residential Under Construction Source: rera.ka

VBHC Haven of Joy RERA Details - PRM/KA/RERA/1251/310/PR/200123/005634 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for VBHC Haven of Joy under registration PRM/KA/RERA/1251/310/PR/200123/005634 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/200123/005634
  • Project Name VBHC Haven of Joy
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 September 2026
  • Documents 160 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 15 January 2022 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

VBHC Mumbai Value Homes Pvt Ltd
Registered Address VBHC House, #74 & 75,Millers road, Vasantha Nagar ,Bengaluru North ,Bengaluru Urban-560052
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address VBHC Haven of Joy, 25/P,28/1,28/2,29/4,29/6,29/7,29/9,29/10,29/11,29/12,29/13,29/14,29/15,32/1A , DODDABELE VILLAGE, KENGERI HOBLI, BANGALORE SOUTH TALUK, BENGALURU SOUTH, BENGALURU URBAN , Bengaluru South , Bengaluru Urban, Karnataka - 560060

RERA Coordinates

Latitude, Longitude 12.888055485966104, 77.46821679007884
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NM/AS/AA-1/TS-2/S/21-2015-16
Authority BDA - Bangalore Development Authority
Approved Date 29 September 2015

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
B1 1 21 1 130 Residential 59.9 20 200
B2 1 21 1 80 Residential 59.9 20 80
B3 1 21 1 80 Residential 59.9 20 80
B4 1 21 1 80 Residential 59.9 20 80

