Adarsh Welkin Park RERA Details - PRM/KA/RERA/1251/308/PR/020923/006223 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Adarsh Welkin Park under registration PRM/KA/RERA/1251/308/PR/020923/006223 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/020923/006223
  • Project Name Adarsh Welkin Park Phase 1
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2027
  • Documents 104 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Akarshak Realty Private Limited
Registered Address # 2/4, Langford Gardens,Richmond Town,Bengaluru ,Bengaluru South ,Bengaluru Urban-560025
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.no.196 , 197 , 198 , 199 , 203(P) & 204 , Gattahalli Village , Anekal , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.868634770732537, 77.68724709749222
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022
Authority BDA - Bangalore Development Authority
Approved Date 23 March 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block 2 2 26 0 312 Residential 68.45 25 312
Block 5 2 26 0 520 Residential 68.45 25 520

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • Block 2
  • Block 5
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 115.71 A-001
-1 3 BHK 117.03 A-002
-1 3 BHK 115.71 A-003
-1 3 BHK 110.69 A-004
-1 3 BHK 115.71 B-001
-1 3 BHK 117.03 B-002
-1 3 BHK 115.71 B-003
-1 3 BHK 110.69 B-004
-1 3 BHK 115.71 C-001
-1 3 BHK 117.03 C-002
-1 3 BHK 115.71 C-003
-1 3 BHK 110.69 C-004
GF 3 BHK 115.71 A-101
GF 3 BHK 117.03 A-102
GF 3 BHK 115.71 A-103
GF 3 BHK 110.69 A-104
GF 3 BHK 115.71 B-101
GF 3 BHK 117.03 B-102
GF 3 BHK 115.71 B-103
GF 3 BHK 110.69 B-104
GF 3 BHK 115.71 C-101
GF 3 BHK 117.03 C-102
GF 3 BHK 115.71 C-103
GF 3 BHK 110.69 C-104
1 3 BHK 115.71 A-201
1 3 BHK 117.03 A-202
1 3 BHK 115.71 A-203
1 3 BHK 110.69 A-204
1 3 BHK 115.71 B-201
1 3 BHK 117.03 B-202
1 3 BHK 115.71 B-203
1 3 BHK 110.69 B-204
1 3 BHK 115.71 C-201
1 3 BHK 117.03 C-202
1 3 BHK 115.71 C-203
1 3 BHK 110.69 C-204
2 3 BHK 115.71 A-301
2 3 BHK 117.03 A-302
2 3 BHK 115.71 A-303
2 3 BHK 110.69 A-304
2 3 BHK 115.71 B-301
2 3 BHK 117.03 B-302
2 3 BHK 115.71 B-303
2 3 BHK 110.69 B-304
2 3 BHK 115.71 C-301
2 3 BHK 117.03 C-302
2 3 BHK 115.71 C-303
2 3 BHK 110.69 C-304
3 3 BHK 115.71 A-401
3 3 BHK 117.03 A-402
3 3 BHK 115.71 A-403
3 3 BHK 110.69 A-404
3 3 BHK 115.71 B-401
3 3 BHK 117.03 B-402
3 3 BHK 115.71 B-403
3 3 BHK 110.69 B-404
3 3 BHK 115.71 C-401
3 3 BHK 117.03 C-402
3 3 BHK 115.71 C-403
3 3 BHK 110.69 C-404
4 3 BHK 115.71 A-501
4 3 BHK 117.03 A-502
4 3 BHK 115.71 A-503
