residential Under Construction Source: rera.ka

TVS Emerald Jardin RERA Details - PRM/KA/RERA/1251/310/PR/160522/004884 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for TVS Emerald Jardin under registration PRM/KA/RERA/1251/310/PR/160522/004884 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/160522/004884
  • Project Name TVS Emerald Jardin
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 July 2027
  • Documents 81 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 15 June 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Emerald Haven Development Limited
Registered Address No. 383, III Block, KORAMANGALA EXTENSION,BENGALURU ,Bengaluru South ,Bengaluru Urban-560034
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No in 117/1 OF SINGASANDRA VILLAGE AND Sy No in 63/2, 63/3, 63/4, 63/5, 63/6 OF BASAPURA VILLAGE , BEGUR HOBLI, BANGALORE SOUTH TALUK , Bengaluru South , Bengaluru Urban, Karnataka - 560068

RERA Coordinates

Latitude, Longitude 12.871281, 77.643297
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. PRJ/12002/21-22IN
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 21 April 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block-A 1 19 1 160 Residential 58.5 18 160
Block-B 1 19 1 139 Residential 58.5 18 139
Block-C 1 19 1 140 Residential 58.5 18 140
Block-D 1 19 1 142 Residential 58.5 18 142

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • Block-A
  • Block-B
  • Block-C
  • Block-D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3BHK 3T 89.02 A101
GF 3BHK 3T 89.02 A102
GF 1BHK 1T 45.01 A103
GF 1BHK 1T 45.01 A104
GF 3BHK 2T 77.46 A105
GF 3BHK 2T 77.46 A106
GF 1BHK 1T 36.93 A107
GF 1BHK 1T 35.89 A108
GF 1BHK 1T 35.89 A109
1 3BHK 3T 89.02 A201
1 3BHK 3T 89.02 A202
1 2BHK 2T 57.36 A203
1 2BHK 2T 57.36 A204
1 3BHK 2T 77.46 A205
1 3BHK 2T 77.46 A206
1 1BHK 1T 36.93 A207
1 1BHK 1T 35.89 A208
1 1BHK 1T 35.89 A209
2 3BHK 3T 89.02 A301
2 3BHK 3T 89.02 A302
2 2BHK 2T 57.36 A303
2 2BHK 2T 57.36 A304
2 3BHK 2T 77.46 A305
2 3BHK 2T 77.46 A306
2 1BHK 1T 36.93 A307
2 1BHK 1T 35.89 A308
2 1BHK 1T 35.89 A309
3 3BHK 3T 89.02 A401
3 3BHK 3T 89.02 A402
3 2BHK 2T 57.36 A403
3 2BHK 2T 57.36 A404
3 3BHK 2T 77.46 A405
3 3BHK 2T 77.46 A406
3 1BHK 1T 36.93 A407
3 1BHK 1T 35.89 A408
3 1BHK 1T 35.89 A409
4 3BHK 3T 89.02 A501
4 3BHK 3T 89.02 A502
4 2BHK 2T 57.36 A503
4 2BHK 2T 57.36 A504
4 3BHK 2T 77.46 A505
4 3BHK 2T 77.46 A506
4 1BHK 1T 36.93 A507
4 1BHK 1T 35.89 A508
4 1BHK 1T 35.89 A509
5 3BHK 3T 89.02 A601
5 3BHK 3T 89.02 A602
5 2BHK 2T 57.36 A603
5 2BHK 2T 57.36 A604
5 3BHK 2T 77.46 A605
5 3BHK 2T 77.46 A606
5 1BHK 1T 36.93 A607
5 1BHK 1T 35.89 A608
5 1BHK 1T 35.89 A609
6 3BHK 3T 89.02 A701
6 3BHK 3T 89.02 A702
6 2BHK 2T 57.36 A703
6 2BHK 2T 57.36 A704
6 3BHK 2T 77.46 A705
6 3BHK 2T 77.46 A706
6 1BHK 1T 36.93 A707
6 1BHK 1T 35.89 A708
6 1BHK 1T 35.89 A709
7 3BHK 3T 89.02 A801
7 3BHK 3T 89.02 A802
7 2BHK 2T 57.36 A803
7 2BHK 2T 57.36 A804
7 3BHK 2T 77.46 A805
7 3BHK 2T 77.46 A806
7 1BHK 1T 36.93 A807
7 1BHK 1T 35.89 A808
7 1BHK 1T 35.89 A809
8 3BHK 3T 89.02 A901
8 3BHK 3T 89.02 A902
8 2BHK 2T 57.36 A903
8 2BHK 2T 57.36 A904
8 3BHK 2T 77.46 A905
8 3BHK 2T 77.46 A906
8 1BHK 1T 36.93 A907
