residential Under Construction Source: rera.ka

Total Environment In That Quiet Earth RERA Details - PRM/KA/RERA/1251/446/PR/310125/007467 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Total Environment In That Quiet Earth under registration PRM/KA/RERA/1251/446/PR/310125/007467 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/310125/007467
  • Project Name IN THAT QUIET EARTH TOWER 8
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2032
  • Documents 90 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2032 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Total Environment Constructions Private Limited
Registered Address No. 78, Imagine, EPIP Zone,ITPL Main Road, Whitefield ,Bengaluru East ,Bengaluru Urban-560066
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY. NOS. 59/1, 59/5 AND 60/1 OF BILESHIVALE VILLAGE , BIDARAHALLI HOBLI, WARD NO. 54 , MAHADEVAPURA ZONE , Bengaluru East , Bengaluru Urban, Karnataka - 562149

RERA Coordinates

Latitude, Longitude 13.056767, 77.677236
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0086/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 31 October 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 8 2 31 0 240 Residential 92.7 29 120

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • Tower 8
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 238.29 8001
-1 3 BHK 238.29 8002
-1 3 BHK 238.29 8003
-1 3 BHK 238.29 8004
-1 3 BHK 238.29 8005
-1 3 BHK 238.29 8006
-1 3 BHK 238.29 8007
-1 3 BHK 238.29 8008
1 3 BHK 238.29 8021
1 3 BHK 238.29 8022
1 3 BHK 238.29 8023
1 3 BHK 238.29 8024
1 3 BHK 238.29 8025
1 3 BHK 238.29 8026
1 3 BHK 238.29 8027
1 3 BHK 238.29 8028
3 3 BHK 238.29 8041
3 3 BHK 238.29 8042
3 3 BHK 238.29 8043
3 3 BHK 238.29 8044
3 3 BHK 238.29 8045
3 3 BHK 238.29 8046
3 3 BHK 238.29 8047
3 3 BHK 238.29 8048
5 3 BHK 238.29 8061
5 3 BHK 238.29 8062
5 3 BHK 238.29 8063
5 3 BHK 238.29 8064
5 3 BHK 238.29 8065
5 3 BHK 238.29 8066
5 3 BHK 238.29 8067
5 3 BHK 238.29 8068
7 3 BHK 238.29 8081
7 3 BHK 238.29 8082
7 3 BHK 238.29 8083
7 3 BHK 238.29 8084
7 3 BHK 238.29 8085
7 3 BHK 238.29 8086
7 3 BHK 238.29 8087
7 3 BHK 238.29 8088
9 3 BHK 238.29 8101
9 3 BHK 238.29 8102
9 3 BHK 238.29 8103
9 3 BHK 238.29 8104
9 3 BHK 238.29 8105
9 3 BHK 238.29 8106
9 3 BHK 238.29 8107
9 3 BHK 238.29 8108
11 3 BHK 238.29 8121
11 3 BHK 238.29 8122
11 3 BHK 238.29 8123
11 3 BHK 238.29 8124
11 3 BHK 238.29 8125
11 3 BHK 238.29 8126
11 3 BHK 238.29 8127
11 3 BHK 238.29 8128
13 3 BHK 238.29 8141
13 3 BHK 238.29 8142
13 3 BHK 238.29 8143
13 3 BHK 238.29 8144
13 3 BHK 238.29 8145
13 3 BHK 238.29 8146
13 3 BHK 238.29 8147
13 3 BHK 238.29 8148
15 3 BHK 238.29 8161
15 3 BHK 238.29 8162
15 3 BHK 238.29 8163
15 3 BHK 238.29 8164
15 3 BHK 238.29 8165
15 3 BHK 238.29 8166
15 3 BHK 238.29 8167
15 3 BHK 238.29 8168
17 3 BHK 238.29 8181
17 3 BHK 238.29 8182
17 3 BHK 238.29 8183
17 3 BHK 238.29 8184
17 3 BHK 238.29 8185
17 3 BHK 238.29 8186
17 3 BHK 238.29 8187
17 3 BHK 238.29 8188
19 3 BHK 238.29 8201
19 3 BHK 238.29 8202
19 3 BHK 238.29 8203
19 3 BHK 238.29 8204
19 3 BHK 238.29 8205
19 3 BHK 238.29 8206
19 3 BHK 238.29 8207
19 3 BHK 238.29 8208
21 3 BHK 238.29 8221