4 3 BHK 110.69 A-504
4 3 BHK 115.71 B-501
4 3 BHK 117.03 B-502
4 3 BHK 115.71 B-503
4 3 BHK 110.69 B-504
4 3 BHK 115.71 C-501
4 3 BHK 117.03 C-502
4 3 BHK 115.71 C-503
4 3 BHK 110.69 C-504
5 3 BHK 115.71 A-601
5 3 BHK 117.03 A-602
5 3 BHK 115.71 A-603
5 3 BHK 110.69 A-604
5 3 BHK 115.71 B-601
5 3 BHK 117.03 B-602
5 3 BHK 115.71 B-603
5 3 BHK 110.69 B-604
5 3 BHK 115.71 C-601
5 3 BHK 117.03 C-602
5 3 BHK 115.71 C-603
5 3 BHK 110.69 C-604
6 3 BHK 115.71 A-701
6 3 BHK 117.03 A-702
6 3 BHK 115.71 A-703
6 3 BHK 110.69 A-704
6 3 BHK 115.71 B-701
6 3 BHK 117.03 B-702
6 3 BHK 115.71 B-703
6 3 BHK 110.69 B-704
6 3 BHK 115.71 C-701
6 3 BHK 117.03 C-702
6 3 BHK 115.71 C-703
6 3 BHK 110.69 C-704
7 3 BHK 115.71 A-801
7 3 BHK 117.03 A-802
7 3 BHK 115.71 A-803
7 3 BHK 110.69 A-804
7 3 BHK 115.71 B-801
7 3 BHK 117.03 B-802
7 3 BHK 115.71 B-803
7 3 BHK 110.69 B-804
7 3 BHK 115.71 C-801
7 3 BHK 117.03 C-802
7 3 BHK 115.71 C-803
7 3 BHK 110.69 C-804
8 3 BHK 115.71 A-901
8 3 BHK 117.03 A-902
8 3 BHK 115.71 A-903
8 3 BHK 110.69 A-904
8 3 BHK 115.71 B-901
8 3 BHK 117.03 B-902
8 3 BHK 115.71 B-903
8 3 BHK 110.69 B-904
8 3 BHK 115.71 C-901
8 3 BHK 117.03 C-902
8 3 BHK 115.71 C-903
8 3 BHK 110.69 C-904
9 3 BHK 115.71 A-1001
9 3 BHK 117.03 A-1002
9 3 BHK 115.71 A-1003
9 3 BHK 110.69 A-1004
9 3 BHK 115.71 B-1001
9 3 BHK 117.03 B-1002
9 3 BHK 115.71 B-1003
9 3 BHK 110.69 B-1004
9 3 BHK 115.71 C-1001
9 3 BHK 117.03 C-1002
9 3 BHK 115.71 C-1003
9 3 BHK 110.69 C-1004
10 3 BHK 115.71 A-1101
10 3 BHK 117.03 A-1102
10 3 BHK 115.71 A-1103
10 3 BHK 110.69 A-1104
10 3 BHK 115.71 B-1101
10 3 BHK 117.03 B-1102
10 3 BHK 115.71 B-1103
10 3 BHK 110.69 B-1104
10 3 BHK 115.71 C-1101
10 3 BHK 117.03 C-1102
10 3 BHK 115.71 C-1103
10 3 BHK 110.69 C-1104
11 3 BHK 115.71 A-1201
11 3 BHK 117.03 A-1202
11 3 BHK 115.71 A-1203
11 3 BHK 110.69 A-1204
11 3 BHK 115.71 B-1201
11 3 BHK 117.03 B-1202
11 3 BHK 115.71 B-1203
11 3 BHK 110.69 B-1204
11 3 BHK 115.71 C-1201
11 3 BHK 117.03 C-1202
11 3 BHK 115.71 C-1203
11 3 BHK 110.69 C-1204
12 3 BHK 115.71 A-1301
12 3 BHK 117.03 A-1302
12 3 BHK 115.71 A-1303
12 3 BHK 110.69 A-1304
12 3 BHK 115.71 B-1301
12 3 BHK 117.03 B-1302
12 3 BHK 115.71 B-1303
12 3 BHK 110.69 B-1304
12 3 BHK 115.71 C-1301
12 3 BHK 117.03 C-1302
12 3 BHK 115.71 C-1303
12 3 BHK 110.69 C-1304
13 3 BHK 115.71 A-1401
13 3 BHK 117.03 A-1402
13 3 BHK 115.71 A-1403
13 3 BHK 110.69 A-1404
13 3 BHK 115.71 B-1401
13 3 BHK 117.03 B-1402
13 3 BHK 115.71 B-1403
13 3 BHK 110.69 B-1404
13 3 BHK 115.71 C-1401
13 3 BHK 117.03 C-1402
13 3 BHK 115.71 C-1403
