Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Habulus Oasis Grove RERA Details - PRM/KA/RERA/1251/308/PR/070526/008630 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Habulus Oasis Grove under registration PRM/KA/RERA/1251/308/PR/070526/008630 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/070526/008630
  • Project Name Habulus Oasis Grove
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 March 2031
  • Documents 109 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 March 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

HABULUS HOMES PRIVATE LIMITED
Registered Address SITE NO 1482,1483, SRI NILAYA RESIDENCY 2,, DECCAN PALMS LAYOUT, ANANTH NAGAR,ELECTRONIC CITY PHASE 2, Bengaluru (Bangalore) Urban, Karnataka, 560100 ,Bengaluru South ,Bengaluru Urban-560100
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey Nos. 69/1, 70/4, 72/1, 72/2, and 73/1 , Maragondanahalli Village, Jigani Hobli, Anekal Taluk, Bengaluru – 560105 , Anekal , Bengaluru Urban, Karnataka - 560105

RERA Coordinates

Latitude, Longitude 12.82604, 77.653322
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 29/25-26
Authority BDA - Bangalore Development Authority
Approved Date 29 January 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 4 1 18 1 144 Residential 60.8 17 144
TOWER 5 1 19 1 152 Residential 64.0 18 152

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Tower 4
  • TOWER 5
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 51.72 001
-1 3 BHK 82.46 002
-1 3 BHK 66.28 003
-1 3 BHK 112.8 004
-1 3 BHK 110.73 005
-1 2 BHK 57.86 006
-1 3 BHK 84.98 007
-1 3 BHK 98.48 008
GF 2 BHK 51.72 101
GF 3 BHK 82.46 102
GF 3 BHK 66.28 103
GF 3 BHK 112.8 104
GF 3 BHK 110.73 105
GF 2 BHK 57.86 106
GF 3 BHK 84.98 107
GF 3 BHK 98.48 108
1 2 BHK 51.72 201
1 3 BHK 82.46 202
1 3 BHK 66.28 203
1 3 BHK 112.8 204
1 3 BHK 110.73 205
1 2 BHK 57.86 206
1 3 BHK 84.98 207
1 3 BHK 98.48 208
2 2 BHK 51.72 301
2 3 BHK 82.46 302
2 3 BHK 66.28 303
2 3 BHK 112.8 304
2 3 BHK 110.73 305
2 2 BHK 57.86 306
2 3 BHK 84.98 307
2 3 BHK 98.48 308
3 2 BHK 51.72 401
3 3 BHK 82.46 402
3 3 BHK 66.28 403
3 3 BHK 112.8 404
3 3 BHK 110.73 405
3 2 BHK 57.86 406
3 3 BHK 84.98 407
3 3 BHK 98.48 408
4 2 BHK 51.72 501
4 3 BHK 82.46 502
4 3 BHK 66.28 503
4 3 BHK 112.8 504
4 3 BHK 110.73 505
4 2 BHK 57.86 506
4 3 BHK 84.98 507
4 3 BHK 98.48 508
5 2 BHK 51.72 601
5 3 BHK 82.46 602
5 3 BHK 66.28 603
5 3 BHK 112.8 604
5 3 BHK 110.73 605
5 2 BHK 57.86 606
5 3 BHK 84.98 607
5 3 BHK 98.48 608
6 2 BHK 51.72 701
6 3 BHK 82.46 702
6 3 BHK 66.28 703
6 3 BHK 112.8 704
6 3 BHK 110.73 705
6 2 BHK 57.86 706
6 3 BHK 84.98 707
6 3 BHK 98.48 708
7 2 BHK 51.72 801
7 3 BHK 82.46 802
7 3 BHK 66.28 803
7 3 BHK 112.8 804
7 3 BHK 110.73 805
7 2 BHK 57.86 806
7 3 BHK 84.98 807
7 3 BHK 98.48 808
8 2 BHK 51.72 901
8 3 BHK 82.46 902
8 3 BHK 66.28 903
8 3 BHK 112.8 904
8 3 BHK 110.73 905
8 2 BHK 57.86 906
8 3 BHK 84.98 907
8 3 BHK 98.48 908
9 2 BHK 51.72 1001
9 3 BHK 82.46 1002
9 3 BHK 66.28 1003
9 3 BHK 112.8 1004
9 3 BHK 110.73 1005
9 2 BHK 57.86 1006
9 3 BHK 84.98 1007
9 3 BHK 98.48 1008
10 2 BHK 51.72 1101
10 3 BHK 82.46 1102
10 3 BHK 66.28 1103
10 3 BHK 112.8 1104
10 3 BHK 110.73 1105
10 2 BHK 57.86 1106
10 3 BHK 84.98 1107
