Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Trifecta Vanto RERA Details - PRM/KA/RERA/1251/310/PR/250625/007871 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Trifecta Vanto under registration PRM/KA/RERA/1251/310/PR/250625/007871 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/250625/007871
  • Project Name TRIFECTA VANTO PHASE-2
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 March 2028
  • Documents 153 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

TRIFECTA PROJECTS PRIVATE LIMITED
Registered Address SY.66/2,67/1, OPP BESCOM OFFICE, WHITE FIEL MAIN ROAD, GARUDHACHARPALYA,,MAHADEVAPURA, Bengaluru North, Bengaluru Urban, ,Bengaluru North ,Bengaluru ,Bengaluru North ,Bengaluru Urban-560048
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy. No. 37/1, 37/2, 37/3, 37/4, 37/5, 37/6, 37/7, 37/8, 37/9, 37/10, 37/11, 37/12, 37/13, 37/14, 37/15, 37/16, 37/17, 37/18, 37/19, 37/20, 43/5 & 43/4 , 4B, Kodathi VillageVarthur Hobli, Bengaluru East Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.875678405880414, 77.70722415063294
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/EM/EO-1/TA-2/E/69/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 01 April 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower C 1 25 1 202 Residential 77.0 24 202

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
3 BHK 0 units
  • Tower C
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 106 F-034
-1 3 BHK 111 F-035
-1 1 BHK 57 F-036A
-1 1 BHK 46 F-036B
-1 3 BHK 96 F-037
-1 3 BHK 96 F-038
-1 1 BHK 57 F-039A
-1 1 BHK 46 F-039B
-1 3 BHK 111 F-040
-1 3 BHK 103 F-041
GF 3 BHK 106 F-134
GF 3 BHK 111 F-135
GF 3 BHK 99 F-136
GF 3 BHK 96 F-137
GF 3 BHK 96 F-138
GF 3 BHK 99 F-139
GF 3 BHK 111 F-140
GF 3 BHK 102 F-141
1 3 BHK 106 F-234
1 3 BHK 111 F-235
1 3 BHK 99 F-236
1 3 BHK 96 F-237
1 3 BHK 96 F-238
1 3 BHK 99 F-239
1 3 BHK 111 F-240
1 3 BHK 103 F-241
2 3 BHK 106 F-334
2 3 BHK 111 F-335
2 3 BHK 99 F-336
2 3 BHK 96 F-337
2 3 BHK 96 F-338
2 3 BHK 99 F-339
2 3 BHK 111 F-340
2 3 BHK 103 F-341
3 3 BHK 106 F-434
3 3 BHK 111 F-435
3 3 BHK 99 F-436
3 3 BHK 96 F-437
3 3 BHK 96 F-438
3 3 BHK 99 F-439
3 3 BHK 111 F-440
3 3 BHK 103 F-441
4 3 BHK 106 F-534
4 3 BHK 111 F-535
4 3 BHK 99 F-536
4 3 BHK 96 F-537
4 3 BHK 96 F-538
4 3 BHK 99 F-539
4 3 BHK 111 F-540
4 3 BHK 103 F-541
5 3 BHK 106 F-634
5 3 BHK 111 F-635
5 3 BHK 99 F-636
5 3 BHK 96 F-637
5 3 BHK 96 F-638
5 3 BHK 99 F-639
5 3 BHK 111 F-640
5 3 BHK 103 F-641
6 3 BHK 106 F-734
6 3 BHK 111 F-735
6 3 BHK 99 F-736
6 3 BHK 96 F-737
6 3 BHK 96 F-738
6 3 BHK 99 F-739
