Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Mana Verdant RERA Details - PRM/KA/RERA/1251/309/PR/260523/005947 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Mana Verdant under registration PRM/KA/RERA/1251/309/PR/260523/005947 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/260523/005947
  • Project Name MANA VERDANT
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 December 2030
  • Documents 87 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 14 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MANA PROJECTS PVT LTD
Registered Address SY NO.20/7, SWAMY LEGATO 3RD FLOOR,KADUBISANAHALLI ,Bengaluru South ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address BBMP KATHA NO: 1359/33/4 & 36/4, Sy. No. 33/4, 36/4, 37/5, 37/6 , Shivanahalli Village, 10/3, 10/4 Jakkur Village, Yelahanka Hobli, Kempegowda Ward No. 001, Bangalore North Taluk , Bengaluru North , Bengaluru Urban, Karnataka - 560064

RERA Coordinates

Latitude, Longitude 13.08699729644829, 77.604179084301
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 80/2019- 2020
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 23 October 2020

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
South Tower 2 20 0 294 Residential 230.0 20 294
North Tower 2 20 0 190 Residential 220.0 18 190

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • South Tower
  • North Tower
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 82.88 G-1
-1 2 BHK 65.79 G-2
-1 2 BHK 65.79 G-3
-1 3 BHK 82.88 G-4
-1 2 BHK 65.79 G-5
-1 2 BHK 65.79 G-6
-1 2 BHK 65.79 G-7
-1 2 BHK 66.07 G-8
-1 2 BHK 66.07 G-9
-1 2 BHK 66.07 G-10
-1 3 BHK 81.56 G-11
-1 2 BHK 66.07 G-12
-1 2 BHK 66.07 G-13
-1 3 BHK 81.56 G-14
GF 3 BHK 82.88 101
GF 2 BHK 65.79 102
GF 2 BHK 65.79 103
GF 3 BHK 82.88 104
GF 2 BHK 65.79 105
GF 2 BHK 65.79 106
GF 2 BHK 65.79 107
GF 2 BHK 66.07 108
GF 2 BHK 66.07 109
GF 2 BHK 66.07 110
GF 3 BHK 81.56 111
GF 2 BHK 66.07 112
GF 2 BHK 66.07 113
GF 3 BHK 81.56 114
1 3 BHK 82.88 201
1 2 BHK 65.79 202
1 2 BHK 65.79 203
1 3 BHK 82.88 204
1 2 BHK 65.79 205
1 2 BHK 65.79 206
1 2 BHK 65.79 207
1 2 BHK 66.07 208
1 2 BHK 66.07 209
1 2 BHK 66.07 210
1 3 BHK 81.56 211
1 2 BHK 66.07 212
1 2 BHK 66.07 213
1 3 BHK 81.56 214
2 3 BHK 82.88 301
2 2 BHK 65.79 302
2 2 BHK 65.79 303
2 3 BHK 82.88 304
2 2 BHK 65.79 305
2 2 BHK 65.79 306
2 2 BHK 65.79 307
2 2 BHK 66.07 308
2 2 BHK 66.07 309
2 2 BHK 66.07 310
2 3 BHK 81.56 311
2 2 BHK 66.07 312
2 2 BHK 66.07 313
2 3 BHK 81.56 314
3 3 BHK 82.88 401
3 2 BHK 65.79 402
3 2 BHK 65.79 403
3 3 BHK 82.88 404
3 2 BHK 65.79 405
3 2 BHK 65.79 406
3 2 BHK 65.79 407
3 2 BHK 66.07 408
3 2 BHK 66.07 409
3 2 BHK 66.07 410
3 3 BHK 81.56 411
3 2 BHK 66.07 412
3 2 BHK 66.07 413
3 3 BHK 81.56 414
4 3 BHK 82.88 501
4 2 BHK 65.79 502
4 2 BHK 65.79 503
4 3 BHK 82.88 504
4 2 BHK 65.79 505
4 2 BHK 65.79 506
