Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Rohan Ekanta RERA Details - PRM/KA/RERA/1251/446/PR/130723/006064 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Rohan Ekanta under registration PRM/KA/RERA/1251/446/PR/130723/006064 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/130723/006064
  • Project Name Rohan Ekanta Phase 3
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2028
  • Documents 91 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Rohan Builders
Registered Address 3rd Floor,KP Icon,12th Main Rd, HAL 2nd Stage, Indiranagar, ,Bengaluru, Karnataka 560008 ,Bengaluru East ,Bengaluru Urban-560008
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No. 129/1, 129/4, 129/6 and 130/3, , Gunjur Village, , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.92721245539022, 77.72485851566164
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0066/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 09 March 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing F 2 18 0 65 Residential 54.1 17 65
Wing G 2 20 0 72 Residential 60.0 19 72
Wing H 2 18 0 64 Residential 54.1 17 64
Wing I 2 20 0 70 Residential 60.0 19 70

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Wing F
  • Wing G
  • Wing H
  • Wing I
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 95.53 F 002
GF 3 BHK 95.93 F 101
GF 3 BHK 95.53 F 102
GF 2 BHK 71.19 F 104
1 3 BHK 95.53 F 201
1 3 BHK 95.53 F 202
1 2 BHK 73.73 F 203
1 2 BHK 70.83 F 204
2 3 BHK 95.53 F 301
2 3 BHK 95.53 F 302
2 2 BHK 73.37 F 303
2 2 BHK 70.83 F 304
3 3 BHK 95.53 F 401
3 3 BHK 95.53 F 402
3 2 BHK 73.37 F 403
3 2 BHK 70.83 F 404
4 3 BHK 95.53 F 501
4 3 BHK 95.53 F 502
4 2 BHK 73.37 F 503
4 2 BHK 70.83 F 504
5 3 BHK 95.53 F 601
5 3 BHK 95.53 F 602
5 2 BHK 73.37 F 603
5 2 BHK 70.83 F 604
6 3 BHK 95.53 F 701
6 3 BHK 95.53 F 702
6 2 BHK 73.37 F 703
6 2 BHK 70.83 F 704
7 3 BHK 96.61 F 801
7 3 BHK 96.61 F 802
7 2 BHK 77.16 F 803
7 2 BHK 74.52 F 804
8 3 BHK 96.09 F 901
8 3 BHK 96.09 F 902
8 2 BHK 73.37 F 903
8 2 BHK 70.83 F 904
9 3 BHK 95.64 F 1001
9 3 BHK 95.64 F 1002
9 2 BHK 73.48 F 1003
9 2 BHK 70.92 F 1004
10 3 BHK 95.53 F 1101
10 3 BHK 95.53 F 1102
10 2 BHK 73.37 F 1103
10 2 BHK 70.83 F 1104
11 3 BHK 95.53 F 1201
11 3 BHK 95.53 F 1202
11 2 BHK 73.37 F 1203
11 2 BHK 70.83 F 1204
12 3 BHK 95.53 F 1301
12 3 BHK 95.53 F 1302
12 2 BHK 73.37 F 1303
12 2 BHK 70.83 F 1304
13 3 BHK 95.53 F 1401
13 3 BHK 95.53 F 1402
13 2 BHK 73.37 F 1403
13 2 BHK 70.83 F 1404
14 3 BHK 95.53 F 1501
14 3 BHK 95.53 F 1502
14 2 BHK 73.37 F 1503
14 2 BHK 70.83 F 1504
15 3 BHK 94.7 F 1601
15 3 BHK 94.7 F 1602
15 2 BHK 70.83 F 1604
16 3 BHK 94.7 F 1701
16 3 BHK 94.7 F 1702
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Rohan Builders FY 2022 Balance Sheet, P&L, Schedules.Pdf
Fd 2 Rohan Builders FY 2021 Balance Sheet, P&L, Schedules.Pdf
Fd 3 Rohan Builders FY 2020 Balance Sheet, P&L, Schedules.Pdf
Fd 4 Rohan Builders FY 2022 Balance Sheet, P&L, Schedules.Pdf
Fd 5 Rohan Builders FY 2021 Balance Sheet, P&L, Schedules.Pdf
Fd 6 Rohan Builders FY 2020 Balance Sheet, P&L, Schedules.Pdf
Fd 7 NA.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Fd 10 NA.Pdf
Fd 11 NA.Pdf
Fd 12 NA.Pdf
Fd 13 NA.Pdf
Fd 14 NA.Pdf
Fd 15 NA.Pdf
Fd 16 Annexure 65 RB-ITR-FY-2022.Pdf
Fd 17 Annexure 65 RB-ITR-FY-2021.Pdf
Fd 18 Annexure 65 ITR 2020.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Annexure 77 Development Plan BDA Including Phase 3.Pdf
Od 2 Annexure 97 Fire Force Department Noc Rohan Antara.Pdf
Od 3 Annexure 100 SEIAA NOC Rohan Antara.Pdf
Od 4 Annexure 110 Relinquishment Deed Rohan Antara.Pdf
Od 5 BESCOM Fees Receipt For NOC.Jpg
Od 6 BWSSB Fees Receipt For NOC.Pdf
Od 7 Development Plan Work Order.Pdf
Od 8 Latest RTC (2022-23) FOR ALL SY NOS.Pdf
Od 9 HAL NOC Rohan Antara.Pdf
Od 10 Rohan Antara STP Plan.Pdf
Od 11 Rohan Antara STP Report.Pdf
Od 12 Govt Guideline Value Rohan Antara.Pdf
Od 13 CDP Superimposed Rohan Antara.Pdf
Od 14 Village Map Superimposed Rohan Antara.Pdf
Ed 1 07-07-2023
Ed 2 07-07-2023
Ed 3 07-07-2023
Ed 4 11-07-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank State Bank of Mauritius Ltd.
Account Number (RERA) 20062300593365
IFSC STCB0000065
Branch Address ULSOOR RAOD, BENGALURU
Country/City