Natura Atavi RERA Details - PRM/KA/RERA/1251/308/PR/200123/005642 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Natura Atavi under registration PRM/KA/RERA/1251/308/PR/200123/005642 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/200123/005642
  • Project Name NATURA ATAVI II
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2030
  • Documents 90 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 19 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

CACHET PROJECTS LLP
Registered Address #2566, VIDAM, 13th cross, 27th Main,HSR Sector 1 ,Bengaluru South ,Bengaluru Urban-560102
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No.60/1, 62/1, 62/2, 62/5,62/7(old sy no.62/1), 63/1,63/2.63/4 situated at S Medahalli Village , Sarjapura Hobli, Anekal Taluk , Anekal , Bengaluru Urban, Karnataka - 562107

RERA Coordinates

Latitude, Longitude 12.8141955, 77.7847786
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC 295/21-22
Authority Local Planing Authority
Approved Date 29 July 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
NATURA ATAVI II 1 3 1 221 Residential 10.4 0 96

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
4 BHK 0 units
  • NATURA ATAVI II
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 224 1
-1 4 BHK 224 2
-1 4 BHK 224 3
-1 4 BHK 234 4
-1 4 BHK 234 5
-1 4 BHK 234 6
-1 4 BHK 234 7
-1 4 BHK 234 8
-1 4 BHK 234 9
-1 4 BHK 234 10
-1 4 BHK 234 11
-1 4 BHK 234 12
-1 4 BHK 234 13
-1 4 BHK 232 14
-1 4 BHK 232 15
-1 4 BHK 232 16
-1 4 BHK 232 17
-1 4 BHK 232 18
-1 4 BHK 232 19
-1 4 BHK 232 20
-1 4 BHK 232 21
-1 4 BHK 232 22
-1 4 BHK 232 23
-1 4 BHK 232 24
-1 4 BHK 232 25
-1 4 BHK 233 26
-1 4 BHK 233 27
-1 4 BHK 233 28
-1 4 BHK 224 29
-1 4 BHK 224 30
-1 4 BHK 224 31
-1 4 BHK 224 32
-1 4 BHK 233 33
-1 4 BHK 224 34
-1 4 BHK 224 35
-1 4 BHK 224 36
-1 4 BHK 224 37
-1 4 BHK 224 38
-1 4 BHK 224 39
-1 4 BHK 224 40
-1 4 BHK 224 41
-1 4 BHK 224 42
-1 4 BHK 200 43
-1 4 BHK 200 44
-1 4 BHK 200 45
-1 4 BHK 200 46
-1 4 BHK 200 47
-1 4 BHK 200 48
-1 4 BHK 200 49
-1 4 BHK 200 50
-1 4 BHK 200 51
-1 4 BHK 200 52
-1 4 BHK 201 53
-1 4 BHK 201 54
-1 4 BHK 201 55
-1 4 BHK 201 56
-1 4 BHK 201 57
-1 4 BHK 201 58
-1 4 BHK 201 59
-1 4 BHK 201 60
-1 4 BHK 201 61
-1 4 BHK 201 62
-1 4 BHK 243 63
-1 4 BHK 243 64
-1 4 BHK 243 65
-1 4 BHK 243 66
-1 4 BHK 243 67
-1 4 BHK 243 68
-1 4 BHK 243 69
-1 4 BHK 243 70
-1 4 BHK 243 71
-1 4 BHK 243 72
-1 4 BHK 243 73
-1 4 BHK 243 74
-1 4 BHK 201 75
-1 4 BHK 201 76
-1 4 BHK 201 77
-1 4 BHK 200 78
-1 4 BHK 200 79
-1 4 BHK 200 80
-1 4 BHK 232 81
-1 4 BHK 232 82
-1 4 BHK 232 83
-1 4 BHK 224 84
-1 4 BHK 224 85
-1 4 BHK 224 86
-1 4 BHK 224 87
-1 4 BHK 224 88
-1 4 BHK 232 89
-1 4 BHK 232 90
-1 4 BHK 232 91
-1 4 BHK 232 92
-1 4 BHK 224 93
-1 4 BHK 224 94
-1 4 BHK 224 95
-1 4 BHK 224 96
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS March 22.Pdf
Fd 2 BS March 21.Pdf
Fd 3 BS March 20.Pdf
Fd 4 P&L Mar 22.Pdf
Fd 5 P&L Mar 21.Pdf
Fd 6 P&L Mar 20.Pdf
Fd 7 Signed Financials Mar 22.Pdf
Fd 8 Signed Financials Mar 21 Compressed.Pdf
Fd 9 Signed Financials Mar 20 Compressed (1).Pdf
Fd 10 Signed Financials Mar 22 Compressed (2).Pdf
Fd 11 Signed Financials Mar 21 Compressed.Pdf
Fd 12 Signed Financials Mar 20 Compressed (1).Pdf
Fd 13 Audit Report March 22 (2).Pdf
Fd 14 Audit Report March 21 (2).Pdf
Fd 15 Signed Financials Mar 20 Compressed (1).Pdf
Fd 16 ITR V March 22.Pdf
Fd 17 ITR V March 21.Pdf
Fd 18 ITR V March 20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 ATAVI PHASE 2 BROCHURE 02 Compressed.Pdf
Ed 1 30-12-2022
Ed 2 30-12-2022
Ed 3 30-12-2022
Ed 4 30-12-2022
Ed 5 30-12-2022
Ed 6 30-12-2022
Ed 7 30-12-2022
Ed 8 30-12-2022
Ed 9 30-12-2022
Ed 10 30-12-2022
Ed 11 30-12-2022
Ed 12 30-12-2022
Ed 13 30-12-2022
Ed 14 30-12-2022
Ed 15 17-01-2023
Ed 16 17-01-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank INDUSIND BANK
Account Number (RERA) 251213141709
IFSC INDB0000008
Branch Address MG Road, Bengaluru