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
  • B1
  • B2
  • B3
  • B4
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 47 B1 101
GF 1 BHK 26 B1 102
GF 1 BHK 26 B1 103
GF 1 BHK 26 B1 104
GF 1 BHK 33 B1 105
GF 1 BHK 33 B1 106
GF 1 BHK 33 B1 107
GF 1 BHK 33 B1 108
GF 2 BHK 48 B1 109
GF 2 BHK 48 B1 110
1 2 BHK 47 B1 201
1 1 BHK 26 B1 202
1 1 BHK 26 B1 203
1 1 BHK 26 B1 204
1 1 BHK 33 B1 205
1 1 BHK 33 B1 206
1 1 BHK 33 B1 207
1 1 BHK 33 B1 208
1 2 BHK 48 B1 209
1 2 BHK 48 B1 210
2 2 BHK 47 B1 301
2 1 BHK 26 B1 302
2 1 BHK 26 B1 303
2 1 BHK 26 B1 304
2 1 BHK 33 B1 305
2 1 BHK 33 B1 306
2 1 BHK 33 B1 307
2 1 BHK 33 B1 308
2 2 BHK 48 B1 309
2 2 BHK 48 B1 310
3 2 BHK 47 B1 401
3 1 BHK 26 B1 402
3 1 BHK 26 B1 403
3 1 BHK 26 B1 404
3 1 BHK 33 B1 405
3 1 BHK 33 B1 406
3 1 BHK 33 B1 407
3 1 BHK 33 B1 408
3 2 BHK 48 B1 409
3 2 BHK 48 B1 410
4 2 BHK 47 B1 501
4 1 BHK 26 B1 502
4 1 BHK 26 B1 503
4 1 BHK 26 B1 504
4 1 BHK 33 B1 505
4 1 BHK 33 B1 506
4 1 BHK 33 B1 507
4 1 BHK 33 B1 508
4 2 BHK 48 B1 509
4 2 BHK 48 B1 510
5 2 BHK 47 B1 601
5 1 BHK 26 B1 602
5 1 BHK 26 B1 603
5 1 BHK 26 B1 604
5 1 BHK 33 B1 605
5 1 BHK 33 B1 606
5 1 BHK 33 B1 607
5 1 BHK 33 B1 608
5 2 BHK 48 B1 609
5 2 BHK 48 B1 610
6 2 BHK 47 B1 701
6 1 BHK 26 B1 702
6 1 BHK 26 B1 703
6 1 BHK 26 B1 704
6 1 BHK 33 B1 705
6 1 BHK 33 B1 706
6 1 BHK 33 B1 707
6 1 BHK 33 B1 708
6 2 BHK 48 B1 709
6 2 BHK 48 B1 710
7 2 BHK 47 B1 801
7 1 BHK 26 B1 802
7 1 BHK 26 B1 803
7 1 BHK 26 B1 804
7 1 BHK 33 B1 805
7 1 BHK 33 B1 806
7 1 BHK 33 B1 807
7 1 BHK 33 B1 808
7 2 BHK 48 B1 809
7 2 BHK 48 B1 810
8 2 BHK 47 B1 901
8 1 BHK 26 B1 902
8 1 BHK 26 B1 903
8 1 BHK 26 B1 904
8 1 BHK 33 B1 905
8 1 BHK 33 B1 906
8 1 BHK 33 B1 907
8 1 BHK 33 B1 908
8 2 BHK 48 B1 909
8 2 BHK 48 B1 910
9 2 BHK 47 B1 1001
9 1 BHK 26 B1 1002
9 1 BHK 26 B1 1003
9 1 BHK 26 B1 1004
9 1 BHK 33 B1 1005
9 1 BHK 33 B1 1006
9 1 BHK 33 B1 1007
9 1 BHK 33 B1 1008
9 2 BHK 48 B1 1009
9 2 BHK 48 B1 1010
10 2 BHK 47 B1 1101
10 1 BHK 26 B1 1102
10 1 BHK 26 B1 1103
10 1 BHK 26 B1 1104
10 1 BHK 33 B1 1105
10 1 BHK 33 B1 1106
10 1 BHK 33 B1 1107
10 1 BHK 33 B1 1108
10 2 BHK 48 B1 1109
10 2 BHK 48 B1 1110
11 2 BHK 47 B1 1201
11 1 BHK 26 B1 1202
11 1 BHK 26 B1 1203
11 1 BHK 26 B1 1204
11 1 BHK 33 B1 1205
11 1 BHK 33 B1 1206
11 1 BHK 33 B1 1207
11 1 BHK 33 B1 1208
11 2 BHK 48 B1 1209
11 2 BHK 48 B1 1210
12 2 BHK 47 B1 1301
12 1 BHK 26 B1 1302
12 1 BHK 26 B1 1303
12 1 BHK 26 B1 1304
12 1 BHK 33 B1 1305
12 1 BHK 33 B1 1306
12 1 BHK 33 B1 1307
12 1 BHK 33 B1 1308
12 2 BHK 48 B1 1309
12 2 BHK 48 B1 1310
13 2 BHK 47 B1 1401
13 1 BHK 26 B1 1402
13 1 BHK 26 B1 1403
13 1 BHK 26 B1 1404
13 1 BHK 33 B1 1405
13 1 BHK 33 B1 1406
13 1 BHK 33 B1 1407
13 1 BHK 33 B1 1408
13 2 BHK 48 B1 1409
13 2 BHK 48 B1 1410
14 2 BHK 47 B1 1501
14 1 BHK 26 B1 1502
14 1 BHK 26 B1 1503
14 1 BHK 26 B1 1504
14 1 BHK 33 B1 1505
14 1 BHK 33 B1 1506
14 1 BHK 33 B1 1507
14 1 BHK 33 B1 1508
14 2 BHK 48 B1 1509
14 2 BHK 48 B1 1510
15 2 BHK 47 B1 1601
15 1 BHK 26 B1 1602
15 1 BHK 26 B1 1603
15 1 BHK 26 B1 1604
15 1 BHK 33 B1 1605
15 1 BHK 33 B1 1606
15 1 BHK 33 B1 1607
15 1 BHK 33 B1 1608
15 2 BHK 48 B1 1609
15 2 BHK 48 B1 1610
16 2 BHK 47 B1 1701
16 1 BHK 26 B1 1702
16 1 BHK 26 B1 1703
16 1 BHK 26 B1 1704
16 1 BHK 33 B1 1705
16 1 BHK 33 B1 1706
16 1 BHK 33 B1 1707
16 1 BHK 33 B1 1708
16 2 BHK 48 B1 1709
16 2 BHK 48 B1 1710
