Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

NVG Rakshak RERA Details - PRM/KA/RERA/1251/472/PR/091024/007138 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for NVG Rakshak under registration PRM/KA/RERA/1251/472/PR/091024/007138 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/472/PR/091024/007138
  • Project Name NVG RAKSHAK
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Yelahanka
  • Original Completion 31 December 2029
  • Documents 95 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 21 June 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

AT HOMES ENTERPRISES
Registered Address 401, KAVERI NILAYA, 3RD MAIN, VINAYAKA NAGAR,BAGALUR MAIN ROAD, IAF POST YELAHANKA ,Yelahanka ,Bengaluru Urban-500062
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Plot No.R-9-B (Hardware Sector), Hi-Tech Defence and Aerospace Park, (HARDWARE SECTOR) INDUSTRIAL AREA OF SY.NOS. 470, 471, 472, 473 AND 474 , Bagaluru Village, Jala Hobli, Bangalore North Taluk , Yelahanka , Bengaluru Urban, Karnataka - 562149

RERA Coordinates

Latitude, Longitude 13.085136560568772, 77.60348044697228
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. D03-KIADB-00208/22-23/BP
Authority KIADB - Karnataka Industrial Areas Development Board
Approved Date 09 March 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
NVG RAKSHAK TOWER-1 1 15 1 52 Residential 44.2 13 52
NVG RAKSHAK TOWER-2 1 15 1 52 Residential 44.99 13 52
NVG RAKSHAK TOWER-3 1 15 1 52 Residential 44.99 13 52
NVG RAKSHAK TOWER-4 1 15 1 52 Residential 44.99 13 52
NVG RAKSHAK TOWER-5 1 15 1 182 Residential 44.99 13 182

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
3 BHK 0 units
  • NVG RAKSHAK TOWER-1
  • NVG RAKSHAK TOWER-2
  • NVG RAKSHAK TOWER-3
  • NVG RAKSHAK TOWER-4
  • NVG RAKSHAK TOWER-5
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 93.31 101
GF 3 BHK 92.94 102
GF 3 BHK 92.94 103
GF 3 BHK 93.31 104
1 3 BHK 93.31 201
1 3 BHK 92.94 202
1 3 BHK 92.94 203
1 3 BHK 93.31 204
2 3 BHK 93.31 301
2 3 BHK 92.94 302
2 3 BHK 92.94 303
2 3 BHK 93.31 304
3 3 BHK 93.31 401
3 3 BHK 92.94 402
3 3 BHK 92.94 403
3 3 BHK 93.31 404
4 3 BHK 93.31 501
4 3 BHK 92.94 502
4 3 BHK 92.94 503
4 3 BHK 93.31 504
5 3 BHK 93.31 601
5 3 BHK 92.94 602
5 3 BHK 92.94 603
5 3 BHK 93.31 604
6 3 BHK 93.31 701
6 3 BHK 92.94 702
6 3 BHK 92.94 703
6 3 BHK 93.31 704
7 3 BHK 93.31 801
7 3 BHK 92.94 802
7 3 BHK 92.94 803
7 3 BHK 93.31 804
8 3 BHK 93.31 901
8 3 BHK 92.94 902
8 3 BHK 92.94 903
8 3 BHK 93.31 904
9 3 BHK 93.31 1001
9 3 BHK 92.94 1002
9 3 BHK 92.94 1003
9 3 BHK 93.31 1004
10 3 BHK 93.31 1101
10 3 BHK 92.94 1102
10 3 BHK 92.94 1103
10 3 BHK 93.31 1104
11 3 BHK 93.31 1201
11 3 BHK 92.94 1202
11 3 BHK 92.94 1203
11 3 BHK 93.31 1204
12 3 BHK 93.31 1301
12 3 BHK 92.94 1302
12 3 BHK 92.94 1303
12 3 BHK 93.31 1304
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Common Areas Open Parking Areas % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Gym % not reported Amenities Parks % not reported Amenities Power Backup % not reported
Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Not Applicable.Pdf
Fd 2 Not Applicable.Pdf
Fd 3 Not Applicable.Pdf
Fd 4 Not Applicable.Pdf
Fd 5 Not Applicable.Pdf
Fd 6 Not Applicable.Pdf
Fd 7 Not Applicable.Pdf
Fd 8 Not Applicable.Pdf
Fd 9 Not Applicable.Pdf
Fd 10 Not Applicable.Pdf
Fd 11 Not Applicable.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 Not Applicable.Pdf
Fd 14 Not Applicable.Pdf
Fd 15 Not Applicable.Pdf
Fd 16 Not Applicable.Pdf
Fd 17 Not Applicable.Pdf
Fd 18 Not Applicable.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 IAF NOC G2.Pdf
Od 2 Estimate Cost.Pdf
Od 3 FAR Area Calculation.Pdf
Od 4 Amenities And Common Area.Pdf
Od 5 Area Statement.Pdf
Od 6 STP Drawing.Pdf
Od 7 Possession Certificate.Pdf
Od 8 State Level Single Window Clearance Committee- Order Compressed.Pdf
Od 9 Guidance Value.Pdf
Od 10 Allotment Letter Plot No R-9-B.Pdf
Od 11 Commencement Certificate.Pdf
Od 12 Area Sketch Drawing Single Layout Plan.Jpeg
Od 13 Land Cost Calculation.Pdf
Od 14 Supplementary Deed.Pdf
Od 15 KIADB CDP Plam Demarcated.Pdf
Od 16 AMENITIES.Pdf
Od 17 COMMON AREA DETAILS.Pdf
Od 18 AREA STATEMENT OF FLATS.Pdf
Ed 1 28-08-2024
Ed 2 28-08-2024
Ed 3 28-08-2024
Ed 4 28-08-2024
Ed 5 28-08-2024
Ed 6 28-08-2024
Ed 7 28-08-2024
Ed 8 28-08-2024
Ed 9 28-08-2024
Ed 10 28-08-2024
Ed 11 28-08-2024
Ed 12 28-08-2024
Ed 13 28-08-2024
Ed 14 28-08-2024
Ed 15 28-08-2024
Ed 16 28-08-2024
Ed 17 28-08-2024
Ed 18 28-08-2024
Ed 19 28-08-2024
Ed 20 28-08-2024
Ed 21 28-08-2024
Ed 22 28-08-2024
Ed 23 28-08-2024
Ed 24 17-09-2024
Ed 25 17-09-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 50200097121862
IFSC HDFC0000371
Branch Address YELAHANKA
Country/City