RRL Palm Altezze RERA Details - PRM/KA/RERA/1251/308/PR/141025/008167 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for RRL Palm Altezze under registration PRM/KA/RERA/1251/308/PR/141025/008167 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/141025/008167
  • Project Name RRL PALM ALTEZZE
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 September 2030
  • Documents 62 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 10 September 2025 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2030 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

RRL BUILDERS AND DEVELOPERS PRIVATE LIMITED
Registered Address RRL Towers, 4th Floor, Sompura Gate,Sarjapura Road, Anekal ,Bengaluru East ,Bengaluru Urban-562125
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Property bearing Converted Survey No. 73/6 (Old Survey No.73/5), E -Khatha No.150200101600120805 , Janthagondanahalli Village, Sarjapura Hobli, Anekal Taluk , Anekal , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.92579, 77.782864
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/241/2025-26
Authority Anekal Planning Authority
Approved Date 18 August 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
RRL PALM ALTEZZE 1 24 0 127 Residential 75.6 23 115

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • RRL PALM ALTEZZE
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 71.53 101
GF 3 BHK 89.84 102
GF 3 BHK 99.78 103
GF 3 BHK 91.42 104
GF 3 BHK 87.79 105
1 2 BHK 71.53 201
1 3 BHK 89.84 202
1 3 BHK 99.78 203
1 3 BHK 91.42 204
1 3 BHK 87.79 205
2 2 BHK 71.53 301
2 3 BHK 89.84 302
2 3 BHK 99.78 303
2 3 BHK 91.42 304
2 3 BHK 87.79 305
3 2 BHK 71.53 401
3 3 BHK 89.84 402
3 3 BHK 99.78 403
3 3 BHK 91.42 404
3 3 BHK 87.79 405
4 2 BHK 71.53 501
4 3 BHK 89.84 502
4 3 BHK 99.78 503
4 3 BHK 91.42 504
4 3 BHK 87.79 505
5 2 BHK 71.53 601
5 3 BHK 89.84 602
5 3 BHK 99.78 603
5 3 BHK 91.42 604
5 3 BHK 87.79 605
6 2 BHK 71.53 701
6 3 BHK 89.84 702
6 3 BHK 99.78 703
6 3 BHK 91.42 704
6 3 BHK 87.79 705
7 2 BHK 71.53 801
7 3 BHK 89.84 802
7 3 BHK 99.78 803
7 3 BHK 91.42 804
7 3 BHK 87.79 805
8 2 BHK 71.53 901
8 3 BHK 89.84 902
8 3 BHK 99.78 903
8 3 BHK 91.42 904
8 3 BHK 87.79 905
9 2 BHK 71.53 1001
9 3 BHK 89.84 1002
9 3 BHK 99.78 1003
9 3 BHK 91.42 1004
9 3 BHK 87.79 1005
10 2 BHK 71.53 1101
10 3 BHK 89.84 1102
10 3 BHK 99.78 1103
10 3 BHK 91.42 1104
10 3 BHK 87.79 1105
11 2 BHK 71.53 1201
11 3 BHK 89.84 1202
11 3 BHK 99.78 1203
11 3 BHK 91.42 1204
11 3 BHK 87.79 1205
12 2 BHK 71.53 1301
12 3 BHK 89.84 1302
12 3 BHK 99.78 1303
12 3 BHK 91.42 1304
12 3 BHK 87.79 1305
13 2 BHK 71.53 1401
13 3 BHK 89.84 1402
13 3 BHK 99.78 1403
13 3 BHK 91.42 1404
13 3 BHK 87.79 1405
14 2 BHK 71.53 1501
14 3 BHK 89.84 1502
14 3 BHK 99.78 1503
14 3 BHK 91.42 1504
14 3 BHK 87.79 1505
15 2 BHK 71.53 1601
15 3 BHK 89.84 1602
15 3 BHK 99.78 1603
15 3 BHK 91.42 1604
15 3 BHK 87.79 1605
16 2 BHK 71.53 1701
16 3 BHK 89.84 1702
16 3 BHK 99.78 1703
16 3 BHK 91.42 1704
16 3 BHK 87.79 1705
17 2 BHK 71.53 1801
17 3 BHK 89.84 1802
17 3 BHK 99.78 1803
17 3 BHK 91.42 1804
17 3 BHK 87.79 1805
18 2 BHK 71.53 1901
18 3 BHK 89.84 1902
18 3 BHK 99.78 1903
18 3 BHK 91.42 1904
18 3 BHK 87.79 1905
19 2 BHK 71.53 2001
19 3 BHK 89.84 2002
19 3 BHK 99.78 2003
19 3 BHK 91.42 2004
19 3 BHK 87.79 2005
20 2 BHK 71.53 2101
20 3 BHK 89.84 2102
20 3 BHK 99.78 2103
20 3 BHK 91.42 2104
20 3 BHK 87.79 2105
21 2 BHK 71.53 2201
21 3 BHK 89.84 2202
21 3 BHK 99.78 2203
21 3 BHK 91.42 2204
21 3 BHK 87.79 2205
22 2 BHK 71.53 2301
22 3 BHK 89.84 2302
22 3 BHK 99.78 2303
22 3 BHK 91.42 2304
22 3 BHK 87.79 2305
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Financials FY-2023-24 Compressed.Pdf
Fd 2 Financials FY-2022-23.Pdf
Fd 3 Financials FY-2021-22.Pdf
Fd 4 Financials FY-2023-24 Compressed.Pdf
Fd 5 Financials FY-2022-23.Pdf
Fd 6 Financials FY-2021-22.Pdf
Fd 7 Financials FY-2023-24 Compressed.Pdf
Fd 8 ITR Acknowledgement FY-2022-23.Pdf
Fd 9 Financials FY-2021-22.Pdf
Fd 10 Financials FY-2023-24 Compressed.Pdf
Fd 11 Financials FY-2022-23.Pdf
Fd 12 Financials FY-2021-22.Pdf
Fd 13 Financials FY-2023-24 Compressed.Pdf
Fd 14 Financials FY-2022-23.Pdf
Fd 15 Financials FY-2021-22.Pdf
Fd 16 Financials FY-2023-24 Compressed.Pdf
Fd 17 Financials FY-2022-23.Pdf
Fd 18 Financials FY-2021-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Rectification Deed To JDA Sharing Agreement.Pdf
Od 2 Registered GPA Power Of Attorney.Pdf
Od 3 Change Of Land.Pdf
Od 4 Final Decree Doc No 8680.Pdf
Od 5 Site Plan.Pdf
Od 6 Basement Floor Plan.Pdf
Od 7 Ground Floor Plan.Pdf
Od 8 Village Map.Jpeg
Od 9 ESTIMATION Certified.Pdf
Od 10 COMMON Area DETAILS.Pdf
Od 11 Terrace Floor Plan Compressed.Pdf
Od 12 Single Plot Approval.Pdf
Ed 1 10-10-2025
Ed 2 10-10-2025
Ed 3 10-10-2025
Ed 4 10-10-2025
Ed 5 10-10-2025
Ed 6 10-10-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001802623
IFSC HDFC0009590
Branch Address SOMPURA
Country/City