Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Total Environment In That Quiet Earth RERA Details - PRM/KA/RERA/1251/446/PR/060722/005044 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Total Environment In That Quiet Earth under registration PRM/KA/RERA/1251/446/PR/060722/005044 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/060722/005044
  • Project Name In That Quiet Earth Phase 2B
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 01 May 2028
  • Documents 101 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 30 April 2022 Expected commencement of civil works and foundation on site.
Original Completion 01 May 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Total Environment Constructions Private Limited
Registered Address No. 78, Imagine, EPIP Zone,ITPL Main Road, Whitefield ,Bengaluru North ,Bengaluru Urban-560066
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy Nos 68, 69/1, 69/2, 69/2(p), 75/1, 75/2, 75/3, 75/10, Bileshivale Village, Bidarahalli Hobli , Bengaluru East Taluk, Ward No. 54, Mahadevapura Zone , Bengaluru East , Bengaluru Urban, Karnataka - 560077

RERA Coordinates

Latitude, Longitude 13.05385331, 77.67697354
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0031/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 03 March 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 5 2 27 1 216 Residential 86.0 27 108
Tower 6 2 27 1 216 Residential 86.0 27 108
Tower 7 2 27 1 216 Residential 86.0 27 108

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • Tower 5
  • Tower 6
  • Tower 7
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 160.09 5011
GF 3 BHK 160.09 5012
GF 3 BHK 160.09 5013
GF 3 BHK 160.09 5014
1 3 BHK 160.09 5021
1 3 BHK 160.09 5022
1 3 BHK 160.09 5023
1 3 BHK 160.09 5024
2 3 BHK 160.09 5031
2 3 BHK 160.09 5032
2 3 BHK 160.09 5033
2 3 BHK 160.09 5034
3 3 BHK 160.09 5041
3 3 BHK 160.09 5042
3 3 BHK 160.09 5043
3 3 BHK 160.09 5044
4 3 BHK 160.09 5051
4 3 BHK 160.09 5052
4 3 BHK 160.09 5053
4 3 BHK 160.09 5054
5 3 BHK 160.09 5061
5 3 BHK 160.09 5062
5 3 BHK 160.09 5063
5 3 BHK 160.09 5064
6 3 BHK 160.09 5071
6 3 BHK 160.09 5072
6 3 BHK 160.09 5073
6 3 BHK 160.09 5074
7 3 BHK 160.09 5081
7 3 BHK 160.09 5082
7 3 BHK 160.09 5083
7 3 BHK 160.09 5084
8 3 BHK 160.09 5091
8 3 BHK 160.09 5092
8 3 BHK 160.09 5093
8 3 BHK 160.09 5094
9 3 BHK 160.09 5101
9 3 BHK 160.09 5102
9 3 BHK 160.09 5103
9 3 BHK 160.09 5104
10 3 BHK 160.09 5111
10 3 BHK 160.09 5112
10 3 BHK 160.09 5113
10 3 BHK 160.09 5114
11 3 BHK 160.09 5121
11 3 BHK 160.09 5122
11 3 BHK 160.09 5123
11 3 BHK 160.09 5124
12 3 BHK 160.09 5131
12 3 BHK 160.09 5132
12 3 BHK 160.09 5133
12 3 BHK 160.09 5134
13 3 BHK 160.09 5141
13 3 BHK 160.09 5142
13 3 BHK 160.09 5143
