Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

SSVR Niyaara RERA Details - PRM/KA/RERA/1251/446/PR/160224/006626 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for SSVR Niyaara under registration PRM/KA/RERA/1251/446/PR/160224/006626 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/160224/006626
  • Project Name SSVR NIYAARA
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2028
  • Documents 150 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 05 January 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SSVR BUILDERS
Registered Address 6/3,6/8,6/9,6/13,7/2 & 7/3 KHATA NO-932,SORAHUNSE VILLAGE VARTHUR HOBLI BANGALAGORE ,Bengaluru East ,Bengaluru Urban-560087
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY. 6/3 , 6/8 , 6/9 , 6/13 , 7/2 & 7/3 Katha No.932/7/2.6/13,7/3,7/2,6/3,6/9,6/8/32 , SORAHUNASE VILLAGE VARTHUR HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.9458107, 77.7541344
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDNORTH/0083/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 30 December 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
SSVR NIYAARA BLOCK-A 1 14 0 237 Residential 42.95 13 237
SSVR NIYAARA BLOCK-B 1 14 0 156 Residential 42.95 13 156

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • SSVR NIYAARA BLOCK-A
  • SSVR NIYAARA BLOCK-B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 71.65 A111
GF 2 BHK 74.00 A112
GF 2 BHK 71.59 A113
GF 2 BHK 69.66 A114
GF 3 BHK 93.57 A115
GF 3 BHK 95.18 A116
GF 2 BHK 68.37 A117
GF 2 BHK 68.65 A118
GF 2 BHK 74.40 A119
GF 3 BHK 85.20 A120
1 3 BHK 85.15 A201
1 3 BHK 69.66 A202
1 2 BHK 71.61 A203
1 2 BHK 74.44 A207
1 3 BHK 89.62 A208
1 3 BHK 95.21 A209
1 2 BHK 72.19 A210
1 2 BHK 71.65 A211
1 2 BHK 74.00 A212
1 2 BHK 71.59 A213
1 2 BHK 69.66 A214
1 3 BHK 93.57 A215
1 3 BHK 95.18 A216
1 2 BHK 68.37 A217
1 2 BHK 68.65 A218
1 2 BHK 74.40 A219
1 3 BHK 85.20 A220
2 3 BHK 85.15 A301
2 3 BHK 69.66 A302
2 2 BHK 71.61 A303
2 3 BHK 70.28 A304
2 2 BHK 84.89 A305
2 2 BHK 84.77 A306
2 2 BHK 74.44 A307
2 3 BHK 89.62 A308
2 3 BHK 95.21 A309
2 2 BHK 72.19 A310
2 2 BHK 71.65 A311
2 2 BHK 74.00 A312
2 2 BHK 71.59 A313
2 2 BHK 69.66 A314
2 3 BHK 93.57 A315
2 3 BHK 95.18 A316
2 2 BHK 68.37 A317
2 2 BHK 68.65 A318
2 2 BHK 74.40 A319
2 3 BHK 85.20 A320
3 3 BHK 85.15 A401
3 3 BHK 69.66 A402
3 2 BHK 71.61 A403
3 3 BHK 70.28 A404
3 2 BHK 84.89 A405
3 2 BHK 84.77 A406
3 2 BHK 74.44 A407
3 3 BHK 89.62 A408
3 3 BHK 95.21 A409
3 2 BHK 72.19 A410
3 2 BHK 71.65 A411
3 2 BHK 74.00 A412
3 2 BHK 71.59 A413
3 2 BHK 69.66 A414
3 3 BHK 93.57 A415
3 3 BHK 95.18 A416
3 2 BHK 68.37 A417
3 2 BHK 68.65 A418
3 2 BHK 74.40 A419
3 3 BHK 85.20 A420
4 3 BHK 85.15 A501
4 3 BHK 69.66 A502
4 2 BHK 71.61 A503
4 3 BHK 70.28 A504
4 2 BHK 84.89 A505
4 2 BHK 84.77 A506
4 2 BHK 74.44 A507
4 3 BHK 89.62 A508
4 3 BHK 95.21 A509
