Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

Rainbow Uno RERA Details - PRM/KA/RERA/1251/310/PR/180326/008540 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Rainbow Uno under registration PRM/KA/RERA/1251/310/PR/180326/008540 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/180326/008540
  • Project Name RAINBOW UNO
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 30 June 2031
  • Documents 70 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 19 February 2026 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/S. RAINVAS INFRAA
Registered Address NO 6(19/455), 2ND FLOOR, 27TH CROSS, 4TH BLOCK ,JAYANAGAR, GEETA COLONY ,Bengaluru South ,Bengaluru Urban-560011
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 15/1 (OLD SY NO 15), VASANTHAPURA VILLAGE, , UTTARAHALLI HOBLI, BANGALORE SOUTH TALUK , Bengaluru South , Bengaluru Urban, Karnataka - 560062

RERA Coordinates

Latitude, Longitude 12.901447, 77.552894
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/ADDL.DIR/JDSOUTH/0022/25-26
Authority BDA - Bangalore Development Authority
Approved Date 19 February 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
1 2 22 0 152 Residential 64.2 20 120
2 2 22 0 152 Residential 64.2 20 120

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • 1
  • 2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 4 BHK 154 A101
GF 4 BHK 147 A102
GF 4 BHK 149 A103
GF 3 BHK 137 A104
GF 3 BHK 125 A105
GF 3 BHK 125 A106
1 4 BHK 154 A201
1 4 BHK 147 A202
1 4 BHK 149 A203
1 3 BHK 137 A204
1 3 BHK 125 A205
1 3 BHK 125 A206
2 4 BHK 154 A301
2 4 BHK 147 A302
2 4 BHK 149 A303
2 3 BHK 137 A304
2 3 BHK 125 A305
2 3 BHK 125 A306
3 4 BHK 154 A401
3 4 BHK 147 A402
3 4 BHK 149 A403
3 3 BHK 137 A404
3 3 BHK 125 A405
3 3 BHK 125 A406
4 4 BHK 154 A501
4 4 BHK 147 A502
4 4 BHK 149 A503
4 3 BHK 137 A504
4 3 BHK 125 A505
4 3 BHK 125 A506
5 4 BHK 154 A601
5 4 BHK 147 A602
5 4 BHK 149 A603
5 3 BHK 137 A604
5 3 BHK 125 A605
5 3 BHK 125 A606
6 4 BHK 154 A701
6 4 BHK 147 A702
6 4 BHK 149 A703
6 3 BHK 137 A704
6 3 BHK 125 A705
6 3 BHK 125 A706
7 4 BHK 154 A801
7 4 BHK 147 A802
7 4 BHK 149 A803
7 3 BHK 137 A804
7 3 BHK 125 A805
7 3 BHK 125 A806
8 4 BHK 154 A901
8 4 BHK 147 A902
8 4 BHK 149 A903
8 3 BHK 137 A904
8 3 BHK 125 A905
8 3 BHK 125 A906
9 4 BHK 154 A1001
9 4 BHK 147 A1002
9 4 BHK 149 A1003
9 3 BHK 137 A1004
9 3 BHK 125 A1005
9 3 BHK 125 A1006
10 4 BHK 154 A1101
10 4 BHK 147 A1102
10 4 BHK 149 A1103
10 3 BHK 137 A1104
10 3 BHK 125 A1105
10 3 BHK 125 A1106
11 4 BHK 154 A1201
11 4 BHK 147 A1202
11 4 BHK 149 A1203
11 3 BHK 137 A1204
11 3 BHK 125 A1205
11 3 BHK 125 A1206
12 4 BHK 154 A1301
12 4 BHK 147 A1302
12 4 BHK 149 A1303
12 3 BHK 137 A1304
12 3 BHK 125 A1305
12 3 BHK 125 A1306
13 4 BHK 154 A1401
13 4 BHK 147 A1402
13 4 BHK 149 A1403
13 3 BHK 137 A1404
13 3 BHK 125 A1405
13 3 BHK 125 A1406
14 4 BHK 154 A1501
14 4 BHK 147 A1502
14 4 BHK 149 A1503
14 3 BHK 137 A1504
14 3 BHK 125 A1505
14 3 BHK 125 A1506
15 4 BHK 154 A1601
15 4 BHK 147 A1602
15 4 BHK 149 A1603
15 3 BHK 137 A1604
15 3 BHK 125 A1605
15 3 BHK 125 A1606
16 4 BHK 154 A1701
16 4 BHK 147 A1702
16 4 BHK 149 A1703
16 3 BHK 137 A1704
16 3 BHK 125 A1705
16 3 BHK 125 A1706
17 4 BHK 154 A1801
17 4 BHK 147 A1802
17 4 BHK 149 A1803
17 3 BHK 137 A1804
17 3 BHK 125 A1805
17 3 BHK 125 A1806
18 4 BHK 154 A1901
18 4 BHK 147 A1902
18 4 BHK 149 A1903
18 3 BHK 137 A1904
18 3 BHK 125 A1905
18 3 BHK 125 A1906
19 4 BHK 154 A2001
19 4 BHK 147 A2002
19 4 BHK 149 A2003
19 3 BHK 137 A2004
19 3 BHK 125 A2005
19 3 BHK 125 A2006
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Rainvas Infraa Financials AY 25 26.Pdf
Fd 2 Rainvas Infraa AY 24 25.Pdf
Fd 3 Rainvas Infraa AY 23 24.Pdf
Fd 4 Rainvas Infraa Financials AY 25 26.Pdf
Fd 5 Rainvas Infraa AY 24 25.Pdf
Fd 6 Rainvas Infraa AY 23 24.Pdf
Fd 7 Rainvas Infraa Financials AY 25 26.Pdf
Fd 8 Rainvas Infraa AY 24 25.Pdf
Fd 9 Rainvas Infraa AY 23 24.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Noc 8 Lift Authorities( Annexure - 102 )
Noc 9 BMRCL( Annexure - 103 )
Noc 10 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 11 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 12 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 Single Plan Layout Approval.Pdf
Od 2 Single Site Plan ADLR SKECTH.Pdf
Od 3 RAINBOW UNO GPA Sy No 15 1.Pdf
Od 4 Title Deed.Pdf
Od 5 8 Old Partition.Pdf
Od 6 CC Of Release Deed.Pdf
Od 7 UNO VILLAGE MAP.Pdf
Od 8 Area Statement.Pdf
Od 9 Common Area And Amenities.Pdf
Od 10 UNO RERA MASTER PLAN.Pdf
Od 11 UNO PROJECT GPS PHOTO 5.Jpeg
Od 12 RAINBOW UNO CARPET AREA CALCULATIONS.Pdf
Od 13 UNO BOREWELL GPS PHOTO 1.Pdf
Od 14 UNO WATER SOURCES.Pdf
Od 15 RERA UNO LAND VALUE.Pdf
Od 16 Project Brief Estimated Cost.Pdf
Od 17 Confirmation Deed Of UNO.Pdf
Od 18 UNO STP Plan.Pdf
Od 19 UNO MR EXTRACT M R 3 2003 04.Pdf
Ed 1 12-03-2026
Ed 2 12-03-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001920781
IFSC HDFC0000009
Branch Address KASTURBA ROAD
Country/City