13 3 BHK 160.09 5144
14 3 BHK 160.09 5151
14 3 BHK 160.09 5152
14 3 BHK 160.09 5153
14 3 BHK 160.09 5154
15 3 BHK 160.09 5161
15 3 BHK 160.09 5162
15 3 BHK 160.09 5163
15 3 BHK 160.09 5164
16 3 BHK 160.09 5171
16 3 BHK 160.09 5172
16 3 BHK 160.09 5173
16 3 BHK 160.09 5174
17 3 BHK 160.09 5181
17 3 BHK 160.09 5182
17 3 BHK 160.09 5183
17 3 BHK 160.09 5184
18 3 BHK 160.09 5191
18 3 BHK 160.09 5192
18 3 BHK 160.09 5193
18 3 BHK 160.09 5194
19 3 BHK 160.09 5201
19 3 BHK 160.09 5202
19 3 BHK 160.09 5203
19 3 BHK 160.09 5204
20 3 BHK 160.09 5211
20 3 BHK 160.09 5212
20 3 BHK 160.09 5213
20 3 BHK 160.09 5214
21 3 BHK 160.09 5221
21 3 BHK 160.09 5222
21 3 BHK 160.09 5223
21 3 BHK 160.09 5224
22 3 BHK 160.09 5231
22 3 BHK 160.09 5232
22 3 BHK 160.09 5233
22 3 BHK 160.09 5234
23 3 BHK 160.09 5241
23 3 BHK 160.09 5242
23 3 BHK 160.09 5243
23 3 BHK 160.09 5244
24 3 BHK 160.09 5251
24 3 BHK 160.09 5252
24 3 BHK 160.09 5253
24 3 BHK 160.09 5254
25 3 BHK 160.09 5261
25 3 BHK 160.09 5262
25 3 BHK 160.09 5263
25 3 BHK 160.09 5264
26 3 BHK 160.09 5271
26 3 BHK 160.09 5272
26 3 BHK 160.09 5273
26 3 BHK 160.09 5274
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ld Conversion Order
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 BS 2020-21.Pdf
Fd 2 BS 2019-20.Pdf
Fd 3 BS 2018-19.Pdf
Fd 4 PL 2020-21.Pdf
Fd 5 PL 2019-20.Pdf
Fd 6 PL 2018-19.Pdf
Fd 7 Not Available.Pdf
Fd 8 Not Available.Pdf
Fd 9 Not Available.Pdf
Fd 10 CF 2020-21.Pdf
Fd 11 CF 2019-20.Pdf
Fd 12 CF 2018-19.Pdf
Fd 13 Auditors Report 2020-21.Pdf
Fd 14 Uploaded In Other Documents.Pdf
Fd 15 Auditors Report 2018-19.Pdf
Fd 16 Not Available.Pdf
Fd 17 ITR 2019-20.Pdf
Fd 18 ITR 2018-19.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Auditors Report 2019-20.Pdf
Od 2 Guidance Value.Pdf
Od 3 Block 02 RERA Demarcation On Survey Plan.Pdf
Od 4 Block 02 RERA Demarcation On Survey Plan.Pdf
Od 5 CLARIFICATION ABOUT INSTALLATION OF STP IN THE PROJECT.Pdf
Od 6 NOC SEIAA.Pdf
Od 7 Title Deed Sy No 68.Pdf
Od 8 Title Deed 69-1.Pdf
Od 9 Title Document- 01.Pdf
Od 10 Title Deed 75-1.PDF
Od 11 Partition Deed Sy No 75:2.Pdf
Od 12 Release Deed 75-3.Pdf
Od 13 Title Deed 75-3.Pdf
Ed 1 06-05-2022
Ed 2 06-05-2022
Ed 3 06-05-2022
Ed 4 06-05-2022
Ed 5 06-05-2022
Ed 6 06-05-2022
Ed 7 06-05-2022
Ed 8 06-05-2022
Ed 9 06-05-2022
Ed 10 06-05-2022
Ed 11 06-05-2022
Ed 12 06-05-2022
Ed 13 06-05-2022
Ed 14 06-05-2022
Ed 15 06-05-2022
Ed 16 06-05-2022
Ed 17 06-05-2022
Ed 18 06-05-2022
Ed 19 06-05-2022
Ed 20 06-05-2022
Ed 21 06-05-2022
Ed 22 01-07-2022
Ed 23 01-07-2022
Ed 24 01-07-2022
Ed 25 01-07-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Standard Chartered Bank
Account Number (RERA) 8946970777
IFSC SCBL0036073
Branch Address Koramangala Branch
Country/City