4 2 BHK 72.19 A510
4 2 BHK 71.65 A511
4 2 BHK 74.00 A512
4 2 BHK 71.59 A513
4 2 BHK 69.66 A514
4 3 BHK 93.57 A515
4 3 BHK 95.18 A516
4 2 BHK 68.37 A517
4 2 BHK 68.65 A518
4 2 BHK 74.40 A519
4 3 BHK 85.20 A520
5 3 BHK 85.15 A601
5 3 BHK 69.66 A602
5 2 BHK 71.61 A603
5 3 BHK 70.28 A604
5 2 BHK 84.89 A605
5 2 BHK 84.77 A606
5 2 BHK 74.44 A607
5 3 BHK 89.62 A608
5 3 BHK 95.21 A609
5 2 BHK 72.19 A610
5 2 BHK 71.65 A611
5 2 BHK 74.00 A612
5 2 BHK 71.59 A613
5 2 BHK 69.66 A614
5 3 BHK 93.57 A615
5 3 BHK 95.18 A616
5 2 BHK 68.37 A617
5 2 BHK 68.65 A618
5 2 BHK 74.40 A619
5 3 BHK 85.20 A620
6 3 BHK 85.15 A701
6 3 BHK 69.66 A702
6 2 BHK 71.61 A703
6 3 BHK 70.28 A704
6 2 BHK 84.89 A705
6 2 BHK 84.77 A706
6 2 BHK 74.44 A707
6 3 BHK 89.62 A708
6 3 BHK 95.21 A709
6 2 BHK 72.19 A710
6 2 BHK 71.65 A711
6 2 BHK 74.00 A712
6 2 BHK 71.59 A713
6 2 BHK 69.66 A714
6 3 BHK 93.57 A715
6 3 BHK 95.18 A716
6 2 BHK 68.37 A717
6 2 BHK 68.65 A718
6 2 BHK 74.40 A719
6 3 BHK 85.20 A720
7 3 BHK 85.15 A801
7 3 BHK 69.66 A802
7 2 BHK 71.61 A803
7 3 BHK 70.28 A804
7 2 BHK 84.89 A805
7 2 BHK 84.77 A806
7 2 BHK 74.44 A807
7 3 BHK 89.62 A808
7 3 BHK 95.21 A809
7 2 BHK 72.19 A810
7 2 BHK 71.65 A811
7 2 BHK 74.00 A812
7 2 BHK 71.59 A813
7 2 BHK 69.66 A814
7 3 BHK 93.57 A815
7 3 BHK 95.18 A816
7 2 BHK 68.37 A817
7 2 BHK 68.65 A818
7 2 BHK 74.40 A819
7 3 BHK 85.20 A820
8 3 BHK 85.15 A901
8 3 BHK 69.66 A902
8 2 BHK 71.61 A903
8 3 BHK 70.28 A904
8 2 BHK 84.89 A905
8 2 BHK 84.77 A906
8 2 BHK 74.44 A907
8 3 BHK 89.62 A908
8 3 BHK 95.21 A909
8 2 BHK 72.19 A910
8 2 BHK 71.65 A911
8 2 BHK 74.00 A912
8 2 BHK 71.59 A913
8 2 BHK 69.66 A914
8 3 BHK 93.57 A915
8 3 BHK 95.18 A916
8 2 BHK 68.37 A917
8 2 BHK 68.65 A918
8 2 BHK 74.40 A919
8 3 BHK 85.20 A920
9 3 BHK 85.15 A1001
9 3 BHK 69.66 A1002
9 2 BHK 71.61 A1003
9 3 BHK 70.28 A1004
9 2 BHK 84.89 A1005
9 2 BHK 84.77 A1006
9 2 BHK 74.44 A1007
9 3 BHK 89.62 A1008
9 3 BHK 95.21 A1009
9 2 BHK 72.19 A1010
9 2 BHK 71.65 A1011
9 2 BHK 74.00 A1012
9 2 BHK 71.59 A1013
9 2 BHK 69.66 A1014
9 3 BHK 93.57 A1015
9 3 BHK 95.18 A1016
9 2 BHK 68.37 A1017
9 2 BHK 68.65 A1018
9 2 BHK 74.40 A1019
9 3 BHK 85.20 A1020
10 3 BHK 85.15 A1101
10 3 BHK 69.66 A1102
10 2 BHK 71.61 A1103
10 3 BHK 70.28 A1104
10 2 BHK 84.89 A1105
10 2 BHK 84.77 A1106
10 2 BHK 74.44 A1107
10 3 BHK 89.62 A1108
10 3 BHK 95.21 A1109
10 2 BHK 72.19 A1110
10 2 BHK 71.65 A1111
10 2 BHK 74.00 A1112
10 2 BHK 71.59 A1113
10 2 BHK 69.66 A1114
10 3 BHK 93.57 A1115
10 3 BHK 95.18 A1116
10 2 BHK 68.37 A1117
10 2 BHK 68.65 A1118
10 2 BHK 74.40 A1119
10 3 BHK 85.20 A1120
11 3 BHK 85.15 A1201
11 3 BHK 69.66 A1202
11 2 BHK 71.61 A1203
11 3 BHK 70.28 A1204
11 2 BHK 84.89 A1205
11 2 BHK 84.77 A1206
11 2 BHK 74.44 A1207
11 3 BHK 89.62 A1208
11 3 BHK 95.21 A1209
11 2 BHK 72.19 A1210
11 2 BHK 71.65 A1211
11 2 BHK 74.00 A1212
11 2 BHK 71.59 A1213
11 2 BHK 69.66 A1214
