Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Platinum East Woods RERA Details - PRM/KA/RERA/1251/446/PR/100423/005855 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Platinum East Woods under registration PRM/KA/RERA/1251/446/PR/100423/005855 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/100423/005855
  • Project Name PLATINUM EAST WOODS
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 30 March 2027
  • Documents 121 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 08 March 2023 Expected commencement of civil works and foundation on site.
Original Completion 30 March 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

PLATINUM - NARYA INFRA
Registered Address SY NO 191, KANAMANGALA VILLAGE ,BIDARAHALLI HOBLI ,Bengaluru East ,Bengaluru Urban-560067
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY 191, , Kannamangala Village ,Bidarahalli Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560067

RERA Coordinates

Latitude, Longitude 13.031870758879322, 77.76118309076298
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/EM/EO1/TA4/EAST/27/2022-23
Authority BDA - Bangalore Development Authority
Approved Date 05 November 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 2 11 0 210 Residential 29.95 9 188

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 118.755 1
-1 3 BHK 84.202 2
-1 3 BHK 83.542 3
-1 3 BHK 83.542 4
-1 3 BHK 83.121 5
-1 2 BHK 67.966 6
-1 2 BHK 68.306 7
-1 2 BHK 67.966 8
-1 2 BHK 62.828 9
-1 2 BHK 63.684 10
-1 3 BHK 77.719 11
-1 2 BHK 74.948 12
-1 3 BHK 98.197 13
-1 3 BHK 116.284 14
-1 3 BHK 106.08 15
-1 2 BHK 77.389 16
-1 2 BHK 72.077 17
GF 4 BHK 118.755 101
GF 3 BHK 84.202 102
GF 3 BHK 83.542 103
GF 3 BHK 83.542 104
GF 3 BHK 83.121 105
GF 2 BHK 67.966 106
GF 2 BHK 68.306 107
GF 2 BHK 67.966 108
GF 2 BHK 67.996 109
GF 3 BHK 108.281 110
GF 2 BHK 62.824 111
GF 2 BHK 63.684 112
GF 3 BHK 77.719 113
GF 2 BHK 74.948 114
GF 3 BHK 98.197 115
GF 3 BHK 116.284 116
GF 3 BHK 106.08 117
GF 2 BHK 77.389 118
GF 2 BHK 72.077 119
1 4 BHK 126.407 201
1 3 BHK 87.713 202
1 3 BHK 87.093 203
1 3 BHK 87.093 204
1 3 BHK 86.443 205
1 2 BHK 71.007 206
1 2 BHK 71.357 207
1 2 BHK 71.007 208
1 2 BHK 71.047 209
1 3 BHK 108.741 210
1 2 BHK 63.704 211
1 2 BHK 67.045 212
1 3 BHK 81.401 213
1 2 BHK 78.49 214
1 3 BHK 99.998 215
1 3 BHK 118.104 216
1 3 BHK 107.921 217
1 2 BHK 79.68 218
1 2 BHK 75.859 219
2 4 BHK 126.407 301
2 3 BHK 87.713 302
2 3 BHK 87.093 303
2 3 BHK 87.093 304
2 3 BHK 86.443 305
2 2 BHK 71.007 306
2 2 BHK 71.357 307
2 2 BHK 71.007 308
2 2 BHK 71.047 309
2 3 BHK 108.741 310
2 2 BHK 63.704 311
2 2 BHK 67.045 312
2 3 BHK 81.401 313
2 2 BHK 78.49 314
2 3 BHK 99.998 315
2 3 BHK 118.104 316
2 3 BHK 107.921 317
2 2 BHK 79.68 318
2 2 BHK 75.859 319
3 4 BHK 126.407 401
3 3 BHK 87.713 402
3 3 BHK 87.093 403
3 3 BHK 87.093 404
3 3 BHK 86.443 405
3 2 BHK 71.007 406
3 2 BHK 71.357 407
3 2 BHK 71.007 408
3 2 BHK 71.047 409
3 3 BHK 108.741 410
3 2 BHK 63.704 411
3 2 BHK 67.045 412
3 3 BHK 81.401 413
3 2 BHK 78.49 414
3 3 BHK 99.998 415
3 3 BHK 118.104 416
3 3 BHK 107.921 417
3 2 BHK 79.68 418
3 2 BHK 75.859 419
4 4 BHK 126.407 501
4 3 BHK 87.713 502
4 3 BHK 87.093 503
4 3 BHK 87.093 504
4 3 BHK 86.443 505
4 2 BHK 71.007 506
4 2 BHK 71.357 507
4 2 BHK 71.007 508
4 2 BHK 71.047 509
4 3 BHK 108.741 510
4 2 BHK 63.704 511
4 2 BHK 67.045 512
4 3 BHK 81.401 513
4 2 BHK 78.49 514
4 3 BHK 99.998 515
4 3 BHK 118.104 516
4 3 BHK 107.921 517
4 2 BHK 79.68 518
4 2 BHK 75.859 519
5 4 BHK 126.407 601