13 3 BHK 110.69 C-1404
14 3 BHK 115.71 A-1501
14 3 BHK 117.03 A-1502
14 3 BHK 115.71 A-1503
14 3 BHK 110.69 A-1504
14 3 BHK 115.71 B-1501
14 3 BHK 117.03 B-1502
14 3 BHK 115.71 B-1503
14 3 BHK 110.69 B-1504
14 3 BHK 115.71 C-1501
14 3 BHK 117.03 C-1502
14 3 BHK 115.71 C-1503
14 3 BHK 110.69 C-1504
15 3 BHK 115.71 A-1601
15 3 BHK 117.03 A-1602
15 3 BHK 115.71 A-1603
15 3 BHK 110.69 A-1604
15 3 BHK 115.71 B-1601
15 3 BHK 117.03 B-1602
15 3 BHK 115.71 B-1603
15 3 BHK 110.69 B-1604
15 3 BHK 115.71 C-1601
15 3 BHK 117.03 C-1602
15 3 BHK 115.71 C-1603
15 3 BHK 110.69 C-1604
16 3 BHK 115.71 A-1701
16 3 BHK 117.03 A-1702
16 3 BHK 115.71 A-1703
16 3 BHK 110.69 A-1704
16 3 BHK 115.71 B-1701
16 3 BHK 117.03 B-1702
16 3 BHK 115.71 B-1703
16 3 BHK 110.69 B-1704
16 3 BHK 115.71 C-1701
16 3 BHK 117.03 C-1702
16 3 BHK 115.71 C-1703
16 3 BHK 110.69 C-1704
17 3 BHK 115.71 A-1801
17 3 BHK 117.03 A-1802
17 3 BHK 115.71 A-1803
17 3 BHK 110.69 A-1804
17 3 BHK 115.71 B-1801
17 3 BHK 117.03 B-1802
17 3 BHK 115.71 B-1803
17 3 BHK 110.69 B-1804
17 3 BHK 115.71 C-1801
17 3 BHK 117.03 C-1802
17 3 BHK 115.71 C-1803
17 3 BHK 110.69 C-1804
18 3 BHK 115.71 A-1901
18 3 BHK 117.03 A-1902
18 3 BHK 115.71 A-1903
18 2 BHK 75.44 A-1904
18 3 BHK 115.71 B-1901
18 3 BHK 117.03 B-1902
18 3 BHK 115.71 B-1903
18 2 BHK 75.44 B-1904
18 3 BHK 115.71 C-1901
18 3 BHK 117.03 C-1902
18 3 BHK 115.71 C-1903
18 2 BHK 75.44 C-1904
19 3 BHK 115.71 A-2001
19 3 BHK 117.03 A-2002
19 3 BHK 115.71 A-2003
19 3 BHK 110.69 A-2004
19 3 BHK 115.71 B-2001
19 3 BHK 117.03 B-2002
19 3 BHK 115.71 B-2003
19 3 BHK 110.69 B-2004
19 3 BHK 115.71 C-2001
19 3 BHK 117.03 C-2002
19 3 BHK 115.71 C-2003
19 3 BHK 110.69 C-2004
20 3 BHK 115.71 A-2101
20 3 BHK 117.03 A-2102
20 3 BHK 115.71 A-2103
20 3 BHK 110.69 A-2104
20 3 BHK 115.71 B-2101
20 3 BHK 117.03 B-2102
20 3 BHK 115.71 B-2103
20 3 BHK 110.69 B-2104
20 3 BHK 115.71 C-2101
20 3 BHK 117.03 C-2102
20 3 BHK 115.71 C-2103
20 3 BHK 110.69 C-2104
21 3 BHK 115.71 A-2201
21 3 BHK 117.03 A-2202
21 3 BHK 115.71 A-2203
21 3 BHK 110.69 A-2204
21 3 BHK 115.71 B-2201
21 3 BHK 117.03 B-2202
21 3 BHK 115.71 B-2203
21 3 BHK 110.69 B-2204
21 3 BHK 115.71 C-2201
21 3 BHK 117.03 C-2202
21 3 BHK 115.71 C-2203
21 3 BHK 110.69 C-2204
22 3 BHK 115.71 A-2301
22 3 BHK 117.03 A-2302
22 3 BHK 115.71 A-2303
22 3 BHK 110.69 A-2304
22 3 BHK 115.71 B-2301
22 3 BHK 117.03 B-2302
22 3 BHK 115.71 B-2303
22 3 BHK 110.69 B-2304
22 3 BHK 115.71 C-2301
22 3 BHK 117.03 C-2302
22 3 BHK 115.71 C-2303
22 3 BHK 110.69 C-2304
23 3 BHK 115.71 A-2401
