Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.ka

SS Brindavanam RERA Details - PRM/KA/RERA/1251/308/PR/150523/005931 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for SS Brindavanam under registration PRM/KA/RERA/1251/308/PR/150523/005931 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/150523/005931
  • Project Name S S BRINDAVANAM
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 29 December 2025
  • Documents 99 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 27 February 2023 Expected commencement of civil works and foundation on site.
Original Completion 29 December 2025 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

S S BUILDERS AND DEVELOPERS
Registered Address SY No.84/3, Kada Agrahara Village, Sarjapura Main Road,,Sompura Gate, Near Sri Rama Temple, Bangalore ,Anekal ,Bengaluru Urban-562125
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No.84/3,85/4,85/6, YAMARE VILLAGE , SARJAPURA HOBLI, ANEKAL TALUK, BANGALORE URBAN DISTRICT , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.86383056640625, 77.7624282836914
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. LAO/252/2022-23
Authority BMRDA - Bangalore Metropolitan Region Development Authority
Approved Date 15 September 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
S S Brindavanam 0 5 1 137 Residential 14.95 3 128

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • S S Brindavanam
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 87.89 1
-1 3 BHK 89.37 2
-1 3 BHK 89.37 3
-1 3 BHK 87.42 4
-1 3 BHK 85.66 5
-1 3 BHK 91.60 6
-1 3 BHK 91.69 7
-1 3 BHK 91.69 8
-1 3 BHK 89.65 9
-1 2 BHK 66.61 10
-1 3 BHK 81.57 11
-1 2 BHK 75.16 12
-1 3 BHK 79.90 13
-1 2 BHK 73.49 14
-1 2 BHK 68.38 15
-1 2 BHK 77.95 16
-1 3 BHK 91.51 17
-1 3 BHK 86.49 18
-1 2 BHK 67.45 19
-1 3 BHK 83.89 20
-1 3 BHK 87.79 21
-1 2 BHK 79.99 22
-1 3 BHK 85.47 23
-1 3 BHK 86.12 24
-1 2 BHK 61.32 25
-1 2 BHK 62.62 26
-1 3 BHK 90.77 27
-1 3 BHK 90.77 28
-1 3 BHK 92.90 29
-1 2 BHK 55.18 30
-1 2 BHK 64.01 31
-1 2 BHK 60.01 32
GF 3 BHK 87.89 101
GF 3 BHK 89.37 102
GF 3 BHK 89.37 103
GF 3 BHK 87.42 104
GF 3 BHK 85.66 105
GF 3 BHK 91.60 106
GF 3 BHK 91.69 107
GF 3 BHK 91.69 108
GF 3 BHK 89.65 109
GF 2 BHK 66.61 110
GF 3 BHK 81.57 111
GF 2 BHK 75.16 112
GF 3 BHK 79.90 113
GF 2 BHK 73.49 114
GF 2 BHK 68.38 115
GF 2 BHK 77.95 116
GF 3 BHK 91.51 117
GF 3 BHK 86.49 118
GF 2 BHK 67.45 119
GF 3 BHK 83.89 120
GF 3 BHK 87.79 121
GF 2 BHK 79.99 122
GF 3 BHK 85.47 123
GF 3 BHK 86.12 124
GF 2 BHK 61.32 125
GF 2 BHK 62.62 126
GF 3 BHK 90.77 127
GF 3 BHK 90.77 128
GF 3 BHK 92.90 129
GF 2 BHK 55.18 130
GF 2 BHK 64.01 131
GF 2 BHK 60.01 132
1 3 BHK 87.89 201
1 3 BHK 89.37 202
1 3 BHK 89.37 203
1 3 BHK 87.42 204
1 3 BHK 85.66 205
1 3 BHK 91.60 206
1 3 BHK 91.69 207
1 3 BHK 91.69 208
1 3 BHK 89.65 209
1 2 BHK 66.61 210
1 3 BHK 81.57 211
1 2 BHK 75.16 212
1 3 BHK 79.90 213
1 2 BHK 73.49 214
1 2 BHK 68.38 215
1 2 BHK 77.95 216
1 3 BHK 91.51 217
1 3 BHK 86.49 218
1 2 BHK 67.45 219
1 3 BHK 83.89 220
1 3 BHK 87.79 221
1 2 BHK 79.99 222
1 3 BHK 85.47 223
1 3 BHK 86.12 224
1 2 BHK 61.32 225
1 2 BHK 62.62 226
1 3 BHK 90.77 227
1 3 BHK 90.77 228
1 3 BHK 92.90 229
1 2 BHK 55.18 230
1 2 BHK 64.01 231
1 2 BHK 60.01 232
2 3 BHK 87.89 301
2 3 BHK 89.37 302
2 3 BHK 89.37 303
2 3 BHK 87.42 304
2 3 BHK 85.66 305
2 3 BHK 91.60 306
2 3 BHK 91.69 307
2 3 BHK 91.69 308
2 3 BHK 89.65 309
2 2 BHK 66.61 310
2 3 BHK 81.57 311
2 2 BHK 75.16 312
2 3 BHK 79.90 313
2 2 BHK 73.49 314
2 2 BHK 68.38 315
2 2 BHK 77.95 316
2 3 BHK 91.51 317
2 3 BHK 86.49 318
2 2 BHK 67.45 319
2 3 BHK 83.89 320
2 3 BHK 87.79 321
2 2 BHK 79.99 322
2 3 BHK 85.47 323
2 3 BHK 86.12 324
2 2 BHK 61.32 325
2 2 BHK 62.62 326
2 3 BHK 90.77 327
2 3 BHK 90.77 328
2 3 BHK 92.90 329
2 2 BHK 55.18 330
2 2 BHK 64.01 331
2 2 BHK 60.01 332
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 NA1.Pdf
Fd 2 NA1.Pdf
Fd 3 NA1.Pdf
Fd 4 NA1.Pdf
Fd 5 NA1.Pdf
Fd 6 NA1.Pdf
Fd 7 NA1.Pdf
Fd 8 NA1.Pdf
Fd 9 NA1.Pdf
Fd 10 NA1.Pdf
Fd 11 NA1.Pdf
Fd 12 NA1.Pdf
Fd 13 NA1.Pdf
Fd 14 NA1.Pdf
Fd 15 NA1.Pdf
Fd 16 NA1.Pdf
Fd 17 NA1.Pdf
Fd 18 NA1.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Ed 1 23-03-2023
Ed 2 23-03-2023
Ed 3 23-03-2023
Ed 4 23-03-2023
Ed 5 23-03-2023
Ed 6 23-03-2023
Ed 7 23-03-2023
Ed 8 23-03-2023
Ed 9 23-03-2023
Ed 10 23-03-2023
Ed 11 23-03-2023
Ed 12 23-03-2023
Ed 13 23-03-2023
Ed 14 12-04-2023
Ed 15 12-04-2023
Ed 16 12-04-2023
Ed 17 12-04-2023
Ed 18 12-04-2023
Ed 19 12-04-2023
Ed 20 12-04-2023
Ed 21 12-04-2023
Ed 22 12-05-2023
Ed 23 12-05-2023
Ed 24 12-05-2023
Ed 25 12-05-2023
Ed 26 12-05-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 50200077856299
IFSC HDFC0004094
Branch Address HSR Layout
Country/City