4 2 BHK 65.79 507
4 2 BHK 66.07 508
4 2 BHK 66.07 509
4 2 BHK 66.07 510
4 3 BHK 81.56 511
4 2 BHK 66.07 512
4 2 BHK 66.07 513
4 3 BHK 81.56 514
5 3 BHK 82.88 601
5 2 BHK 65.79 602
5 2 BHK 65.79 603
5 3 BHK 82.88 604
5 2 BHK 65.79 605
5 2 BHK 65.79 606
5 2 BHK 65.79 607
5 2 BHK 66.07 608
5 2 BHK 66.07 609
5 2 BHK 66.07 610
5 3 BHK 81.56 611
5 2 BHK 66.07 612
5 2 BHK 66.07 613
5 3 BHK 81.56 614
6 3 BHK 82.88 701
6 2 BHK 65.79 702
6 2 BHK 65.79 703
6 3 BHK 82.88 704
6 2 BHK 65.79 705
6 2 BHK 65.79 706
6 2 BHK 65.79 707
6 2 BHK 66.07 708
6 2 BHK 66.07 709
6 2 BHK 66.07 710
6 3 BHK 81.56 711
6 2 BHK 66.07 712
6 2 BHK 66.07 713
6 3 BHK 81.56 714
7 3 BHK 82.88 801
7 2 BHK 65.79 802
7 2 BHK 65.79 803
7 3 BHK 82.88 804
7 2 BHK 65.79 805
7 2 BHK 65.79 806
7 2 BHK 65.79 807
7 2 BHK 66.07 808
7 2 BHK 66.07 809
7 2 BHK 66.07 810
7 3 BHK 81.56 811
7 2 BHK 66.07 812
7 2 BHK 66.07 813
7 3 BHK 81.56 814
8 3 BHK 82.88 901
8 2 BHK 65.79 902
8 2 BHK 65.79 903
8 3 BHK 82.88 904
8 2 BHK 65.79 905
8 2 BHK 65.79 906
8 2 BHK 65.79 907
8 2 BHK 66.07 908
8 2 BHK 66.07 909
8 2 BHK 66.07 910
8 3 BHK 81.56 911
8 2 BHK 66.07 912
8 2 BHK 66.07 913
8 3 BHK 81.56 914
9 3 BHK 82.88 1001
9 2 BHK 65.79 1002
9 2 BHK 65.79 1003
9 3 BHK 82.88 1004
9 2 BHK 65.79 1005
9 2 BHK 65.79 1006
9 2 BHK 65.79 1007
9 2 BHK 66.07 1008
9 2 BHK 66.07 1009
9 2 BHK 66.07 1010
9 3 BHK 81.56 1011
9 2 BHK 66.07 1012
9 2 BHK 66.07 1013
9 3 BHK 81.56 1014
10 3 BHK 82.88 1101
10 2 BHK 65.79 1102
10 2 BHK 65.79 1103
10 3 BHK 82.88 1104
10 2 BHK 65.79 1105
10 2 BHK 65.79 1106
10 2 BHK 65.79 1107
10 2 BHK 66.07 1108
10 2 BHK 66.07 1109
10 2 BHK 66.07 1110
10 3 BHK 81.56 1111
10 2 BHK 66.07 1112
10 2 BHK 66.07 1113
10 3 BHK 81.56 1114
11 3 BHK 82.88 1201
11 2 BHK 65.79 1202
11 2 BHK 65.79 1203
11 3 BHK 82.88 1204
11 2 BHK 65.79 1205
11 2 BHK 65.79 1206
11 2 BHK 65.79 1207
11 2 BHK 66.07 1208
11 2 BHK 66.07 1209
11 2 BHK 66.07 1210
11 3 BHK 81.56 1211
11 2 BHK 66.07 1212
11 2 BHK 66.07 1213
11 3 BHK 81.56 1214
12 3 BHK 82.88 1301
12 2 BHK 65.79 1302
12 2 BHK 65.79 1303
12 3 BHK 82.88 1304
12 2 BHK 65.79 1305
12 2 BHK 65.79 1306
12 2 BHK 65.79 1307
12 2 BHK 66.07 1308
12 2 BHK 66.07 1309
12 2 BHK 66.07 1310
12 3 BHK 81.56 1311
12 2 BHK 66.07 1312
12 2 BHK 66.07 1313
12 3 BHK 81.56 1314
13 3 BHK 82.88 1401
13 2 BHK 65.79 1402
13 2 BHK 65.79 1403
13 3 BHK 82.88 1404
13 2 BHK 65.79 1405
13 2 BHK 65.79 1406
13 2 BHK 65.79 1407
13 2 BHK 66.07 1408
13 2 BHK 66.07 1409
13 2 BHK 66.07 1410
13 3 BHK 81.56 1411
13 2 BHK 66.07 1412
13 2 BHK 66.07 1413
13 3 BHK 81.56 1414
14 3 BHK 82.88 1501
14 2 BHK 65.79 1502
14 2 BHK 65.79 1503
14 3 BHK 82.88 1504
14 2 BHK 65.79 1505
14 2 BHK 65.79 1506
14 2 BHK 65.79 1507
14 2 BHK 66.07 1508
14 2 BHK 66.07 1509
14 2 BHK 66.07 1510
14 3 BHK 81.56 1511
14 2 BHK 66.07 1512
14 2 BHK 66.07 1513
14 3 BHK 81.56 1514
15 3 BHK 82.88 1601
