Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Oberoi Three Sixty West RERA Details - P51900012115, Mumbai

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Oberoi Three Sixty West under registration P51900012115 in Mumbai, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51900012115
  • Project Name Three Sixty West
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Mumbai Suburban
  • Taluka Borivali
  • Original Completion 30 June 2021
  • Revised Completion 30 June 2022
  • Project Area (in Sq.mt.) 6,405.56
  • Total Buildings/Towers 2
  • Documents 3 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2021 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 June 2022 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Others
Individual Name Oasis Realty

Promoters, Co-promoters & Members

Name
Oberoi Constructions Limited
Sky Lark Buildcon Private LImited
Shree Vrunda Enterprises
Astir Realty LLP
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Survey Number C.S. no 286 pt of Lower Parel Division and final plot no 1078 of TPS IV of Mahim Division

Boundary Details

Boundaries East 12m wide DP Road Boundaries West Dr Annie Besant Road
Boundaries South Proposed 22point8 mtrs wide DPP Road Boundaries North Plot no 1079pt and 1080pt

RERA Coordinates

Latitude, Longitude 19.011080400000000, 72.823315900000010

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Three Sixty West Tower A 0 168 71 0 0 NA
Three Sixty West Tower B 0 936 109 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 284
Configurations 21
Inventory Type RESIDENTIAL
Configuration Distribution
Type 1 24 units · avg area 1084.73 Sq.mt.
Z1 Duplex B 2 units · avg area 428.45 Sq.mt.
Z1 5Bed 59 units · avg area 351.36 Sq.mt.
Z1 4Bed 46 units · avg area 304.86 Sq.mt.
Z1 5Bed Terrace Apt 1 unit · avg area 351.36 Sq.mt.
Z1 Duplex A 6 units · avg area 427.98 Sq.mt.
Z1 4Bed TerraceApt B 1 unit · avg area 304.86 Sq.mt.
Z1 4Bed TerraceApt A 1 unit · avg area 304.86 Sq.mt.
Z1 Duplex C 2 units · avg area 655.66 Sq.mt.
Type 2 4 units · avg area 817.48 Sq.mt.
Z2 4Bed 32 units · avg area 315.68 Sq.mt.
Z2 5Bed Type A 1 unit · avg area 465.61 Sq.mt.
Z2 5Bed Type B 1 unit · avg area 376.73 Sq.mt.
Z2 Duplex A 2 units · avg area 450.41 Sq.mt.
Z2 Duplex C 1 unit · avg area 578.36 Sq.mt.
Z2 Duplex B 1 unit · avg area 643.01 Sq.mt.
Z2 5Bed 38 units · avg area 362.04 Sq.mt.
Z3 4Bed 24 units · avg area 437.14 Sq.mt.
Z3 Duplex 4 units · avg area 662.77 Sq.mt.
Z3 5Bed 32 units · avg area 433.20 Sq.mt.
Penthouse 2 units · avg area 1025.32 Sq.mt.
  • Tower A
  • Tower B
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
Type 1 1084.73 24 1
Type 2 817.48 4 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 95.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 87.0%
Storm Water Drains 96.0% Landscaping & Tree Planting 90.0% Street Lighting 90.0%
Community Buildings 99.0% Treatment And Disposal Of Sewage And Sullage Water 90.0% Solid Waste Management And Disposal 75.0%
Water Conservation /Rain Water Harvesting 90.0% Energy Managemcnt 70.0% Fire Protection And Fire Safety Requirements 95.0%
Electrical Meter Room, Sub-station, Receiving Station 95.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Tower A Is Proposed To Comprise Of Upto 34 Floors For Hotel Users % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Tower A
  • Tower B
Tower A · Overall Progress 74%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work79%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work81%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work59%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AXIS BANK
IFSC UTIB0000373
Branch Address Manish Chambers, Commercial Complex, Sonawala Road, Goregaon East, Mumbai 400063
Country/City