Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Habulus Tranquil RERA Details - PRM/KA/RERA/1251/310/PR/020126/008378 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Habulus Tranquil under registration PRM/KA/RERA/1251/310/PR/020126/008378 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/020126/008378
  • Project Name HABULUS TRANQUIL
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2031
  • Documents 101 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 December 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

HABULUS BUILDERS AND DEVELOPERS PRIVATE LIMITED
Registered Address No.501, Site No.1482 and 1483, Sri Nilaya Residency Deccan Palms Layout,Anantha Nagar, Electronic City Banagalore ,Bengaluru South ,Bengaluru Urban-560100
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey number 271/2 and 271/3, Hulimangala village , Jigani Hobli, Anekal Taluk, Bangalore , Bengaluru South , Bengaluru Urban, Karnataka - 560105

RERA Coordinates

Latitude, Longitude 12.814985, 77.657950
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 16/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 08 October 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TOWER-A 1 14 0 104 Residential 47.2 13 104
TOWER - B 1 14 0 104 Residential 47.2 13 104
TOWER - C 1 13 0 96 Residential 44.0 12 96
TOWER - D 1 13 0 96 Residential 44.0 12 96

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • TOWER-A
  • TOWER - B
  • TOWER - C
  • TOWER - D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 62.55 101
GF 2 BHK 62.55 102
GF 2 BHK 64.69 103
GF 2 BHK 68.51 104
GF 3 BHK 93.52 105
GF 3 BHK 82.35 106
GF 3 BHK 82.35 107
GF 3 BHK 82.35 108
1 2 BHK 62.55 201
1 2 BHK 62.55 202
1 2 BHK 64.69 203
1 2 BHK 68.51 204
1 3 BHK 93.52 205
1 3 BHK 82.35 206
1 3 BHK 82.35 207
1 3 BHK 82.35 208
2 2 BHK 62.55 301
2 2 BHK 62.55 302
2 2 BHK 64.69 303
2 2 BHK 68.51 304
2 3 BHK 93.52 305
2 3 BHK 82.35 306
2 3 BHK 82.35 307
2 3 BHK 82.35 308
3 2 BHK 62.55 401
3 2 BHK 62.55 402
3 2 BHK 64.69 403
3 2 BHK 68.51 404
3 3 BHK 93.52 405
3 3 BHK 82.35 406
3 3 BHK 82.35 407
3 3 BHK 82.35 408
4 2 BHK 62.55 501
4 2 BHK 62.55 502
4 2 BHK 64.69 503
4 2 BHK 68.51 504
4 3 BHK 93.52 505
4 3 BHK 82.35 506
4 3 BHK 82.35 507
4 3 BHK 82.35 508
5 2 BHK 62.55 601
5 2 BHK 62.55 602
5 2 BHK 64.69 603
5 2 BHK 68.51 604
5 3 BHK 93.52 605
5 3 BHK 82.35 606
5 3 BHK 82.35 607
5 3 BHK 82.35 608
6 2 BHK 62.55 701
6 2 BHK 62.55 702
6 2 BHK 64.69 703
6 2 BHK 68.51 704
6 3 BHK 93.52 705
6 3 BHK 82.35 706
6 3 BHK 82.35 707
6 3 BHK 82.35 708
7 2 BHK 62.55 801
7 2 BHK 62.55 802
7 2 BHK 64.69 803
7 2 BHK 68.51 804
7 3 BHK 93.52 805
7 3 BHK 82.35 806
7 3 BHK 82.35 807
7 3 BHK 82.35 808
8 2 BHK 62.55 901
8 2 BHK 62.55 902
8 2 BHK 64.69 903
8 2 BHK 68.51 904
8 3 BHK 93.52 905
8 3 BHK 82.35 906
8 3 BHK 82.35 907
8 3 BHK 82.35 908
9 2 BHK 62.55 1001
9 2 BHK 62.55 1002
9 2 BHK 64.69 1003
