Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Trifecta Veranza RERA Details - PRM/KA/RERA/1251/308/PR/210126/008418 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Trifecta Veranza under registration PRM/KA/RERA/1251/308/PR/210126/008418 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/210126/008418
  • Project Name Trifecta Veranza
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2029
  • Documents 88 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 03 January 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

TRIFECTA PROJECTS PRIVATE LIMITED
Registered Address Trifecta Projects Pvt. Ltd Trifecta Adatto, 13th Floor, Site No. 66/2. 67/1.,,Whitefield Main Road, Garudacharpalya, Mahadevpura Post., ,Anekal ,Bengaluru Urban-560048
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 96, Sy No 97/3, Khata Number 150200100101122194, Yamare Village, , Sarjapura Hobli, Anekal Taluk, Bengaluru District , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.863284, 77.751637
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. Anekal Planning Authority/CC/971/2025-26
Authority Anekal Planning Authority
Approved Date 03 January 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 1 38 1 222 Residential 120.0 36 222
B 1 38 1 222 Residential 120.0 36 222

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • A
  • B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 100.59 001
-1 3 BHK 81.003 002
-1 3 BHK 86.867 003
-1 3 BHK 86.867 004
-1 2 BHK 68.572 005
-1 3 BHK 100.59 006
GF 3 BHK 100.59 101
GF 3 BHK 81.003 102
GF 3 BHK 86.867 103
GF 3 BHK 86.867 104
GF 2 BHK 68.572 105
GF 3 BHK 100.59 106
1 3 BHK 100.59 201
1 3 BHK 81.003 202
1 3 BHK 86.867 203
1 3 BHK 86.867 204
1 2 BHK 68.572 205
1 3 BHK 100.59 206
2 3 BHK 100.59 301
2 3 BHK 81.003 302
2 3 BHK 86.867 303
2 3 BHK 86.867 304
2 2 BHK 68.572 305
2 3 BHK 100.59 306
3 3 BHK 100.59 401
3 3 BHK 81.003 402
3 3 BHK 86.867 403
3 3 BHK 86.867 404
3 2 BHK 68.572 405
3 3 BHK 100.59 406
4 3 BHK 100.59 501
4 3 BHK 81.003 502
4 3 BHK 86.867 503
4 3 BHK 86.867 504
4 2 BHK 68.572 505
4 3 BHK 100.59 506
5 3 BHK 100.59 601
5 3 BHK 81.003 602
5 3 BHK 86.867 603
5 3 BHK 86.867 604
5 2 BHK 68.572 605
5 3 BHK 100.59 606
6 3 BHK 100.59 701
6 3 BHK 81.003 702
6 3 BHK 86.867 703
6 3 BHK 86.867 704
6 2 BHK 68.572 705
6 3 BHK 100.59 706
7 3 BHK 100.59 801
7 3 BHK 81.003 802
7 3 BHK 86.867 803
7 3 BHK 86.867 804
7 2 BHK 68.572 805
7 3 BHK 100.59 806
8 3 BHK 100.59 901
8 3 BHK 81.003 902
8 3 BHK 86.867 903
8 3 BHK 86.867 904
8 2 BHK 68.572 905