23 3 BHK 117.03 A-2402
23 3 BHK 115.71 A-2403
23 3 BHK 110.69 A-2404
23 3 BHK 115.71 B-2401
23 3 BHK 117.03 B-2402
23 3 BHK 115.71 B-2403
23 3 BHK 110.69 B-2404
23 3 BHK 115.71 C-2401
23 3 BHK 117.03 C-2402
23 3 BHK 115.71 C-2403
23 3 BHK 110.69 C-2404
24 3 BHK 115.71 A-2501
24 3 BHK 117.03 A-2502
24 3 BHK 115.71 A-2503
24 3 BHK 110.69 A-2504
24 3 BHK 115.71 B-2501
24 3 BHK 117.03 B-2502
24 3 BHK 115.71 B-2503
24 3 BHK 110.69 B-2504
24 3 BHK 115.71 C-2501
24 3 BHK 117.03 C-2502
24 3 BHK 115.71 C-2503
24 3 BHK 110.69 C-2504
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Not Available.PNG
Fd 2 BS 21-22.Pdf
Fd 3 BS 20-21.Pdf
Fd 4 Not Applicable.PNG
Fd 5 P&L 21-22.Pdf
Fd 6 P&L 21-22.Pdf
Fd 7 Not Applicable.PNG
Fd 8 AKKRPL BR-21-22.Pdf
Fd 9 AKKRPL BR 20-21 (DIRECTOR REPORT).Pdf
Fd 10 Not Applicable.PNG
Fd 11 Cash Flow 21-22.Pdf
Fd 12 Cash Flow 20-21.Pdf
Fd 13 Not Applicable.PNG
Fd 14 Supporting Doc.Pdf
Fd 15 Supporting Doc.Pdf
Fd 16 Not Applicable.PNG
Fd 17 AKKRPL ITR Ack FY 2021-22.Pdf
Fd 18 AKKRPL ITR Ack FY 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Auditors Report 21-22.Pdf
Od 2 Auditors Report 20-21.Pdf
Od 3 Adarsh Welkin Park Phase-1 Apartments Approved Specifications.Pdf
Od 4 Fire NOC.Pdf
Od 5 Ghattahalli 2 EC-SEIAA.Pdf
Od 6 BESCOM.Pdf
Od 7 AAI.Pdf
Od 8 Gattahalli-II Water NOC.Pdf
Od 9 Gattihalli 2 CFE.Pdf
Od 10 HAL Noc.Pdf
Od 11 CDP.Pdf
Od 12 Building Licence- 27-2021-22.Pdf
Od 13 Tax Paid Receipt- 2022-23 -Gattihalli.Pdf
Od 14 Sarojamma Sharing Agreement.Pdf
Od 15 Sharing Agreement Kanthamma.Pdf
Od 16 Sharing Agreement Vanitha Sreedhar.Pdf
Od 17 Shobha Sharing Agreement-1.Pdf
Od 18 GPA- 637-22-23, Sy No 23,203-1,204,221.Pdf
Od 19 Guideline Value- Gattihalli.Pdf
Od 20 GPA -Shobha, Sy No 23, 203-1 & 204 Srirampura.Pdf
Od 21 JDA -Shobha Sy No 23 203-1 & 204 Srirampura.Pdf
Od 22 Adarsh Welkin Park Apartments Phase-1 Area ( Demarcation).Pdf
Od 23 Village Map.Pdf
Od 24 Basement-1 Plan Compressed.Pdf
Od 25 Basement-2 Plan Compressed.Pdf
Od 26 Block-2 Plans Compressed.Pdf
Od 27 Block-5 Plans Compressed.Pdf
Od 28 Site Plan For Rera ADARSH WELKIN PARK PHASE1.Pdf
Od 29 Elevations Compressed.Pdf
Od 30 AFS-Final-Adarsh Welkin Park Apartments - RERA.Pdf
Ed 1 12-07-2023
Ed 2 12-07-2023
Ed 3 12-07-2023
Ed 4 12-07-2023
Ed 5 12-07-2023
Ed 6 12-07-2023
Ed 7 12-07-2023
Ed 8 12-07-2023
Ed 9 12-07-2023
Ed 10 12-07-2023
Ed 11 12-07-2023
Ed 12 12-07-2023
Ed 13 03-08-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705007569
IFSC ICIC0007429
Branch Address Residency road Branch, Bangalore
Country/City