9 2 BHK 68.51 1004
9 3 BHK 93.52 1005
9 3 BHK 82.35 1006
9 3 BHK 82.35 1007
9 3 BHK 82.35 1008
10 2 BHK 62.55 1101
10 2 BHK 62.55 1102
10 2 BHK 64.69 1103
10 2 BHK 68.51 1104
10 3 BHK 93.52 1105
10 3 BHK 82.35 1106
10 3 BHK 82.35 1107
10 3 BHK 82.35 1108
11 2 BHK 62.55 1201
11 2 BHK 62.55 1202
11 2 BHK 64.69 1203
11 2 BHK 68.51 1204
11 3 BHK 93.52 1205
11 3 BHK 82.35 1206
11 3 BHK 82.35 1207
11 3 BHK 82.35 1208
12 2 BHK 62.55 1301
12 2 BHK 62.55 1302
12 2 BHK 64.69 1303
12 2 BHK 68.51 1304
12 3 BHK 93.52 1305
12 3 BHK 82.35 1306
12 3 BHK 82.35 1307
12 3 BHK 82.35 1308
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Not Applicable.Pdf
Fd 2 BALANCE SHEET WITH SCHEDULE.Pdf
Fd 3 BALANCE SHEET 22-23.Pdf
Fd 4 PROFIT AND LOSS 24-25.Pdf
Fd 5 PROFIT AND LOSS 23-24.Pdf
Fd 6 PROFIT AND LOSS 22-23.Pdf
Fd 7 ITR.Pdf
Fd 8 Not Applicable.Pdf
Fd 9 ITR-22-23.Pdf
Fd 10 Not Applicable.Pdf
Fd 11 Not Applicable.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 Not Applicable.Pdf
Fd 14 Habulus Builders Cash Flow 2024.Pdf
Fd 15 Not Applicable.Pdf
Fd 16 Not Applicable.Pdf
Fd 17 Not Applicable.Pdf
Fd 18 Not Applicable.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 Akarband 271-2.Pdf
Od 2 Conversion Sketch 271-2.Pdf
Od 3 EC-01-04 -2004 To 17-03-2025 Sy No 271-2.Pdf
Od 4 EC-01-04 -2004 To 17-03-2025 Sy No 271-2.Pdf
Od 5 RTC 2004 To Till Date 271-2.Pdf
Od 6 Conversion Sketch 271-3.Pdf
Od 7 EC-01-04 -2004 To 17-03-2025 Syno 271-3.Pdf
Od 8 EC-2712 And 2713 From 01-04-2022 To 06-09-2025.Pdf
Od 9 Mutation 271-3.Pdf
Od 10 Single Layout Plan.Pdf
Od 11 Single Site Plan Approval Letter.Pdf
Od 12 Sale Deed 271-2 BSR Developers.Pdf
Od 13 Sale Deed 271-3 BSR Developers.Pdf
Od 14 Cattle Road Relocation.Pdf
Od 15 Correction Of Carriageway Path Passing Through S No 271-2 And 271-3.Pdf
Od 16 ECC-06092025-5292816.Pdf
Od 17 Family Tree.Pdf
Od 18 MR 271-2.Jpeg
Od 19 MR 271-3.Jpeg
Od 20 MR H43.Png
Od 21 MR H42.Png
Od 22 Podi Sketch.Pdf
Od 23 Survey Records 271-2 And 271-3 Tranquillise.Pdf
Od 24 Tippani.Pdf
Od 25 Ground Floor Plan-1.Pdf
Od 26 Terrace Floor Plan.Pdf
Od 27 Cdp.Pdf
Od 28 Akarband Tranquil.Pdf
Od 29 Endorsement From KIADB.Pdf
Od 30 First Floor Plan.Pdf
Od 31 Basement Floor Plan.Pdf
Od 32 04th To 12th Floor Plan.Pdf
Ed 1 23-12-2025
Ed 2 23-12-2025
Ed 3 23-12-2025
Ed 4 23-12-2025
Ed 5 23-12-2025
Ed 6 23-12-2025
Ed 7 23-12-2025
Ed 8 23-12-2025
Ed 9 23-12-2025
Ed 10 23-12-2025
Ed 11 23-12-2025
Ed 12 23-12-2025
Ed 13 23-12-2025
Ed 14 23-12-2025
Ed 15 23-12-2025
Ed 16 23-12-2025
Ed 17 23-12-2025
Ed 18 23-12-2025
Ed 19 23-12-2025
Ed 20 23-12-2025
Ed 21 23-12-2025
Ed 22 23-12-2025
Ed 23 31-12-2025
Ed 24 31-12-2025
Ed 25 31-12-2025
Ed 26 31-12-2025
Ed 27 31-12-2025
Ed 28 31-12-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AU Small Finance Bank
Account Number (RERA) 2502255677752265
IFSC AUBL0002556
Branch Address HSR LAYOUT
Country/City