Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Mana Vista RERA Details - PRM/KA/RERA/1251/308/PR/150325/007585 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mana Vista under registration PRM/KA/RERA/1251/308/PR/150325/007585 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/150325/007585
  • Project Name MANA VISTA
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2030
  • Documents 74 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MANA PROJECTS PRIVATE LIMITED
Registered Address 3RD FLOOR, SY NO. 20/7, SWAMY LEGATO, KADUBISANAHALLI, MARATHAHALLI OUTER RING ROAD,BANGALORE ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy no 191, Sy no 190/1, 190/2, 190/3, and 190/4 Gattahalli Village, Sarjapura hobli, Anekal Taluk, , Banglaore Urban District, Bangalore. , Anekal , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.877133704021224, 77.69876397328618
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 47/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 15 January 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
TOWER 1 2 11 1 155 Residential 26.975 8 84
TOWER 2 2 11 1 155 Residential 26.975 8 74
TOWER 3 2 17 1 264 Residential 44.975 14 221

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
EWS 0 units
  • TOWER 1
  • TOWER 2
  • TOWER 3
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2BHK-2T 76.49 1
-1 EWS 14.96 2
-1 2BHK-2T 74.81 3
-1 EWS 16.08 4
-1 3BHK-2T 83.55 5
-1 3BHK-2T 83.55 6
-1 2BHK-2T 73.61 7
-1 EWS 16.08 8
GF 3BHK-3T 91.45 101
GF 2BHK-2T 74.81 102
GF EWS 16.08 103
GF 3BHK-2T 83.55 104
GF 3BHK-2T 83.55 105
GF 2BHK-2T 73.61 106
GF EWS 16.08 107
GF 2BHK + STUDY - 2T 68.87 108
GF 3BHK-2T 85.50 109
GF 3BHK-3T 92.75 110
1 3BHK-3T 91.45 201
1 2BHK-2T 74.81 202
1 EWS 16.08 203
1 3BHK-2T 83.55 204
1 3BHK-2T 83.55 205
1 2BHK-2T 73.61 206
1 EWS 16.08 207
1 2BHK + STUDY - 2T 68.87 208
1 3BHK-2T 85.50 209
1 3BHK-3T 92.75 210
2 3BHK-3T 91.45 301
2 2BHK-2T 74.81 302
2 EWS 16.08 303
2 3BHK-2T 83.55 304
2 3BHK-2T 83.55 305
2 2BHK-2T 73.61 306
2 EWS 16.08 307
2 2BHK + STUDY - 2T 68.87 308
2 3BHK-2T 85.50 309
2 3BHK-3T 92.75 310
3 3BHK-3T 91.45 401
3 2BHK-2T 74.81 402
3 EWS 16.08 403
3 3BHK-2T 83.55 404
3 3BHK-2T 83.55 405
3 2BHK-2T 73.61 406
3 EWS 16.08 407
3 2BHK + STUDY - 2T 68.87 408
3 3BHK-2T 85.50 409
3 3BHK-3T 92.75 410
4 3BHK-3T 91.45 501
4 2BHK-2T 74.81 502
4 EWS 16.08 503
4 3BHK-2T 83.55 504
4 3BHK-2T 83.55 505
4 2BHK-2T 73.61 506
4 EWS 16.08 507
4 2BHK + STUDY - 2T 68.87 508
4 3BHK-2T 85.50 509
4 3BHK-3T 92.75 510
5 3BHK-3T 91.45 601
5 2BHK-2T 74.81 602
5 EWS 16.08 603
5 3BHK-2T 83.55 604
5 3BHK-2T 83.55 605
5 2BHK-2T 73.61 606
5 EWS 16.08 607
5 2BHK + STUDY - 2T 68.87 608
5 3BHK-2T 85.50 609
5 3BHK-3T 92.75 610
6 2BHK-2T 74.81 701
6 EWS 16.08 702
6 3BHK-2T 83.55 703
6 3BHK-2T 83.55 704
6 2BHK-2T 73.61 705
6 EWS 16.08 706
6 2BHK + STUDY - 2T 68.87 707
6 3BHK-2T 85.50 708
6 2BHK-2T 76.67 709
6 EWS 16.08 710
7 3BHK-2T 83.55 801
7 3BHK-2T 83.55 802
7 2BHK-2T 73.61 803
7 EWS 16.08 804
7 2BHK + STUDY - 2T 68.87 805
7 3BHK-2T 85.50 806
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Amenities Smart Home Automation % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet MPPL FY 2023-24.Pdf
Fd 2 Balance Sheet MPPL FY 2022-23.Pdf
Fd 3 Balance Sheet MPPL FY 2021-22.Pdf
Fd 4 AUDIT REPORT MPPL FY 2023-24.Pdf
Fd 5 Auditors Report MPPL FY 2022-23.Pdf
Fd 6 Profit & Loss Account MPPL FY 2021-22.Pdf
Fd 7 ITR - V MPPL FY 2023-24.Pdf
Fd 8 ITR -V MPPL FY 2022-23.Pdf
Fd 9 ITR V MPPL FY 2021-22.Pdf
Fd 10 ITR - V MPPL FY 2023-24.Pdf
Fd 11 Director'S Report MPPL FY 2022-23.Pdf
Fd 12 Directors Report -MPPL FY 2021-22.Pdf
Fd 13 Cash Flow Statement MPPL FY 2023-24.Pdf
Fd 14 Cash Flow Statement MPPL FY 2022-23.Pdf
Fd 15 Cash Flow Statement MPPL FY 2021-22.Pdf
Fd 16 AUDIT REPORT MPPL FY 2023-24.Pdf
Fd 17 Auditors Report MPPL FY 2022-23.Pdf
Fd 18 MPPL AUDITORS REPORT FY 2021-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 Basement -1 Plan.Pdf
Od 2 Basement -2 Plan.Pdf
Od 3 Site Plan.Pdf
Od 4 Tower-1 And 2Ground 1 To 6th Floor Plan.Pdf
Od 5 Tower-1&2 7th 8th Floor Plan.Pdf
Od 6 Tower-1&2 Terrace,Elevation&Section Plan.Pdf
Od 7 Tower-3 Ground 1st To 14th Floor Plan.Pdf
Od 8 Tower-3 Terras Elevation Section Plan.Pdf
Ed 1 22-02-2025
Ed 2 22-02-2025
Ed 3 22-02-2025
Ed 4 22-02-2025
Ed 5 22-02-2025
Ed 6 22-02-2025
Ed 7 22-02-2025
Ed 8 22-02-2025
Ed 9 22-02-2025
Ed 10 22-02-2025
Ed 11 22-02-2025
Ed 12 22-02-2025
Ed 13 22-02-2025
Ed 14 22-02-2025
Ed 15 22-02-2025
Ed 16 22-02-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Karnataka Bank Ltd.
Account Number (RERA) 0083202600000301
IFSC KARB0000083
Branch Address Corporate Finance Brach, Kasturaba Road, Bangalore
Country/City