residential Ready to Move Source: rera.mh

Sunteck Avenue 2 RERA Details - P51800034112, Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sunteck Avenue 2 under registration P51800034112 in Mumbai, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51800034112
  • Project Name Sunteck City Avenue 1- Phase 2
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Mumbai Suburban
  • Taluka Borivali
  • Village Borivali
  • Original Completion 31 December 2023
  • Project Area (in Sq.mt.) 8,183
  • Total Buildings/Towers 3
  • Documents 45 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 24 March 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2023 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individual Name Sunteck Realty Limited
Website www.sunteckindia.com
Other Description NA

Promoters, Co-promoters & Members

NameRole
Ajeet Vijay SinghAuthorized Signatory
Prashant Shyamra Raj ChaubeyAuthorized Signatory
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Survey Number 112A

Boundary Details

Boundaries East R2 Building Boundaries West 13 point 40 Mt wide DP Road
Boundaries South Singh Industrial Estate Boundaries North Ram Mandir Road

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
Sunteck City Avenue 1- Phase 2 Wing A 2023-12-31 0 1 3 9 1 0 48
Sunteck City Avenue 1- Phase 2 Wing B 2023-12-31 0 1 3 6 1 0 37
Sunteck City Avenue 1- Phase 2 Wing C 2023-12-31 0 1 3 4 1 0 24

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 104
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 77 units · avg area 74.17 Sq.mt.
3 BHK 27 units · avg area 89.69 Sq.mt.
  • Wing A
  • Wing B
  • Wing C
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 71.85 12 11
2BHK 75.03 10 8
2BHK 75.75 12 6
3BHK 89.69 12 9
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 109 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths % not reported Water Conservation Rainwater Harvesting 100% Energy Management % not reported
Fire Protection And Fire Safety Requirements 100% Electrical Meter Room Substation Receivingstation 100% Aggregate Area Of Recreational Open Space 98%
Open Parking % not reported Water Supply % not reported Sewerage 100%
Storm Water Drains 100% Landscaping Tree Planting 100% Street Lighting 100%
Community Buildings 100% Treatment And Disposal Of Sewage Sullage Water 100% Solid Waste Management Disposal 100%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Wing A
  • Wing B
  • Wing C
Wing A · Overall Progress 51%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Not Started
% Work0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Not Started
% Work0%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Complete
% Work100%
Stilt Floor
Complete
% Work100%
X number of Slabs of Super Structure
In Progress
% Work75%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
In Progress
% Work37%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Not Started
% Work0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
2 Details Of Encumbrances
3 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
2 Copy Of Layout Approval (In Case Of Layout)
3 Copy Of Layout Approval (In Case Of Layout)
4 Copy Of Layout Approval (In Case Of Layout)
5 Copy Of Layout Approval (In Case Of Layout)
6 Copy Of Layout Approval (In Case Of Layout)
7 Copy Of Layout Approval (In Case Of Layout)
8 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval / NA Order For Plotted Development
1 Commencement Certificates / NA Order For Plotted Development
2 Commencement Certificates / NA Order For Plotted Development
3 Commencement Certificates / NA Order For Plotted Development
4 Commencement Certificates / NA Order For Plotted Development
5 Commencement Certificates / NA Order For Plotted Development
6 Commencement Certificates / NA Order For Plotted Development
7 Commencement Certificates / NA Order For Plotted Development
8 Commencement Certificates / NA Order For Plotted Development
9 Commencement Certificates / NA Order For Plotted Development
10 Commencement Certificates / NA Order For Plotted Development
1 Declaration About Commencement Certificate
2 Declaration About Commencement Certificate
1 Declaration In FORM B
1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
1 Engineer’S Certificate On Cost Incurred On Project (Form 2)
2 Engineer’S Certificate On Cost Incurred On Project (Form 2)
3 Engineer’S Certificate On Cost Incurred On Project (Form 2)
4 Engineer’S Certificate On Cost Incurred On Project (Form 2)
5 Engineer’S Certificate On Cost Incurred On Project (Form 2)
6 Engineer’S Certificate On Cost Incurred On Project (Form 2)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2021-22)
1 CERSAI Details
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Proforma Of Allotment Letter
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC Bank
IFSC HDFC0000227
Country/City