15 2 BHK 65.79 1602
15 2 BHK 65.79 1603
15 3 BHK 82.88 1604
15 2 BHK 65.79 1605
15 2 BHK 65.79 1606
15 2 BHK 65.79 1607
15 2 BHK 66.07 1608
15 2 BHK 66.07 1609
15 2 BHK 66.07 1610
15 3 BHK 81.56 1611
15 2 BHK 66.07 1612
15 2 BHK 66.07 1613
15 3 BHK 81.56 1614
16 3 BHK 82.88 1701
16 2 BHK 65.79 1702
16 2 BHK 65.79 1703
16 3 BHK 82.88 1704
16 2 BHK 65.79 1705
16 2 BHK 65.79 1706
16 2 BHK 65.79 1707
16 2 BHK 66.07 1708
16 2 BHK 66.07 1709
16 2 BHK 66.07 1710
16 3 BHK 81.56 1711
16 2 BHK 66.07 1712
16 2 BHK 66.07 1713
16 3 BHK 81.56 1714
17 3 BHK 82.88 1801
17 2 BHK 65.79 1802
17 2 BHK 65.79 1803
17 3 BHK 82.88 1804
17 2 BHK 65.79 1805
17 2 BHK 65.79 1806
17 2 BHK 65.79 1807
17 2 BHK 66.07 1808
17 2 BHK 66.07 1809
17 2 BHK 66.07 1810
17 3 BHK 81.56 1811
17 2 BHK 66.07 1812
17 2 BHK 66.07 1813
17 3 BHK 81.56 1814
18 3 BHK 82.88 1901
18 2 BHK 65.79 1902
18 2 BHK 65.79 1903
18 3 BHK 82.88 1904
18 2 BHK 65.79 1905
18 2 BHK 65.79 1906
18 2 BHK 65.79 1907
18 2 BHK 66.07 1908
18 2 BHK 66.07 1909
18 2 BHK 66.07 1910
18 3 BHK 81.56 1911
18 2 BHK 66.07 1912
18 2 BHK 66.07 1913
18 3 BHK 81.56 1914
19 3 BHK 82.88 2001
19 2 BHK 65.79 2002
19 2 BHK 65.79 2003
19 3 BHK 82.88 2004
19 2 BHK 65.79 2005
19 2 BHK 65.79 2006
19 2 BHK 65.79 2007
19 2 BHK 66.07 2008
19 2 BHK 66.07 2009
19 2 BHK 66.07 2010
19 3 BHK 81.56 2011
19 2 BHK 66.07 2012
19 2 BHK 66.07 2013
19 3 BHK 81.56180297 2014
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
2 Completion Certificate
Fd 1 B S MPPL FY 2021-22.Pdf
Fd 2 B S MPPL FY 2020-21.Pdf
Fd 3 B S MPPL FY 2019-20.Pdf
Fd 4 P & L MPPL FY 2021-22.Pdf
Fd 5 P & L MPPL FY 2020-21.Pdf
Fd 6 P & L MPPL FY 2019-20.Pdf
Fd 7 Directos Report MPPL FY 2021-22.Pdf
Fd 8 Auditor'S Report MPPL FY 2019-20.Pdf
Fd 9 Auditor'S Report MPPL FY 2019-20.Pdf
Fd 10 Cash Flow Statements MPPL FY 2021-22.Pdf
Fd 11 Cash Flow Statement MPPL FY 2020-21.Pdf
Fd 12 Cash Flow Statement MPPL FY 2019-20.Pdf
Fd 13 Auditor'S Report MPPL FY 2021-22.Pdf
Fd 14 Auditor'S Report MPPL FY 2020-21.Pdf
Fd 15 Auditor'S Report MPPL FY 2019-20.Pdf
Fd 16 ITR V MPPL FY 2021-22.Pdf
Fd 17 ITR-V MPPL FY 2020-21.Pdf
Fd 18 ITR-V MPPL FY 2019-20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Photo 1 Project Photo
Ed 1 24-02-2023
Ed 2 24-02-2023
Ed 3 24-02-2023
Ed 4 24-02-2023
Ed 5 24-02-2023
Ed 6 24-02-2023
Ed 7 24-02-2023
Ed 8 24-02-2023
Ed 9 24-02-2023
Ed 10 24-02-2023
Ed 11 24-02-2023
Ed 12 24-02-2023
Ed 13 24-02-2023
Ed 14 24-02-2023
Ed 15 24-02-2023
Ed 16 24-02-2023
Ed 17 24-02-2023
Ed 18 24-02-2023
Ed 19 24-02-2023
Ed 20 24-02-2023
Ed 21 24-02-2023
Ed 22 24-02-2023
Ed 23 24-02-2023
Ed 24 24-02-2023
Ed 25 24-02-2023
Ed 26 24-02-2023
Ed 27 24-02-2023
Ed 28 16-05-2023
Ed 29 16-05-2023
Ed 30 16-05-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 923020002258126
IFSC UTIB0004891
Branch Address KADUBISANAHALLI MARATHAHALLI
Country/City