6 3 BHK 111 F-740
6 3 BHK 103 F-741
7 3 BHK 106 F-834
7 3 BHK 111 F-835
7 3 BHK 99 F-836
7 3 BHK 96 F-837
7 3 BHK 96 F-838
7 3 BHK 99 F-839
7 3 BHK 111 F-840
7 3 BHK 103 F-841
8 3 BHK 106 F-934
8 3 BHK 111 F-935
8 3 BHK 99 F-936
8 3 BHK 96 F-937
8 3 BHK 96 F-938
8 3 BHK 99 F-939
8 3 BHK 111 F-940
8 3 BHK 103 F-941
9 3 BHK 106 F-1034
9 3 BHK 111 F-1035
9 3 BHK 99 F-1036
9 3 BHK 96 F-1037
9 3 BHK 96 F-1038
9 3 BHK 99 F-1039
9 3 BHK 111 F-1040
9 3 BHK 103 F-1041
10 3 BHK 106 F-1134
10 3 BHK 111 F-1135
10 3 BHK 99 F-1136
10 3 BHK 96 F-1137
10 3 BHK 96 F-1138
10 3 BHK 99 F-1139
10 3 BHK 111 F-1140
10 3 BHK 103 F-1141
11 3 BHK 106 F-1234
11 3 BHK 111 F-1235
11 3 BHK 99 F-1236
11 3 BHK 96 F-1237
11 3 BHK 96 F-1238
11 3 BHK 99 F-1239
11 3 BHK 111 F-1240
11 3 BHK 103 F-1241
12 3 BHK 106 F-1334
12 3 BHK 111 F-1335
12 3 BHK 99 F-1336
12 3 BHK 97 F-1337
12 3 BHK 96 F-1338
12 3 BHK 99 F-1339
12 3 BHK 111 F-1340
12 3 BHK 102 F-1341
13 3 BHK 106 F-1434
13 3 BHK 111 F-1435
13 3 BHK 99 F-1436
13 3 BHK 96 F-1437
13 3 BHK 96 F-1438
13 3 BHK 99 F-1439
13 3 BHK 111 F-1440
13 3 BHK 103 F-1441
14 3 BHK 106 F-1534
14 3 BHK 111 F-1535
14 3 BHK 99 F-1536
14 3 BHK 96 F-1537
14 3 BHK 96 F-1538
14 3 BHK 99 F-1539
14 3 BHK 111 F-1540
14 3 BHK 103 F-1541
15 3 BHK 106 F-1634
15 3 BHK 111 F-1635
15 3 BHK 99 F-1636
15 3 BHK 96 F-1637
15 3 BHK 96 F-1638
15 3 BHK 99 F-1639
15 3 BHK 111 F-1640
15 3 BHK 102 F-1641
16 3 BHK 106 F-1734
16 3 BHK 111 F-1735
16 3 BHK 99 F-1736
16 3 BHK 96 F-1737
16 3 BHK 96 F-1738
16 3 BHK 99 F-1739
16 3 BHK 111 F-1740
16 3 BHK 103 F-1741
17 3 BHK 106 F-1834
17 3 BHK 111 F-1835
17 3 BHK 99 F-1836
17 3 BHK 96 F-1837
17 3 BHK 96 F-1838
17 3 BHK 99 F-1839
17 3 BHK 111 F-1840
17 3 BHK 103 F-1841
18 3 BHK 106 F-1934
18 3 BHK 111 F-1935
18 3 BHK 99 F-1936
18 3 BHK 96 F-1937
18 3 BHK 96 F-1938
18 3 BHK 99 F-1939
18 3 BHK 111 F-1940
18 3 BHK 102 F-1941
19 3 BHK 106 F-2034
19 3 BHK 111 F-2035
19 3 BHK 99 F-2036
19 3 BHK 96 F-2037
19 3 BHK 96 F-2038
19 3 BHK 99 F-2039
19 3 BHK 111 F-2040
19 3 BHK 103 F-2041
20 3 BHK 106 F-2134
20 3 BHK 111 F-2135
20 3 BHK 99 F-2136
20 3 BHK 96 F-2137
20 3 BHK 96 F-2138
20 3 BHK 99 F-2139
20 3 BHK 111 F-2140
20 3 BHK 103 F-2141
21 3 BHK 106 F-2234
21 3 BHK 111 F-2235
21 3 BHK 99 F-2236
21 3 BHK 96 F-2237
21 3 BHK 96 F-2238
21 3 BHK 99 F-2239
21 3 BHK 111 F-2240
21 3 BHK 103 F-2241
22 3 BHK 106 F-2334
22 3 BHK 111 F-2335
22 3 BHK 99 F-2336
22 3 BHK 96 F-2337
22 3 BHK 96 F-2338
22 3 BHK 99 F-2339
22 3 BHK 111 F-2340
22 3 BHK 103 F-2341
23 3 BHK 106 F-2434
23 3 BHK 111 F-2435
23 3 BHK 99 F-2436