21 3 BHK 238.29 8222
21 3 BHK 238.29 8223
21 3 BHK 238.29 8224
21 3 BHK 238.29 8225
21 3 BHK 238.29 8226
21 3 BHK 238.29 8227
21 3 BHK 238.29 8228
23 3 BHK 238.29 8241
23 3 BHK 238.29 8242
23 3 BHK 238.29 8243
23 3 BHK 238.29 8244
23 3 BHK 238.29 8245
23 3 BHK 238.29 8246
23 3 BHK 238.29 8247
23 3 BHK 238.29 8248
25 3 BHK 238.29 8261
25 3 BHK 238.29 8262
25 3 BHK 238.29 8263
25 3 BHK 238.29 8264
25 3 BHK 238.29 8265
25 3 BHK 238.29 8266
25 3 BHK 238.29 8267
25 3 BHK 238.29 8268
27 3 BHK 238.29 8281
27 3 BHK 238.29 8282
27 3 BHK 238.29 8283
27 3 BHK 238.29 8284
27 3 BHK 238.29 8285
27 3 BHK 238.29 8286
27 3 BHK 238.29 8287
27 3 BHK 238.29 8288
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 TEC Final Accounts 31-03-2024 Signed.Pdf
Fd 2 TEC Final Accounts 31-03-2023 Signed.Pdf
Fd 3 TEC Final Accounts 31-03-2022 Signed.Pdf
Fd 4 TEC Final Accounts 31-03-2024 Signed.Pdf
Fd 5 TEC Final Accounts 31-03-2023 Signed.Pdf
Fd 6 TEC Final Accounts 31-03-2022 Signed.Pdf
Fd 7 TEC Final Accounts 31-03-2024 Signed.Pdf
Fd 8 TEC Final Accounts 31-03-2023 Signed.Pdf
Fd 9 TEC Final Accounts 31-03-2022 Signed.Pdf
Fd 10 TEC Final Accounts 31-03-2024 Signed.Pdf
Fd 11 TEC Final Accounts 31-03-2023 Signed.Pdf
Fd 12 TEC Final Accounts 31-03-2022 Signed.Pdf
Fd 13 TEC Final Accounts 31-03-2024 Signed.Pdf
Fd 14 TEC Final Accounts 31-03-2023 Signed.Pdf
Fd 15 TEC Final Accounts 31-03-2022 Signed.Pdf
Fd 16 TECS ITR Acknowledgement AY 2024-25.Pdf
Fd 17 TECS ITR Acknowledgement AY 2023-24.Pdf
Fd 18 TECS ITR Acknowledgement AY 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 ItQE Sensitive Clearance 19 7 2022.Pdf
Od 2 ItQE Sensitive Clearance For 62 1 And 62 2 2024.Pdf
Od 3 ItQE Sensitive Clearance For 64 , 61 1 , 62 3 And 71 2024.Pdf
Od 4 ItQE Sensitive Clereance 06 09 2015.Pdf
Od 5 ItQE Tower 8 Demarcation Google Maps.Pdf
Od 6 ItQE Tower 8 Demarcation Village Map.Pdf
Od 7 ItQE Tower 8 CDP Demarcation.Pdf
Od 8 ITQE Tower 8 Each Unit Details.PDF
Od 9 ItQE Tower 8 RERA Demarcation BP.Pdf
Od 10 ItQE Tower 8 RERA Demarcation DP Plan STP & Land.Pdf
Od 11 ItQE Tower 8 RERA Plan Demarcation.Pdf
Od 12 ItQE-59 1-Partition Deed-B C Kempaiah To Kanakamma.Pdf
Od 13 Sy No 59 1 Inheritance-Hucchahanumantappa To B C Kempaiah.Pdf
Od 14 Akarband 54 2,7,4,8 & 59 1,5.Pdf
Od 15 ItQE S 59 B-1 Hissa.Pdf
Od 16 ItQE S 59 1 And 5 Atlas.Pdf
Od 17 Moola Tippan Atlas 59.Pdf
Od 18 ITQE-59-1-GPA-457.PDF
Od 19 ItQE-Sy No 59-5 Inheritance-Sanjivappa To Jayamma.Pdf
Od 20 Akarband.Pdf
Od 21 Moola Tippan Atlas 59.Pdf
Od 22 ItQE Akarbandh.Pdf
Od 23 Sy No 60 1 Gift Deed-Chikkakenchmma To Kanakamma.Pdf
Od 24 Sy No 60 1 Inheritance-Hucchahanumantappa To Chikkakenchamma.Pdf
Od 25 Moola Tippani 60.Pdf
Od 26 ItQE Akarbandh.Pdf
Od 27 ItQE S 60 Hissa Tippani.Pdf
Od 28 ItQE S 60 Atlas.Pdf
Od 29 ITQE Khatha Certificate And Amalgamation Deed.Pdf
Od 30 ITQE BDA Work Order.Pdf
Od 31 ITQE Ph2 BDA Approved DP Plan.Pdf
Od 32 ITQE HAL NOC.Pdf
Ed 1 24-01-2025
Ed 2 24-01-2025
Ed 3 24-01-2025
Ed 4 24-01-2025
Ed 5 24-01-2025
Ed 6 24-01-2025
Ed 7 24-01-2025
Ed 8 24-01-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705212314
IFSC ICIC0000551
Branch Address Concourse, ITPL, Bangalore
Country/City