10 3 BHK 98.48 1108
11 2 BHK 51.72 1201
11 3 BHK 82.46 1202
11 3 BHK 66.28 1203
11 3 BHK 112.8 1204
11 3 BHK 110.73 1205
11 2 BHK 57.86 1206
11 3 BHK 84.98 1207
11 3 BHK 98.48 1208
12 2 BHK 51.72 1301
12 3 BHK 82.46 1302
12 3 BHK 66.28 1303
12 3 BHK 112.8 1304
12 3 BHK 110.73 1305
12 2 BHK 57.86 1306
12 3 BHK 84.98 1307
12 3 BHK 98.48 1308
13 2 BHK 51.72 1401
13 3 BHK 82.46 1402
13 3 BHK 66.28 1403
13 3 BHK 112.8 1404
13 3 BHK 110.73 1405
13 2 BHK 57.86 1406
13 3 BHK 84.98 1407
13 3 BHK 98.48 1408
14 2 BHK 51.72 1501
14 3 BHK 82.46 1502
14 3 BHK 66.28 1503
14 3 BHK 112.8 1504
14 3 BHK 110.73 1505
14 2 BHK 57.86 1506
14 3 BHK 84.98 1507
14 3 BHK 98.48 1508
15 2 BHK 51.72 1601
15 3 BHK 82.46 1602
15 3 BHK 66.28 1603
15 3 BHK 112.8 1604
15 3 BHK 110.73 1605
15 2 BHK 57.86 1606
15 3 BHK 84.98 1607
15 3 BHK 98.48 1608
16 2 BHK 51.72 1701
16 3 BHK 82.46 1702
16 3 BHK 66.28 1703
16 3 BHK 112.8 1704
16 3 BHK 110.73 1705
16 2 BHK 57.86 1706
16 3 BHK 84.98 1707
16 3 BHK 98.48 1708
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Finishing Works Miscellaneous Works % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BALANCE SHEET 24-25.Pdf
Fd 2 BALANCE SHEET 23-24.Pdf
Fd 3 BALANCE SHEET 22-23.Pdf
Fd 4 PROFIT AND LOSS 24-25.Pdf
Fd 5 PROFIT And LOSS 23-24.Pdf
Fd 6 PROFIT AND LOSS 22-23.Pdf
Fd 7 ITR.Pdf
Fd 8 ITR.Pdf
Fd 9 ITR 22-23.Pdf
Fd 10 Not Applicable.Pdf
Fd 11 Not Applicable.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 CASHFLOW 2025.Pdf
Fd 14 Habulus Homes Cash Flow 2024.Pdf
Fd 15 CASHFLOW 22-23.Pdf
Fd 16 AUDIT REPORT 24-25.Pdf
Fd 17 Habulus Homes Audit Report.Pdf
Fd 18 Habulus Homes Audit Report.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Estimation.Pdf
Od 2 HAL NOC.Pdf
Od 3 Land Cost Calculation.Pdf
Od 4 OASIS DEMARCATION.Pdf
Od 5 Schedules.Pdf
Od 6 STP DEMARK.Pdf
Od 7 STP DRAWING.Pdf
Od 8 CDP.Pdf
Od 9 Google Image.Pdf
Od 10 PROJECT PHOTO 1.Jpeg
Od 11 PROJECT PHOTO.Jpeg
Od 12 BOREWELL PHOTO.Jpeg
Od 13 BOREWELL PHOTO 2.Jpeg
Od 14 Survey Hissa Documents 69 1.Pdf
Od 15 Akarband 70 4.Pdf
Od 16 Survey Documents 70 4.Pdf
Od 17 Hissa 70 4.Pdf
Od 18 Tippani 70 4.Pdf
Od 19 Akarbandh 72 1.Pdf
Od 20 GPA 72-1 Oasis Grove.Pdf
Od 21 Survey Hissa 72 1.Pdf
Od 22 JDA 72-1 Oasis Grove.Pdf
Od 23 Survey Hissa 72 2.Pdf
Od 24 Akarbandh 72 2.Pdf
Od 25 Akarbandh 73 1.Pdf
Od 26 GPA-Survey No 73-1.Pdf
Od 27 JDA - 73 1.Pdf
Od 28 Hissa 73 1.Pdf
Od 29 Tippani 73 1 Pdf.Pdf
Od 30 DP Approval Letter.Pdf
Od 31 BASEMENT FLOOR PLAN.Pdf
Od 32 FLOOR PLAN 1 TO 17 9 TO 15 And 17.Pdf
Od 33 FLOOR PLAN 5 TO 8 AND 16.Pdf
Od 34 SECTION.Pdf
Od 35 SILT FLOOR PLAN.Pdf
Od 36 TERRACE FLOOR PLAN.Pdf
Od 37 DPPlan Oasis Grove.Pdf
Od 38 Maragondanahalli Village Map.Pdf
Ed 1 22-04-2026
Ed 2 22-04-2026
Ed 3 22-04-2026
Ed 4 22-04-2026
Ed 5 22-04-2026
Ed 6 22-04-2026
Ed 7 22-04-2026
Ed 8 22-04-2026
Ed 9 22-04-2026
Ed 10 22-04-2026
Ed 11 22-04-2026
Ed 12 22-04-2026
Ed 13 22-04-2026
Ed 14 22-04-2026
Ed 15 22-04-2026
Ed 16 22-04-2026
Ed 17 22-04-2026
Ed 18 22-04-2026
Ed 19 22-04-2026
Ed 20 22-04-2026
Ed 21 22-04-2026
Ed 22 22-04-2026
Ed 23 22-04-2026
Ed 24 22-04-2026
Ed 25 22-04-2026
Ed 26 04-05-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44959784623
IFSC SBIN0030495
Branch Address HSR-6TH SECTOR
Country/City