17 2 BHK 47 B1 1801
17 1 BHK 26 B1 1802
17 1 BHK 26 B1 1803
17 1 BHK 26 B1 1804
17 1 BHK 33 B1 1805
17 1 BHK 33 B1 1806
17 1 BHK 33 B1 1807
17 1 BHK 33 B1 1808
17 2 BHK 48 B1 1809
17 2 BHK 48 B1 1810
18 2 BHK 47 B1 1901
18 1 BHK 26 B1 1902
18 1 BHK 26 B1 1903
18 1 BHK 26 B1 1904
18 1 BHK 33 B1 1905
18 1 BHK 33 B1 1906
18 1 BHK 33 B1 1907
18 1 BHK 33 B1 1908
18 2 BHK 48 B1 1909
18 2 BHK 48 B1 1910
19 2 BHK 47 B1 2001
19 1 BHK 26 B1 2002
19 1 BHK 26 B1 2003
19 1 BHK 26 B1 2004
19 1 BHK 33 B1 2005
19 1 BHK 33 B1 2006
19 1 BHK 33 B1 2007
19 1 BHK 33 B1 2008
19 2 BHK 48 B1 2009
19 2 BHK 48 B1 2010
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported Internal Infrastructure Sewage Treatment Plant (Stp) % not reported
Internal Infrastructure Street Lighting % not reported Internal Infrastructure Internal Roads & Footpaths % not reported Internal Infrastructure Internal Driveways % not reported
Internal Infrastructure Transformer Yard % not reported Internal Infrastructure Storm Water Drains % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ed 50 07-01-2023
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 Balance Sheet FS21.Pdf
Fd 2 Balanace Sheet FY20.Pdf
Fd 3 Balance Sheet FY19.Pdf
Fd 4 Profit Loss FS Mar 21.Pdf
Fd 5 Profit Loss FY20.Pdf
Fd 6 Profit Loss FY19.Pdf
Fd 7 Directors Report FY20021.Pdf
Fd 8 Directors Report FY1920.Pdf
Fd 9 Directors Report FY1819.Pdf
Fd 10 Cashflow FS21.Pdf
Fd 11 Cash Flow FY20.Pdf
Fd 12 Cashflow FY19.Pdf
Fd 13 Auditor Report FS21.Pdf
Fd 14 Auditors Report FY20.Pdf
Fd 15 Auditor Report FY19.Pdf
Fd 16 IT FY2021 NA.Pdf
Fd 17 IT FY 201920.Pdf
Fd 18 IT FY 201819.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 23 Proforma For Sale Deed*( Annexure - 88 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1
Ed 1 13-01-2022
Ed 2 13-01-2022
Ed 3 05-02-2022
Ed 4 04-03-2022
Ed 5 04-03-2022
Ed 6 04-03-2022
Ed 7 04-03-2022
Ed 8 04-03-2022
Ed 9 04-03-2022
Ed 10 04-03-2022
Ed 11 04-03-2022
Ed 12 04-03-2022
Ed 13 04-03-2022
Ed 14 04-03-2022
Ed 15 04-03-2022
Ed 16 04-03-2022
Ed 17 04-03-2022
Ed 18 04-03-2022
Ed 19 04-03-2022
Ed 20 04-03-2022
Ed 21 04-03-2022
Ed 22 29-12-2022
Ed 23 29-12-2022
Ed 24 29-12-2022
Ed 25 07-01-2023
Ed 26 07-01-2023
Ed 27 07-01-2023
Ed 28 07-01-2023
Ed 29 07-01-2023
Ed 30 07-01-2023
Ed 31 07-01-2023
Ed 32 07-01-2023
Ed 33 07-01-2023
Ed 34 07-01-2023
Ed 35 07-01-2023
Ed 36 07-01-2023
Ed 37 07-01-2023
Ed 38 07-01-2023
Ed 39 07-01-2023
Ed 40 07-01-2023
Ed 41 07-01-2023
Ed 42 07-01-2023
Ed 43 07-01-2023
Ed 44 07-01-2023
Ed 45 07-01-2023
Ed 46 07-01-2023
Ed 47 07-01-2023
Ed 48 07-01-2023
Ed 49 07-01-2023
Ed 51 07-01-2023
Ed 52 07-01-2023
Ed 53 07-01-2023
Ed 54 07-01-2023
Ed 55 07-01-2023
Ed 56 07-01-2023
Ed 57 07-01-2023
Ed 58 07-01-2023
Ed 59 07-01-2023
Ed 60 07-01-2023
Ed 61 07-01-2023
Ed 62 07-01-2023
Ed 63 07-01-2023
Ed 64 07-01-2023
Ed 65 07-01-2023
Ed 66 07-01-2023
Ed 67 07-01-2023
Ed 68 07-01-2023
Ed 69 07-01-2023
Ed 70 07-01-2023
Ed 71 07-01-2023
Ed 72 07-01-2023
Ed 73 07-01-2023
Ed 74 07-01-2023
Ed 75 07-01-2023
Ed 76 07-01-2023
Ed 77 07-01-2023
Ed 78 07-01-2023
Ed 79 07-01-2023
Ed 80 07-01-2023
Ed 81 07-01-2023
Ed 82 07-01-2023
Ed 83 07-01-2023
Ed 84 07-01-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank INDUSIND BANK
Account Number (RERA) 252510000012
IFSC INDB0000008
Branch Address MG Road
Country/City