11 3 BHK 93.57 A1215
11 3 BHK 95.18 A1216
11 2 BHK 68.37 A1217
11 2 BHK 68.65 A1218
11 2 BHK 74.40 A1219
11 3 BHK 85.20 A1220
12 2 BHK 71.65 A1311
12 2 BHK 74.00 A1312
12 2 BHK 71.59 A1313
12 2 BHK 69.66 A1314
12 3 BHK 93.57 A1315
12 3 BHK 95.18 A1316
12 2 BHK 68.37 A1317
12 2 BHK 68.65 A1318
12 2 BHK 74.40 A1319
12 3 BHK 85.20 A1320
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 2022-23.Pdf
Fd 2 Financials 2021-22.Pdf
Fd 3 Financials 2020-21.Pdf
Fd 4 Profit And Loss 2022-23.Pdf
Fd 5 Financials 2021-22.Pdf
Fd 6 Financials 2020-21.Pdf
Fd 7 RERA-NA.Pdf
Fd 8 RERA-NA.Pdf
Fd 9 RERA-NA.Pdf
Fd 10 RERA-NA.Pdf
Fd 11 RERA-NA.Pdf
Fd 12 RERA-NA.Pdf
Fd 13 RERA-NA.Pdf
Fd 14 Audit Report 2021-22.Pdf
Fd 15 Audit Report 2020-21.Pdf
Fd 16 ITR ACK202223 SSVR BUILDERS.Pdf
Fd 17 ITR ACK202122 SSVR BUILDERS.Pdf
Fd 18 ITR Ack 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Guideline Value-SSVR Niyaara.Pdf
Od 2 AIRPORTS AUTHORITY OF INDIA.Pdf
Od 3 AREA SHARING AGREEMENT.Pdf
Od 4 Fire Noc.Pdf
Od 5 HAL.Pdf
Od 6 KSRSAC INVOICE.Pdf
Od 7 SINGLE LAYOUT PLAN.Pdf
Od 8 SUPPLEMENTARY PARTNERSHIP DEED.Pdf
Od 9 Release Deed-6848 Sy 7 2022-23.Pdf
Od 10 JDA-7317 7 2 28 Guntas 2022-23.Pdf
Od 11 GPA 339 2022 23 Sy 7 2 28 Guntas.Pdf
Od 12 GPA 325 202223 Sy 7 3 9 Guntas.Pdf
Od 13 JDA 6856 -7 3 09 Guntas.Pdf
Od 14 Carpet Area-Signed.Pdf
Od 15 MR 19-Sy 6.Pdf
Od 16 MR H23 Sy 7.Pdf
Od 17 MR H39.Pdf
Od 18 BBMP Sy 7 2 Khata 1.Pdf
Od 19 BBMP Sy 7 2 Khata 17 10 2022.Pdf
Od 20 Khata 6 13 06 Guntas.Pdf
Od 21 Property Tax Sy 6 13 2022-23.Pdf
Od 22 Sy 7 2 Improvement Receipt Khata & Property Tax 2022-23 1.Pdf
Od 23 Sy 7 2 Improvement Receipt Khata & Property Tax 2022-23.Pdf
Od 24 Sy 7 3 Improvement Receipt Khata & Property Tax 2022-23.Pdf
Od 25 RTC Sy 7.Pdf
Od 26 RTC- Sy No 6.Pdf
Od 27 Land Cost Calculation Sheet.Pdf
Od 28 VILLAGE MAP.Pdf
Od 29 Sy 7 Mulatippani & Akarbandh.Pdf
Od 30 Survey Sketch.Pdf
Od 31 EC SY NO 6-4.Pdf
Od 32 EC.Pdf
Od 33 SSVR Builders-GST Certificate.Pdf
Od 34 SPECIFICATIONS.Pdf
Ed 1 05-02-2024
Ed 2 05-02-2024
Ed 3 05-02-2024
Ed 4 05-02-2024
Ed 5 05-02-2024
Ed 6 05-02-2024
Ed 7 05-02-2024
Ed 8 05-02-2024
Ed 9 05-02-2024
Ed 10 05-02-2024
Ed 11 05-02-2024
Ed 12 05-02-2024
Ed 13 05-02-2024
Ed 14 05-02-2024
Ed 15 05-02-2024
Ed 16 05-02-2024
Ed 17 05-02-2024
Ed 18 05-02-2024
Ed 19 05-02-2024
Ed 20 05-02-2024
Ed 21 05-02-2024
Ed 22 05-02-2024
Ed 23 05-02-2024
Ed 24 05-02-2024
Ed 25 05-02-2024
Ed 26 05-02-2024
Ed 27 05-02-2024
Ed 28 05-02-2024
Ed 29 05-02-2024
Ed 30 05-02-2024
Ed 31 05-02-2024
Ed 32 05-02-2024
Ed 33 05-02-2024
Ed 34 05-02-2024
Ed 35 05-02-2024
Ed 36 05-02-2024
Ed 37 05-02-2024
Ed 38 05-02-2024
Ed 39 05-02-2024
Ed 40 05-02-2024
Ed 41 15-02-2024
Ed 42 15-02-2024
Ed 43 15-02-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 924020002471614
IFSC UTIB0002928
Branch Address PANTHUR BNGR
Country/City