8 3 BHK 100.59 906
9 3 BHK 100.59 1001
9 3 BHK 81.003 1002
9 3 BHK 86.867 1003
9 3 BHK 86.867 1004
9 2 BHK 68.572 1005
9 3 BHK 100.59 1006
10 3 BHK 100.59 1101
10 3 BHK 81.003 1102
10 3 BHK 86.867 1103
10 3 BHK 86.867 1104
10 2 BHK 68.572 1105
10 3 BHK 100.59 1106
11 3 BHK 100.59 1201
11 3 BHK 81.003 1202
11 3 BHK 86.867 1203
11 3 BHK 86.867 1204
11 2 BHK 68.572 1205
11 3 BHK 100.59 1206
12 3 BHK 100.59 1301
12 3 BHK 81.003 1302
12 3 BHK 86.867 1303
12 3 BHK 86.867 1304
12 2 BHK 68.572 1305
12 3 BHK 100.59 1306
13 3 BHK 100.59 1401
13 3 BHK 81.003 1402
13 3 BHK 86.867 1403
13 3 BHK 86.867 1404
13 2 BHK 68.572 1405
13 3 BHK 100.59 1406
14 3 BHK 100.59 1501
14 3 BHK 81.003 1502
14 3 BHK 86.867 1503
14 3 BHK 86.867 1504
14 2 BHK 68.572 1505
14 3 BHK 100.59 1506
15 3 BHK 100.59 1601
15 3 BHK 81.003 1602
15 3 BHK 86.867 1603
15 3 BHK 86.867 1604
15 2 BHK 68.572 1605
15 3 BHK 100.59 1606
16 3 BHK 100.59 1701
16 3 BHK 81.003 1702
16 3 BHK 86.867 1703
16 3 BHK 86.867 1704
16 2 BHK 68.572 1705
16 3 BHK 100.59 1706
17 3 BHK 100.59 1801
17 3 BHK 81.003 1802
17 3 BHK 86.867 1803
17 3 BHK 86.867 1804
17 2 BHK 68.572 1805
17 3 BHK 100.59 1806
18 3 BHK 100.59 1901
18 3 BHK 81.003 1902
18 3 BHK 86.867 1903
18 3 BHK 86.867 1904
18 2 BHK 68.572 1905
18 3 BHK 100.59 1906
19 3 BHK 100.59 2001
19 3 BHK 81.003 2002
19 3 BHK 86.867 2003
19 3 BHK 86.867 2004
19 2 BHK 68.572 2005
19 3 BHK 100.59 2006
20 3 BHK 100.59 2101
20 3 BHK 81.003 2102
20 3 BHK 86.867 2103
20 3 BHK 86.867 2104
20 2 BHK 68.572 2105
20 3 BHK 100.59 2106
21 3 BHK 100.59 2201
21 3 BHK 81.003 2202
21 3 BHK 86.867 2203
21 3 BHK 86.867 2204
21 2 BHK 68.572 2205
21 3 BHK 100.59 2206
22 3 BHK 100.59 2301
22 3 BHK 81.003 2302
22 3 BHK 86.867 2303
22 3 BHK 86.867 2304
22 2 BHK 68.572 2305
22 3 BHK 100.59 2306
23 3 BHK 100.59 2401
23 3 BHK 81.003 2402
23 3 BHK 86.867 2403
23 3 BHK 86.867 2404
23 2 BHK 68.572 2405
23 3 BHK 100.59 2406
24 3 BHK 100.59 2501
24 3 BHK 81.003 2502
24 3 BHK 86.867 2503
24 3 BHK 86.867 2504
24 2 BHK 68.572 2505
24 3 BHK 100.59 2506
25 3 BHK 100.59 2601
25 3 BHK 81.003 2602
25 3 BHK 86.867 2603
25 3 BHK 86.867 2604
25 2 BHK 68.572 2605
25 3 BHK 100.59 2606
26 3 BHK 100.59 2701
26 3 BHK 81.003 2702
26 3 BHK 86.867 2703
26 3 BHK 86.867 2704
26 2 BHK 68.572 2705
26 3 BHK 100.59 2706
27 3 BHK 100.59 2801
27 3 BHK 81.003 2802
27 3 BHK 86.867 2803
27 3 BHK 86.867 2804
27 2 BHK 68.572 2805
27 3 BHK 100.59 2806
28 3 BHK 100.59 2901
28 3 BHK 81.003 2902
28 3 BHK 86.867 2903
28 3 BHK 86.867 2904
28 2 BHK 68.572 2905
28 3 BHK 100.59 2906
