residential Under Construction Source: rera.ka

Sai Veda Vilasa RERA Details - PRM/KA/RERA/1251/310/PR/250924/007066 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sai Veda Vilasa under registration PRM/KA/RERA/1251/310/PR/250924/007066 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/250924/007066
  • Project Name VEDA VILASA
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2026
  • Documents 82 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 02 February 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SAI SAMRUDHI CONSTRUCTIONS
Registered Address No. 416, 1st Floor, Vaddarapalya Village,Uttarahalli-Kengeri Road, BSK 5th Stage ,Bengaluru South ,Bengaluru Urban-560061
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Katha No. 6624/114, Sy. No. 114/1 & 114/2 , Kengeri Village , Bengaluru South , Bengaluru Urban, Karnataka - 560060

RERA Coordinates

Latitude, Longitude 12.900441, 77.476963
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSOUTH/0066/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 19 January 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
VEDA VILLAS 1 5 0 82 Residential 14.95 6 82

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • VEDA VILLAS
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 182.55 101
GF 3 BHK 182.55 102
GF 3 BHK 182.55 103
GF 3 BHK 182.55 104
GF 3 BHK 182.55 105
GF 3 BHK 182.55 106
GF 3 BHK 182.55 107
GF 3 BHK 182.55 108
GF 3 BHK 182.55 109
GF 3 BHK 182.55 110
GF 3 BHK 182.55 111
GF 3 BHK 182.55 112
GF 3 BHK 182.55 113
GF 3 BHK 182.55 114
GF 3 BHK 182.55 115
GF 3 BHK 182.55 116
GF 3 BHK 182.55 117
GF 3 BHK 181.19 118
GF 3 BHK 181.19 119
GF 3 BHK 181.19 120
GF 3 BHK 181.19 121
GF 3 BHK 181.19 122
GF 3 BHK 180.65 123
GF 3 BHK 190.51 124
GF 3 BHK 191.09 125
GF 3 BHK 190.51 126
GF 3 BHK 190.51 127
GF 3 BHK 190.51 128
GF 3 BHK 190.51 129
GF 3 BHK 190.51 130
GF 3 BHK 190.8 131
GF 3 BHK 190.51 132
GF 3 BHK 190.51 133
GF 3 BHK 190.8 134
GF 3 BHK 190.51 135
GF 3 BHK 190.51 136
GF 3 BHK 190.51 137
GF 3 BHK 190.51 138
GF 3 BHK 190.8 139
GF 3 BHK 190.51 140
GF 3 BHK 190.51 141
2 4 BHK 263.07 201
2 4 BHK 263.07 202
2 4 BHK 263.07 203
2 4 BHK 263.07 204
2 4 BHK 263.07 205
2 4 BHK 263.07 206
2 4 BHK 263.07 207
2 4 BHK 263.07 208
2 4 BHK 263.07 209
2 4 BHK 263.07 210
2 4 BHK 263.07 211
2 4 BHK 263.07 212
2 4 BHK 263.07 213
2 4 BHK 263.07 214
2 4 BHK 263.07 215
2 4 BHK 263.07 216
2 4 BHK 262.24 217
2 4 BHK 255 218
2 4 BHK 255.03 219
2 4 BHK 255.19 220
2 4 BHK 255.19 221
2 4 BHK 255.11 222
2 4 BHK 255.19 223
2 4 BHK 251.01 224
2 4 BHK 251.13 225
2 4 BHK 251.13 226
2 4 BHK 250.91 227
2 4 BHK 251.13 228
2 4 BHK 251.13 229
2 4 BHK 251.13 230
2 4 BHK 251.03 231
2 4 BHK 251.13 232
2 4 BHK 251.13 233
2 4 BHK 251.13 234
2 4 BHK 250.96 235
2 4 BHK 251.13 236
2 4 BHK 251.13 237
2 4 BHK 251.13 238
2 4 BHK 251.13 239
2 4 BHK 251.13 240
2 4 BHK 251.13 241
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Common Areas Water Conservation And Renewable Energy % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS.Jpg
Fd 2 BALANCE SHEET.Pdf
Fd 3 Not Available.Pdf
Fd 4 PL.Jpg
Fd 5 P&L.Pdf
Fd 6 Not Available.Pdf
Fd 7 NA - Firm.Pdf
Fd 8 NA - Firm.Pdf
Fd 9 NA - Firm.Pdf
Fd 10 Cash Flow Statement.Jpg
Fd 11 No Cash Flow.Pdf
Fd 12 No Cash Flow.Pdf
Fd 13 NA - Firm.Pdf
Fd 14 NA - Firm.Pdf
Fd 15 NA - Firm.Pdf
Fd 16 ITR ACK.Pdf
Fd 17 ITR ACK.Pdf
Fd 18 Not Available.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Od 1 BBMP Tax Receipt.Pdf
Od 2 Village MAP With Proposed Site.Pdf
Od 3 CDP PLAN.Pdf
Od 4 Survey Sketch.Pdf
Od 5 Amalgamation Deed.Pdf
Od 6 BUILDING LICENSE.Pdf
Od 7 RERA Account Confirmation Letter.Pdf
Od 8 CA Ongoing Project Certificate.Pdf
Od 9 Certified Copy Of Common Area And Amenities Details.Pdf
Od 10 Certified Estimated Copy.Pdf
Ed 1 03-07-2024
Ed 2 03-07-2024
Ed 3 03-07-2024
Ed 4 03-07-2024
Ed 5 03-07-2024
Ed 6 03-07-2024
Ed 7 03-07-2024
Ed 8 03-07-2024
Ed 9 03-07-2024
Ed 10 03-07-2024
Ed 11 20-07-2024
Ed 12 20-07-2024
Ed 13 26-08-2024
Ed 14 16-09-2024
Ed 15 16-09-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 42965181714
IFSC SBIN0040007
Branch Address MYSORE BANK CIRCLE
Country/City