8 1BHK 1T 35.89 A908
8 1BHK 1T 35.89 A909
9 3BHK 3T 89.02 A1001
9 3BHK 3T 89.02 A1002
9 2BHK 2T 57.36 A1003
9 2BHK 2T 57.36 A1004
9 3BHK 2T 77.46 A1005
9 3BHK 2T 77.46 A1006
9 1BHK 1T 36.93 A1007
9 1BHK 1T 35.89 A1008
9 1BHK 1T 35.89 A1009
10 3BHK 3T 89.02 A1101
10 3BHK 3T 89.02 A1102
10 2BHK 2T 57.36 A1103
10 2BHK 2T 57.36 A1104
10 3BHK 2T 77.46 A1105
10 3BHK 2T 77.46 A1106
10 1BHK 1T 36.93 A1107
10 1BHK 1T 35.89 A1108
10 1BHK 1T 35.89 A1109
11 3BHK 3T 89.02 A1201
11 3BHK 3T 89.02 A1202
11 2BHK 2T 57.36 A1203
11 2BHK 2T 57.36 A1204
11 3BHK 2T 77.46 A1205
11 3BHK 2T 77.46 A1206
11 1BHK 1T 36.93 A1207
11 1BHK 1T 35.89 A1208
11 1BHK 1T 35.89 A1209
12 3BHK 3T 89.02 A1301
12 3BHK 3T 89.02 A1302
12 2BHK 2T 57.36 A1303
12 2BHK 2T 57.36 A1304
12 3BHK 2T 77.46 A1305
12 3BHK 2T 77.46 A1306
12 1BHK 1T 36.93 A1307
12 1BHK 1T 35.89 A1308
12 1BHK 1T 35.89 A1309
13 3BHK 3T 89.02 A1401
13 3BHK 3T 89.02 A1402
13 2BHK 2T 57.36 A1403
13 2BHK 2T 57.36 A1404
13 3BHK 2T 77.46 A1405
13 3BHK 2T 77.46 A1406
13 1BHK 1T 36.93 A1407
13 1BHK 1T 35.89 A1408
13 1BHK 1T 35.89 A1409
14 3BHK 3T 89.02 A1501
14 3BHK 3T 89.02 A1502
14 2BHK 2T 57.36 A1503
14 2BHK 2T 57.36 A1504
14 3BHK 2T 77.46 A1505
14 3BHK 2T 77.46 A1506
14 1BHK 1T 36.93 A1507
14 1BHK 1T 35.89 A1508
14 1BHK 1T 35.89 A1509
15 3BHK 3T 89.02 A1601
15 3BHK 3T 89.02 A1602
15 2BHK 2T 57.36 A1603
15 2BHK 2T 57.36 A1604
15 3BHK 2T 77.46 A1605
15 3BHK 2T 77.46 A1606
15 1BHK 1T 36.93 A1607
15 1BHK 1T 35.89 A1608
15 1BHK 1T 35.89 A1609
16 3BHK 3T 89.02 A1701
16 3BHK 3T 89.02 A1702
16 2BHK 2T 57.36 A1703
16 2BHK 2T 57.36 A1704
16 3BHK 2T 77.46 A1705
16 3BHK 2T 77.46 A1706
16 1BHK 1T 36.93 A1707
16 1BHK 1T 35.89 A1708
16 1BHK 1T 35.89 A1709
17 3BHK 3T 89.02 A1801
17 3BHK 3T 89.02 A1802
17 2BHK 2T 57.36 A1803
17 2BHK 2T 57.36 A1804
17 1BHK 1T 36.93 A1805
17 1BHK 1T 35.89 A1806
17 1BHK 1T 35.89 A1807
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Amenities Library % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported
Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported
Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported
Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported
Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported
External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported
External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported
External Infrastructure Street Lighting % not reported External Infrastructure Electricity Supply Transformer % not reported Amenities Electricity % not reported
Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported Amenities Club House % not reported
Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported
Amenities Swimming Pool % not reported Amenities Gym % not reported Amenities Parks % not reported
Amenities Power Backup % not reported Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported
Amenities Air Conditioning % not reported Amenities Palm Court % not reported Amenities Miyawaki Forest % not reported
Amenities Vibgyor Colored Planting % not reported Amenities School Bus Bay % not reported Amenities Visitors Car Parking With Electric Car Charging Points % not reported
