Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

PSR Platinum RERA Details - PRM/KA/RERA/1251/446/PR/260226/008488 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for PSR Platinum under registration PRM/KA/RERA/1251/446/PR/260226/008488 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/260226/008488
  • Project Name PSR PLATINUM
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2029
  • Documents 67 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 December 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/s PSR BUILDERS AND DEVELOPERS
Registered Address 3rd Floor, No. 32/1, PSR Marvel,Bellary Road,Hebbal ,Bengaluru North ,Bengaluru Urban-560024
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address @ Sy no 170/2, Kodati Village , Varthur Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.887993, 77.709935
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 33/2025-26
Authority BDA - Bangalore Development Authority
Approved Date 25 August 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 1 1 15 0 137 Residential 44.8 14 117

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Tower 1
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 82.4 101
GF 3 BHK 82.4 102
GF 3 BHK 93.74 107
GF 3 BHK 90.49 108
GF 2 BHK 70.98 109
1 3 BHK 82.4 201
1 3 BHK 82.4 202
1 3 BHK 82.4 203
1 3 BHK 90.58 204
1 3 BHK 90.58 205
1 2 BHK 72.84 206
1 3 BHK 93.74 207
1 3 BHK 90.49 208
1 2 BHK 70.98 209
2 3 BHK 82.4 301
2 3 BHK 82.4 302
2 3 BHK 82.4 303
2 3 BHK 90.58 304
2 3 BHK 90.58 305
2 2 BHK 72.84 306
2 3 BHK 93.74 307
2 3 BHK 90.49 308
2 2 BHK 70.98 309
3 3 BHK 82.4 401
3 3 BHK 82.4 402
3 3 BHK 82.4 403
3 3 BHK 90.58 404
3 3 BHK 90.58 405
3 2 BHK 72.84 406
3 3 BHK 93.74 407
3 3 BHK 90.49 408
3 2 BHK 70.98 409
4 3 BHK 82.4 501
4 3 BHK 82.4 502
4 3 BHK 82.4 503
4 3 BHK 90.58 504
4 3 BHK 90.58 505
4 2 BHK 72.84 506
4 3 BHK 93.74 507
4 3 BHK 90.49 508
4 2 BHK 70.98 509
5 3 BHK 82.4 601
5 3 BHK 82.4 602
5 3 BHK 82.4 603
5 3 BHK 90.58 604
5 3 BHK 90.58 605
5 2 BHK 72.84 606
5 3 BHK 93.74 607
5 3 BHK 90.49 608
5 2 BHK 70.98 609
6 3 BHK 82.4 701
6 3 BHK 82.4 702
6 3 BHK 82.4 703
6 3 BHK 90.58 704
6 3 BHK 90.58 705
6 2 BHK 72.84 706
6 3 BHK 93.74 707
6 3 BHK 90.49 708
6 2 BHK 70.98 709
7 3 BHK 82.4 801
7 3 BHK 82.4 802
7 3 BHK 82.4 803
7 3 BHK 90.58 804
7 3 BHK 90.58 805
7 2 BHK 72.84 806
7 3 BHK 93.74 807
7 3 BHK 90.49 808
7 2 BHK 70.98 809
8 3 BHK 82.4 901
8 3 BHK 82.4 902
8 3 BHK 82.4 903
8 3 BHK 90.58 904
8 3 BHK 90.58 905
8 2 BHK 72.84 906
8 3 BHK 93.74 907
8 3 BHK 90.49 908
8 2 BHK 70.98 909
9 3 BHK 82.4 1001
9 3 BHK 82.4 1002
9 3 BHK 82.4 1003
9 3 BHK 90.58 1004
9 3 BHK 90.58 1005
9 2 BHK 72.84 1006
9 3 BHK 93.74 1007
9 3 BHK 90.49 1008
9 2 BHK 70.98 1009
10 3 BHK 82.4 1101
10 3 BHK 82.4 1102
10 3 BHK 82.4 1103
10 3 BHK 90.58 1104
10 3 BHK 90.58 1105
10 2 BHK 72.84 1106
10 3 BHK 93.74 1107
10 3 BHK 90.49 1108
10 2 BHK 70.98 1109
11 3 BHK 82.4 1201
11 3 BHK 82.4 1202
11 3 BHK 82.4 1203
11 3 BHK 90.58 1204
11 3 BHK 90.58 1205
11 2 BHK 72.84 1206
11 3 BHK 93.74 1207
11 3 BHK 90.49 1208
11 2 BHK 70.98 1209
12 3 BHK 82.4 1301
12 3 BHK 82.4 1302
12 3 BHK 82.4 1303
12 3 BHK 90.58 1304
12 3 BHK 90.58 1305
12 2 BHK 72.84 1306
12 3 BHK 93.74 1307
12 3 BHK 90.49 1308
12 2 BHK 70.98 1309
13 3 BHK 82.4 1403
13 3 BHK 90.58 1404
13 3 BHK 90.58 1405
13 2 BHK 72.84 1406
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 PSR IT RETURNS FY 2024-25.Pdf
Fd 2 PSR IT RETURNS FY 2023-24.Pdf
Fd 3 PSR IT RETURNS FY 2022-23.Pdf
Fd 4 PSR IT RETURNS FY 2024-25.Pdf
Fd 5 PSR IT RETURNS FY 2023-24.Pdf
Fd 6 PSR IT RETURNS FY 2022-23.Pdf
Fd 7 PSR IT RETURNS FY 2024-25.Pdf
Fd 8 PSR IT RETURNS FY 2023-24.Pdf
Fd 9 PSR IT RETURNS FY 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Od 1 Basement Floor Plan.Pdf
Od 2 Elevation.Pdf
Od 3 First Floor Plan.Pdf
Od 4 Ground Floor Plan.Pdf
Od 5 Site Plan.Pdf
Od 6 ADLR SKETCH.Pdf
Od 7 Affidavit With Conversion.Pdf
Od 8 GPA 170-2.Pdf
Od 9 SALE DEED.Pdf
Od 10 Change Of Land Use.Pdf
Od 11 DEMARCATIONS CDP.Pdf
Od 12 PSR- AREA STATEMENT.Pdf
Od 13 PSR PLATINUM CONSTRUCTION ESTIMATION.Pdf
Od 14 PSR-COMMON AREA&AMENITIES DETAILS.Pdf
Od 15 SINGLE SITE WORK ORDER.Pdf
Od 16 VILLAGE MAP AND SY NO IN CDP DEMARCATION.Pdf
Od 17 PSR PLATINUM-STP DESIGN.Pdf
Od 18 PSR PLATINUM LAND COST CALCULATION SHEET.Pdf
Od 19 CLARIFICATION ON SALES.Pdf
Od 20 SINGLE SITE PLAN.Pdf
Od 21 PSR-COMMON AREA&AMENITIES DETAILS.Pdf
Od 22 Phodi MR 170-2.Pdf
Ed 1 23-02-2026
Ed 2 23-02-2026
Ed 3 23-02-2026
Ed 4 23-02-2026
Ed 5 23-02-2026
Ed 6 23-02-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Canara Bank
Account Number (RERA) 2673214000029
IFSC CNRB0000425
Branch Address Hebbal
Country/City