23 3 BHK 96 F-2437
23 3 BHK 96 F-2438
23 3 BHK 99 F-2439
23 3 BHK 111 F-2440
23 3 BHK 103 F-2441
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 TRIFECTA Balance Sheet-2023.Pdf
Fd 2 TRIFECTA Balance Sheet-2022.Pdf
Fd 3 TRIFECTA Balance Sheet-2021.Pdf
Fd 4 TRIFECTA P-L-2023.Pdf
Fd 5 TRIFECTA P L -2022.Pdf
Fd 6 TRIFECTA P L -2021.Pdf
Fd 7 ITR 2022-23.Pdf
Fd 8 ITR V 21-22.Pdf
Fd 9 ITR 2020-21.Pdf
Fd 10 FY 22-23.Pdf
Fd 11 Directors Report 2022.Pdf
Fd 12 Direct Report 2021 Compressed.Pdf
Fd 13 TRIFECTA CF 2022-23.Pdf
Fd 14 TRIFECTA CF 2021-22.Pdf
Fd 15 TRIFECTA CF 2020-21.Pdf
Fd 16 AR 22-23 Compressed.Pdf
Fd 17 Audit Report 21-22 Compressed.Pdf
Fd 18 Audit Report 2021 Compressed.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Ed 51 29-05-2025
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Ed 1 29-05-2025
Ed 2 29-05-2025
Ed 3 29-05-2025
Ed 4 29-05-2025
Ed 5 29-05-2025
Ed 6 29-05-2025
Ed 7 29-05-2025
Ed 8 29-05-2025
Ed 9 29-05-2025
Ed 10 29-05-2025
Ed 11 29-05-2025
Ed 12 29-05-2025
Ed 13 29-05-2025
Ed 14 29-05-2025
Ed 15 29-05-2025
Ed 16 29-05-2025
Ed 17 29-05-2025
Ed 18 29-05-2025
Ed 19 29-05-2025
Ed 20 29-05-2025
Ed 21 29-05-2025
Ed 22 29-05-2025
Ed 23 29-05-2025
Ed 24 29-05-2025
Ed 25 29-05-2025
Ed 26 29-05-2025
Ed 27 29-05-2025
Ed 28 29-05-2025
Ed 29 29-05-2025
Ed 30 29-05-2025
Ed 31 29-05-2025
Ed 32 29-05-2025
Ed 33 29-05-2025
Ed 34 29-05-2025
Ed 35 29-05-2025
Ed 36 29-05-2025
Ed 37 29-05-2025
Ed 38 29-05-2025
Ed 39 29-05-2025
Ed 40 29-05-2025
Ed 41 29-05-2025
Ed 42 29-05-2025
Ed 43 29-05-2025
Ed 44 29-05-2025
Ed 45 29-05-2025
Ed 46 29-05-2025
Ed 47 29-05-2025
Ed 48 29-05-2025
Ed 49 29-05-2025
Ed 50 29-05-2025
Ed 52 29-05-2025
Ed 53 29-05-2025
Ed 54 29-05-2025
Ed 55 29-05-2025
Ed 56 29-05-2025
Ed 57 29-05-2025
Ed 58 29-05-2025
Ed 59 29-05-2025
Ed 60 29-05-2025
Ed 61 29-05-2025
Ed 62 29-05-2025
Ed 63 29-05-2025
Ed 64 29-05-2025
Ed 65 29-05-2025
Ed 66 29-05-2025
Ed 67 16-06-2025
Ed 68 16-06-2025
Ed 69 16-06-2025
Ed 70 16-06-2025
Ed 71 16-06-2025
Ed 72 16-06-2025
Ed 73 16-06-2025
Ed 74 16-06-2025
Ed 75 16-06-2025
Ed 76 16-06-2025
Ed 77 16-06-2025
Ed 78 16-06-2025
Ed 79 16-06-2025
Ed 80 16-06-2025
Ed 81 16-06-2025
Ed 82 16-06-2025
Ed 83 16-06-2025
Ed 84 16-06-2025
Ed 85 16-06-2025
Ed 86 16-06-2025
Ed 87 16-06-2025
Ed 88 16-06-2025
Ed 89 16-06-2025
Ed 90 18-06-2025
Ed 91 18-06-2025
Ed 92 18-06-2025
Ed 93 18-06-2025
Ed 94 18-06-2025
Ed 95 18-06-2025
Ed 96 18-06-2025
Ed 97 18-06-2025
Ed 98 18-06-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001761043
IFSC HDFC0001045
Branch Address Mahadevapura Branch
Country/City