Amenities Drop Off Plaza % not reported Amenities Outdoor Gym % not reported Amenities Elder's Seating % not reported
Amenities Trampoline Park % not reported Amenities Children's Play Area % not reported Amenities Tree Court % not reported
Amenities Multipurpose Lawn - Yoga, Meditation / Gathering % not reported Amenities Skating Rink % not reported Amenities Totlot Play % not reported
Amenities Climbing Wall % not reported Amenities Reflexology Pathway % not reported Amenities Amphitheatre % not reported
Amenities Kid's Pool % not reported Amenities Water Body With Jets % not reported Amenities Wifi Zone % not reported
Amenities Urns With Seating % not reported Amenities Private Gardens % not reported Amenities Stepping Stones % not reported
Amenities Lawn Seating % not reported Amenities Giant Chess % not reported Amenities Dry Garden % not reported
Amenities Pet Park % not reported Amenities Feature Wall % not reported Amenities Ground Cover With Stepping Stones % not reported
Amenities Cycling Track % not reported Amenities Bicycle Stand % not reported Amenities Sculpture Court % not reported
Amenities Vegetable Garden % not reported Amenities Pergola With Seater % not reported Amenities Seating Space % not reported
Amenities Lobby % not reported Amenities Party Hall % not reported Amenities Yoga / Aerobics % not reported
Amenities Badminton/ Half-basket Ball % not reported Amenities Courtyard % not reported Amenities Health Club (F) % not reported
Amenities Health Club (M) % not reported Amenities Business Lounge % not reported Amenities Co-working Space % not reported
Amenities Association Room % not reported Amenities Multipurpose Open Court (Tennis/ Volleyball) % not reported Amenities Outdoor Workstation % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 2020-21.Pdf
Fd 2 Balance Sheet 2019-20.Pdf
Fd 3 Balance Sheet 2018-19.Pdf
Fd 4 Profit And Loss 2020-21.Pdf
Fd 5 Profit And Loss 2019-20.Pdf
Fd 6 Profit And Loss 2018-19.Pdf
Fd 7 Directors Report 2020-21.Pdf
Fd 8 Director Report 2019-20.Pdf
Fd 9 Director Report 2018-19.Pdf
Fd 10 Cash Flow 2020-21.Pdf
Fd 11 Cash Flow 2019-20.Pdf
Fd 12 Cash Flow 2018-19.Pdf
Fd 13 Independent Auditors Report 2020-21.Pdf
Fd 14 Auditors Report 2019-20.Pdf
Fd 15 Auditors Report 2018-19.Pdf
Fd 16 IT Return 2020-21.Pdf
Fd 17 IT Return 2019-20.Pdf
Fd 18 IT Return 2018-19.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 NOC PCB(Polution Control Board) CFE(Consent For Establishment)-Emerald.Pdf
Od 2 NOC SEIAA With Fee Receipt.Pdf
Od 3 NOC Forest.Pdf
Od 4 STP DEMARK-GROUND FLOOR.Pdf
Od 5 STP Descriptions.Pdf
Od 6 Location And Demarcation Drawing.Pdf
Od 7 Singasandra-CDP.Pdf
Od 8 Title Deed 117-1.Pdf
Od 9 Title Deed 63.Pdf
Od 10 Village Map - Basapura.PDF
Od 11 Village Map - Singasandra.PDF
Od 12 Survey Sketch-Singasandra.Pdf
Od 13 Mortgage Deed.Pdf
Od 14 NOC Fire With Fee Receipt.Pdf
Od 15 Guidance Value.Pdf
Od 16 BDA Work Order 17-02-2022.Pdf
Od 17 BDA & BBMP Plan.Pdf
Od 18 ADLR Sketch.PDF
Od 19 NOC HAL.Pdf
Od 20 Project Photos.Pdf
Od 21 BESCOM NOC With Affidavit.Pdf
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500000925640
IFSC HDFC0000523
Branch Address BENGALURU - RICHMOND ROAD
Country/City