Sports
- Kids' Play Areas / Sand Pits
- Jogging / Cycle Track
Price on Request
Chaurang Sanskruti's average asking price is rising quarter-on-quarter, compared with Hadapsar.
Chaurang Sanskruti avg. price is ₹ 10.8 K/Sq.Ft. compared to Hadapsar at ₹ 14.2 K/Sq.Ft.
Monthly Rent in Hadapsar ranges from ₹ 24.9 K to ₹ 87.1 K with options available for 1,2,3,4 BHK units
Get the latest price and market updates for Chaurang Sanskruti.
Maharashtra Cabinet Committee has approved the revised cost of ₹10,502.36 crore for the eastern extension of the Pune Ring Road. This 31.805-km controlled-access expressway aims to divert traffic away from Pune city. With 80% of land acquisition complete, the project is slated for completion by June 2029
MSIDC and Pune Metro are set to sign MoUs to integrate Metro infrastructure with two upcoming road projects. Approximately 7.7 km of the Kharadi-Shirur elevated corridor and 17 km of the Hadapsar-Yavat elevated corridor will be developed as double-decker structures, with the upper deck designed to accommodate future Metro lines.
Cm Devendra Fadnavis laid the foundation stones for three elevated road projects worth ₹18,000 crore in Pune. These projects aim to significantly reduce traffic congestion across the city and its surrounding areas. The projects include the Pune-Shirur Elevated Highway, Hadapsar-Yavat Elevated Highway, and Talegaon-Chakan-Shikrapur Elevated Highway,.
Pune Metro's Phase 2 plans include approximately 22 km of integrated double-decker flyovers across the city. These corridors will feature six-lane and eight-lane elevated roads. Key stretches are planned on the Ramwadi-Wagholi, Vanaz-Chandani Chowk, Kharadi-Khadakwasla, and Bhairoba Nala-Akashwani routes.
Pune's new double-decker flyover, featuring a road flyover below and a Metro line above, was inaugurated by Chief Minister Devendra Fadnavis to alleviate traffic congestion in areas like Baner, Pashan, Shivajinagar, and Aundh. Additionally, a 31.50 km six-lane elevated highway will be constructed on the Pune-Solapur national highway from Hadapsar to Yavat at a cost of ₹5,262 crore
Pune is experiencing advancements in several infrastructure projects. The Pune-Lonavla rail corridor is being upgraded to facilitate speeds of up to 130 kmph by June 2026.The state government has sanctioned ₹350 crore to strengthen the electricity network in Pune and Pimpri-Chinchwad. Works are expedited for water supply infrastructure projects in the Aundh-Bopodi area.
Several infrastructure projects in and around Pune are progressing towards completion. One of the two new river bridges on the Mutha River at Warje on the Mumbai-Bengaluru Bypass is complete ,awaiting final testing, Balewadi-Kaspate Wasti bridge over the Mula-Mutha river, is expected to complete in an year. Pune University Square flyover is targeted for completion in 2026 ,easing traffic to Shivajinagar, Aundh, Baner, and Pashan.
Two key flyovers in East Pune, at Hadapsar Gadital and Magarpatta Chowk, are likely to be dismantled to facilitate a proposed 40-km multilevel flyover and Metro corridor along the Solapur Highway. This move is part of a larger plan to create an integrated elevated transport corridor to ease traffic congestion.

Estimate commute from your office or kid's school to Chaurang Sanskruti.
Please select the starting point to calculate the travel time.
This website is only for the purpose of providing information regarding real estate projects in different geographies. Any information which is being provided on this website is not an advertisement or a solicitation. The company has not verified the information and the compliances of the projects. Further, the company has not checked the RERA* registration status of the real estate projects listed herein. The company does not make any representation in regards to the compliances done against these projects. Please note that you should make yourself aware about the RERA* registration status of the listed real estate projects.
*Real Estate (Regulation & Development) Act, 2016.