5 3 BHK 87.713 602
5 3 BHK 87.093 603
5 3 BHK 87.093 604
5 3 BHK 86.443 605
5 2 BHK 71.007 606
5 2 BHK 71.357 607
5 2 BHK 71.007 608
5 2 BHK 71.047 609
5 3 BHK 108.741 610
5 2 BHK 63.704 611
5 2 BHK 67.045 612
5 3 BHK 81.401 613
5 2 BHK 78.49 614
5 3 BHK 99.998 615
5 3 BHK 118.104 616
5 3 BHK 107.921 617
5 2 BHK 79.68 618
5 2 BHK 75.859 619
6 4 BHK 126.407 701
6 3 BHK 87.713 702
6 3 BHK 87.093 703
6 3 BHK 87.093 704
6 3 BHK 86.443 705
6 2 BHK 71.007 706
6 2 BHK 71.357 707
6 2 BHK 71.007 708
6 2 BHK 71.047 709
6 3 BHK 108.741 710
6 2 BHK 63.704 711
6 2 BHK 67.045 712
6 3 BHK 81.401 713
6 2 BHK 78.49 714
6 3 BHK 99.998 715
6 3 BHK 118.104 716
6 3 BHK 107.921 717
6 2 BHK 79.68 718
6 2 BHK 75.859 719
7 4 BHK 126.407 801
7 3 BHK 87.713 802
7 3 BHK 87.093 803
7 3 BHK 87.093 804
7 3 BHK 86.443 805
7 2 BHK 71.007 806
7 2 BHK 71.357 807
7 2 BHK 71.007 808
7 2 BHK 71.047 809
7 3 BHK 108.741 810
7 2 BHK 63.704 811
7 2 BHK 67.045 812
7 3 BHK 81.401 813
7 2 BHK 78.49 814
7 3 BHK 99.998 815
7 3 BHK 118.104 816
7 3 BHK 107.921 817
7 2 BHK 79.68 818
7 2 BHK 75.859 819
8 4 BHK 126.407 901
8 3 BHK 87.713 902
8 3 BHK 87.093 903
8 3 BHK 87.093 904
8 3 BHK 86.443 905
8 2 BHK 71.007 906
8 2 BHK 71.357 907
8 2 BHK 71.007 908
8 2 BHK 71.047 909
8 3 BHK 108.741 910
8 2 BHK 63.704 911
8 2 BHK 67.045 912
8 3 BHK 81.401 913
8 2 BHK 78.49 914
8 3 BHK 99.998 915
8 3 BHK 118.104 916
8 3 BHK 107.921 917
8 2 BHK 79.68 918
8 2 BHK 75.859 919
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS 21-22.Pdf
Fd 2 BS 20-21.Pdf
Fd 3 Not Applicable.Pdf
Fd 4 P&L 21-22.Pdf
Fd 5 P&L 20-21.Pdf
Fd 6 Not Applicable.Pdf
Fd 7 RERA NA-1.Pdf
Fd 8 RERA NA-1.Pdf
Fd 9 Not Applicable.Pdf
Fd 10 All Platinm Narya Balance Sheet 2022.Pdf
Fd 11 ALl Platinum Narya Balance Sheet 2021.Pdf
Fd 12 Not Applicable.Pdf
Fd 13 All Platinm Narya Balance Sheet 2022.Pdf
Fd 14 ALl Platinum Narya Balance Sheet 2021.Pdf
Fd 15 Not Applicable.Pdf
Fd 16 ITR 2021-22.Pdf
Fd 17 ITR 2020-2021.Pdf
Fd 18 Not Applicable.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 1 Sagavali Chit Vahi Nakalu.Pdf
Od 2 3 Index Of Lands.Pdf
Od 3 4 Record Of Right No 333.Pdf
Od 4 6 Sale Deed 30 03 1954.Pdf
Od 5 7 Sale Deed 11 04 1973.Pdf
Od 6 EC From 01 04 1950 To 26 01 2023.Pdf
Od 7 Endorsement Certificate.Pdf
Od 8 Endorsement 12 06 2020.Pdf
Od 9 Guideline Value.Pdf
Od 10 Nil Tenancy Certificate.Pdf
Od 11 Survey Sketch And Mula Tippany.Pdf
Od 12 Airport Undertaking Letter.Pdf
Od 13 BDA Licence.Pdf
Od 14 BDA Fees.Pdf
Od 15 BSNL Payment & Invoice.Pdf
Od 16 Fire NOC Platinum Narya 11zon (1).Pdf
Od 17 Fire Receipt.Pdf
Od 18 CDP Plan Marking.Jpg
Od 19 CDP Plan.Pdf
Od 20 Site Marking.Pdf
Od 21 Village Map .Pdf
Od 22 Village Map Site Marking.Pdf
Od 23 Panchayat Noc.Pdf
Od 24 KSPCB NOC.Pdf
Od 25 KSPCB Receipt.Pdf
Od 26 Khajane 2 Challan.Pdf
Od 27 SEIAA.Pdf
Od 28 SEIAA Corrigendum 188 Units.Pdf
Od 29 Common Area Alloted Letter.Pdf
Od 30 Hissa Phody Copy.Pdf
Od 31 Relinquishment Deed.Pdf
Od 32 Single Plot Layout.Pdf
Od 33 Memorandam Issued By Deputy Commissioner.Pdf
Od 34 NARYA PLATINUM - STP DRAWING.Pdf
Od 35 STP Location Marked Sanction Plan.Pdf
Ed 1 22-02-2023
Ed 2 22-02-2023
Ed 3 22-02-2023
Ed 4 22-02-2023
Ed 5 22-02-2023
Ed 6 22-02-2023
Ed 7 22-02-2023
Ed 8 22-02-2023
Ed 9 22-02-2023
Ed 10 08-03-2023
Ed 11 24-03-2023
Ed 12 01-04-2023
Ed 13 01-04-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Bank of Baroda
Account Number (RERA) 27500200002177
IFSC BARB0JPNAGA
Branch Address J P Nagar 2nd Phase
Country/City