29 3 BHK 100.59 3001
29 3 BHK 81.003 3002
29 3 BHK 86.867 3003
29 3 BHK 86.867 3004
29 2 BHK 68.572 3005
29 3 BHK 100.59 3006
30 3 BHK 100.59 3101
30 3 BHK 81.003 3102
30 3 BHK 86.867 3103
30 3 BHK 86.867 3104
30 2 BHK 68.572 3105
30 3 BHK 100.59 3106
31 3 BHK 100.59 3201
31 3 BHK 81.003 3202
31 3 BHK 86.867 3203
31 3 BHK 86.867 3204
31 2 BHK 68.572 3205
31 3 BHK 100.59 3206
32 3 BHK 100.59 3301
32 3 BHK 81.003 3302
32 3 BHK 86.867 3303
32 3 BHK 86.867 3304
32 2 BHK 68.572 3305
32 3 BHK 100.59 3306
33 3 BHK 100.59 3401
33 3 BHK 81.003 3402
33 3 BHK 86.867 3403
33 3 BHK 86.867 3404
33 2 BHK 68.572 3405
33 3 BHK 100.59 3406
34 3 BHK 100.59 3501
34 3 BHK 81.003 3502
34 3 BHK 86.867 3503
34 3 BHK 86.867 3504
34 2 BHK 68.572 3505
34 3 BHK 100.59 3506
35 3 BHK 100.59 3601
35 3 BHK 81.003 3602
35 3 BHK 86.867 3603
35 3 BHK 86.867 3604
35 2 BHK 68.572 3605
35 3 BHK 100.59 3606
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS FY 24-25.Pdf
Fd 2 BS FY 23-24.Pdf
Fd 3 BS FY 22-23.Pdf
Fd 4 PnL FY 24-25.Pdf
Fd 5 PnL FY 23-24.Pdf
Fd 6 PnL FY 22-23.Pdf
Fd 7 ITR Ack FY 24-25.Pdf
Fd 8 ITR Ack FY 23-24.Pdf
Fd 9 ITR Ack FY 22-23.Pdf
Fd 10 DR FY 24-25.Pdf
Fd 11 DR FY 23-24.Pdf
Fd 12 DR FY 22-23.Pdf
Fd 13 CFS FY 24-25.Pdf
Fd 14 CFS FY 23-24.Pdf
Fd 15 CFS FY 22-23.Pdf
Fd 16 AR FY 24-25.Pdf
Fd 17 AR FY 23-24.Pdf
Fd 18 AR FY 22-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Project Photo 1.Jpeg
Od 2 Project Photo 2.Jpeg
Od 3 Project Photo 4.Jpeg
Od 4 Project Photo 5.Jpeg
Od 5 NOC Hal.Pdf
Od 6 Relinquishment Deed Of Road.Pdf
Od 7 Plan A Site Plan Trifecta Veranza.Pdf
Od 8 Plan B Basement Floor Trifecta Veranza.Pdf
Od 9 Plan C Ground Floor Trifecta Veranza.Pdf
Od 10 Plan D 1st Floor Trifecta Veranza.Pdf
Od 11 Plan E 2nd Floor Trifecta Veranza.Pdf
Od 12 Plan F Typical Floor Plan 3rd To 18th, 20th To 28th And 30th To 36th.Pdf
Od 13 Plan G 19th And 29th Floor Trifecta Veranza.Pdf
Od 14 Plan H Terrace Floor Trifecta Veranza.Pdf
Od 15 Plan I Elevation Tower A & B Section AA & South Side Trifecta Veranza.Pdf
Od 16 Plan J Approval Letter.Pdf
Od 17 Title GPA.Pdf
Od 18 Title JDA.Pdf
Od 19 Title Mother Deed Partition Deed No 510(07-08) SY NO 96 And 97.Pdf
Od 20 CDP.Pdf
Od 21 Village Map.Pdf
Od 22 Land Cost & Guidance Value.Pdf
Od 23 NOC KTCP.Pdf
Ed 1 17-01-2026
Ed 2 17-01-2026
Ed 3 17-01-2026
Ed 4 17-01-2026
Ed 5 17-01-2026
Ed 6 17-01-2026
Ed 7 17-01-2026
Ed 8 17-01-2026
Ed 9 17-01-2026
Ed 10 17-01-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44636301952
IFSC SBIN0003028
Branch Address Mahadevapura SME
Country/City