Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

MJR Divine Meadows RERA Details - PRM/KA/RERA/1251/308/PR/230926/008967 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for MJR Divine Meadows under registration PRM/KA/RERA/1251/308/PR/230926/008967 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/230926/008967
  • Project Name DIVINE MEADOWS PHASE 2
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2031
  • Documents 70 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 30 September 2026 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2031 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MAX GLOBAL DEVELOPERS
Registered Address III Floor, No.444, 15th Cross,5th Main, HSR Layout ,Bengaluru South ,Bengaluru Urban-560102
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

RERA Coordinates

Latitude, Longitude 12.870167, 77.799291
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/593/2025-26/914
Authority Satellite Town Ring Road Planning Authority
Approved Date 15 July 2026

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block 0 3 0 158 Residential 9.9 2 79

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Configurations 3
Inventory Type RESIDENTIAL
  • Block
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4.5 BHK 209.95 Villa 1
-1 4.5 BHK 195.76 Villa 2
-1 4.5 BHK 195.76 Villa 3
-1 4.5 BHK 195.76 Villa 4
-1 4.5 BHK 195.76 Villa 5
-1 4.5 BHK 187.05 Villa 6
-1 4.5 BHK 176.78 Villa 7
-1 4.5 BHK 247.17 Villa 8
-1 5.5 BHK 359.99 Villa 9
-1 4.5 BHK 201.06 Villa 10
-1 4.5 BHK 201.06 Villa 11
-1 4.5 BHK 201.06 Villa 12
-1 4.5 BHK 210.04 Villa 13
-1 4.5 BHK 221.45 Villa 14
-1 4.5 BHK 195.76 Villa 15
-1 4.5 BHK 195.76 Villa 16
-1 4.5 BHK 195.76 Villa 17
-1 5 BHK 314.3 Villa 18
-1 5 BHK 297.26 Villa 19
-1 4.5 BHK 201.06 Villa 20
-1 4.5 BHK 201.06 Villa 21
-1 4.5 BHK 201.06 Villa 22
-1 4.5 BHK 225.17 Villa 23
-1 4.5 BHK 232.39 Villa 24
-1 4.5 BHK 208.21 Villa 25
-1 4.5 BHK 208.21 Villa 26
-1 4.5 BHK 208.21 Villa 27
-1 4.5 BHK 282.94 Villa 28
-1 4.5 BHK 263.87 Villa 29
-1 4.5 BHK 217.41 Villa 30
-1 4.5 BHK 217.41 Villa 31
-1 4.5 BHK 217.41 Villa 32
-1 4.5 BHK 244.05 Villa 33
-1 4.5 BHK 263.08 Villa 34
-1 4.5 BHK 263.08 Villa 35
-1 4.5 BHK 288.63 Villa 36
-1 4.5 BHK 322.27 Villa 37
-1 4.5 BHK 321.64 Villa 38
-1 4.5 BHK 321.63 Villa 39
-1 4.5 BHK 298.7 Villa 40
-1 4.5 BHK 200.54 Villa 41
-1 4.5 BHK 199.07 Villa 42
-1 4.5 BHK 199.07 Villa 43
-1 4.5 BHK 199.07 Villa 44
-1 4.5 BHK 199.07 Villa 45
-1 4.5 BHK 199.07 Villa 46
-1 3 BHK 160.9 Villa 47
-1 5.5 BHK 288.02 Villa 48
-1 4.5 BHK 194.67 Villa 49
-1 4.5 BHK 194.67 Villa 50
-1 4.5 BHK 194.67 Villa 51
-1 4.5 BHK 194.67 Villa 52
-1 4.5 BHK 195.67 Villa 53
-1 4.5 BHK 240.09 Villa 54
-1 4.5 BHK 228.24 Villa 55
-1 4.5 BHK 228.24 Villa 56
-1 4.5 BHK 228.24 Villa 57
-1 4.5 BHK 228.24 Villa 58
-1 4.5 BHK 248.07 Villa 59
-1 4.5 BHK 189.86 Villa 60
-1 4.5 BHK 221.99 Villa 61
-1 4.5 BHK 221.99 Villa 62
-1 4.5 BHK 221.99 Villa 63
-1 4.5 BHK 221.99 Villa 64
-1 4.5 BHK 233.01 Villa 65
-1 4.5 BHK 253.78 Villa 66
-1 4.5 BHK 228.24 Villa 67
-1 4.5 BHK 228.24 Villa 68
-1 4.5 BHK 228.24 Villa 69
-1 5.5 BHK 333.74 Villa 70
-1 5.5 BHK 251.33 Villa 71
-1 4.5 BHK 221.99 Villa 72
-1 4.5 BHK 221.99 Villa 73
-1 4.5 BHK 221.99 Villa 74
-1 4.5 BHK 245.95 Villa 75
-1 3 BHK 163.21 Villa 76
-1 4 BHK 171.98 Villa 77
-1 4.5 BHK 207.17 Villa 78
-1 5.5 BHK 427.5 Villa 79
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Amenities Gym % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported Amenities Electricity % not reported Amenities Smart Home Automation % not reported
Amenities Cctv Surveillance % not reported Amenities Club House % not reported Amenities Community Hall % not reported
Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Max Global - Financials - 2024-25.Pdf
Fd 2 Max Global FY 2023-24-Signed.Pdf
Fd 3 Financials Signed FY 2022-2023.Pdf
Fd 4 Max Global - Financials - 2024-25.Pdf
Fd 5 Max Global FY 2023-24-Signed.Pdf
Fd 6 Financials Signed FY 2022-2023.Pdf
Fd 7 ITR FY 2024-25.Pdf
Fd 8 ITR FY 2023-24.Pdf
Fd 9 ITR FY 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Od 1 No Sales Declaration.Pdf
Od 2 Plan No 1 Of 9.Pdf
Od 3 Plan No 2 Of 9.Pdf
Od 4 Plan No 3 Of 9.Pdf
Od 5 Plan No 4 Of 9.Pdf
Od 6 Plan No 5 Of 9.Pdf
Od 7 Plan No 6 Of 9.Pdf
Od 8 Plan No 7 Of 9.Pdf
Od 9 Plan No 8 Of 9.Pdf
Od 10 Plan No 9 Of 9.Pdf
Od 11 Plan No 10 Of 10 - Site Plan Details.Pdf
Od 12 Divine Meadows Phase - II DP.Pdf
Od 13 Divine Meadows Phase-II DP Order.Pdf
Od 14 ABSTRACT ESTIMATE - DIVINE MEADOW PHASE 2.Pdf
Od 15 CDP Demarcation.Pdf
Od 16 Village Map Demarcation.Pdf
Od 17 STP Drawing - Divine Meadows Ph 2.Pdf
Od 18 Sale Deeds -94-2a.Pdf
Od 19 Tippani-Akarbandh Sy No 94-2A.Pdf
Od 20 Confirmation Deed-95-2-1924-16-17.Pdf
Od 21 SD-2282-14-15-95-2.Pdf
Od 22 SD-2283-14-15-95-2.Pdf
Od 23 GPA 10 Guntas MC Halli.Pdf
Od 24 Max Global Developers-Lakkanna-GPA.PDF
Od 25 ADLR Sketch - Old.Pdf
Od 26 Land Cost Calculation - DM2.Pdf
Od 27 MR Title Flow.Pdf
Od 28 MR Copies 95-2 5 6.Pdf
Ed 1 19-09-2026
Ed 2 19-09-2026
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001959890
IFSC HDFC0001993
Branch Address HSR Layout
Country/City