BHK 70.79 4
7 2 BHK 70.79 5
7 2 BHK 70.79 6
7 2 BHK 76.45 7
7 2 BHK 70.6 8
7 2 BHK 70.6 9
7 3 BHK 86.58 10
7 3 BHK 104.6 11
7 2 BHK 66.33 12
7 3 BHK 88.62 13
7 3 BHK 91.97 14
7 3 BHK 88.62 15
7 3 BHK 88.62 16
7 3 BHK 83.79 17
7 3 BHK 105.9 18
7 3 BHK 86.3 19
7 2 BHK 70.79 20
7 2 BHK 70.79 21
8 2 BHK 70.79 1
8 2 BHK 70.79 2
8 2 BHK 70.79 3
8 2 BHK 70.79 4
8 2 BHK 70.79 5
8 2 BHK 70.79 6
8 2 BHK 76.45 7
8 2 BHK 70.6 8
8 2 BHK 70.6 9
8 3 BHK 86.58 10
8 3 BHK 104.6 11
8 2 BHK 66.33 12
8 3 BHK 88.62 13
8 3 BHK 91.97 14
8 3 BHK 88.62 15
8 3 BHK 88.62 16
8 3 BHK 83.79 17
8 3 BHK 105.9 18
8 3 BHK 86.3 19
8 2 BHK 70.79 20
8 2 BHK 70.79 21
9 2 BHK 70.79 1
9 2 BHK 70.79 2
9 2 BHK 70.79 3
9 2 BHK 70.79 4
9 2 BHK 70.79 5
9 2 BHK 70.79 6
9 2 BHK 76.45 7
9 2 BHK 70.6 8
9 2 BHK 70.6 9
9 3 BHK 86.58 10
9 3 BHK 104.6 11
9 2 BHK 66.33 12
9 3 BHK 88.62 13
9 3 BHK 91.97 14
9 3 BHK 88.62 15
9 3 BHK 88.62 16
9 3 BHK 83.79 17
9 3 BHK 105.9 18
9 3 BHK 86.3 19
9 2 BHK 70.79 20
9 2 BHK 70.79 21
10 2 BHK 70.79 1
10 2 BHK 70.79 2
10 2 BHK 70.79 3
10 2 BHK 70.79 4
10 2 BHK 70.79 5
10 2 BHK 70.79 6
10 2 BHK 76.45 7
10 2 BHK 70.6 8
10 2 BHK 70.6 9
10 3 BHK 86.58 10
10 3 BHK 104.6 11
10 2 BHK 66.33 12
10 3 BHK 88.62 13
10 3 BHK 91.97 14
10 3 BHK 88.62 15
10 3 BHK 88.62 16
10 3 BHK 83.79 17
10 3 BHK 105.9 18
10 3 BHK 86.3 19
10 2 BHK 70.79 20
10 2 BHK 70.79 21
11 2 BHK 70.79 1
11 2 BHK 70.79 2
11 2 BHK 70.79 3
11 2 BHK 70.79 4
11 2 BHK 70.79 5
11 2 BHK 70.79 6
11 2 BHK 76.45 7
11 2 BHK 70.6 8
11 2 BHK 70.6 9
11 3 BHK 86.58 10
11 3 BHK 104.6 11
11 2 BHK 66.33 12
11 3 BHK 88.62 13
11 3 BHK 91.97 14
11 3 BHK 88.62 15
11 3 BHK 88.62 16
11 3 BHK 83.79 17
11 3 BHK 105.9 18
11 3 BHK 86.3 19
11 2 BHK 70.79 20
11 2 BHK 70.79 21
12 2 BHK 70.79 1
12 2 BHK 70.79 2
12 2 BHK 70.79 3
12 2 BHK 70.79 4
12 2 BHK 70.79 5
12 2 BHK 70.79 6
12 2 BHK 76.45 7
12 2 BHK 70.6 8
12 2 BHK 70.6 9
12 3 BHK 86.58 10
12 3 BHK 104.6 11
12 2 BHK 66.33 12
12 3 BHK 88.62 13
12 3 BHK 91.97 14
12 3 BHK 88.62 15
12 3 BHK 88.62 16
12 3 BHK 83.79 17
12 3 BHK 105.9 18
12 3 BHK 86.3 19
12 2 BHK 70.79 20
12 2 BHK 70.79 21
13 2 BHK 70.79 1
13 2 BHK 70.79 2
13 2 BHK 70.79 3
13 2 BHK 70.79 4
13 2 BHK 70.79 5
13 2 BHK 70.79 6
13 2 BHK 76.45 7
13 2 BHK 70.6 8
13 2 BHK 70.6 9
13 3 BHK 86.58 10
13 3 BHK 104.6 11
13 2 BHK 66.33 12
13 3 BHK 88.62 13
13 3 BHK 91.97 14
13 3 BHK 88.62 15
13 3 BHK 88.62 16
13 3 BHK 83.79 17
13 3 BHK 105.9 18
13 3 BHK 86.3 19
13 2 BHK 70.79 20
13 2 BHK 70.79 21
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 22-23.Pdf
Fd 2 Balance Sheet And P&L 2021-22.Pdf
Fd 3 Balance Sheet 2020-21.Pdf
Fd 4 Profit And Loss 22-23.Pdf
Fd 5 Balance Sheet And P&L 2021-22.Pdf
Fd 6 Profit And Loss 2020-21.Pdf
Fd 7 Not Available.Pdf
Fd 8 Not Available.Pdf
Fd 9 Not Available.Pdf
Fd 10 Cashflow Statement 22-23.Pdf
Fd 11 Cashflow Statement 2021-22.Pdf
Fd 12 Financial Documents.Pdf
Fd 13 Audit Report 22-23.Pdf
Fd 14 Auditors Report 2021-22.Pdf
Fd 15 Financial Documents.Pdf
Fd 16 ITR 2022-23.Pdf
Fd 17 IT Returns 2021-22.Pdf
Fd 18 ITR FY 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Devalapura-Google.Pdf
Od 2 Single Plot Order.Pdf
Od 3 SINGLE PLOT PLAN.PDF
Od 4 MR 13.Pdf
Od 5 GPA.Pdf
Od 6 MOA & AOA -2021.Pdf
Od 7 SKYSAMURAI - Guidance Value.Pdf
Od 8 SAMURAI Cost Bifurcation.Pdf
Od 9 Sky Samurai Area Statement.Pdf
Od 10 Devalapura-Google.Pdf
Od 11 Devalapura-Location.Pdf
Od 12 Devalapura-CDP.Pdf
Od 13 STP Demarcation.PDF
Ed 1 12-02-2024
Ed 2 12-02-2024
Ed 3 12-02-2024
Ed 4 12-02-2024
Ed 5 12-02-2024
Ed 6 12-02-2024
Ed 7 12-02-2024
Ed 8 12-02-2024
Ed 9 12-02-2024
Ed 10 12-02-2024
Ed 11 12-02-2024
Ed 12 12-02-2024
Ed 13 12-02-2024
Ed 14 12-02-2024
Ed 15 12-02-2024
Ed 16 12-02-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 42473080587
IFSC HDFC0000382
Branch Address NA
Country/City