Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Adarsh Tropica RERA Details - PRM/KA/RERA/1251/446/PR/010325/007535 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Adarsh Tropica under registration PRM/KA/RERA/1251/446/PR/010325/007535 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/010325/007535
  • Project Name Adarsh Tropica (Phase-2)
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 July 2029
  • Documents 163 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 December 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

ORCHIDS APARTMENTS PVT LTD
Registered Address 2/4 Langford Garden,Richmond Town,,Bengaluru South , ,Bengaluru South ,Bengaluru Urban-560025
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.No.37/4,37/5(37/3),56/4,56/5,56/6,65/1A1 (Part Sy.No) & 65/1B (Part Sy.No), CHIKKANAYAKANAHALLI VILLAGE, , VARTHUR HOBLI , BENGALURU EAST , Bengaluru East , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.88769444, 77.69127778
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/PS/EM/EO-1/TA-2/E/34/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 12 November 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block 3 (Wing-A,B,C & D) 1 14 0 208 Residential 42.5 13 208
Block 4 (Wing-A&B) 1 14 0 208 Residential 42.5 13 208
Block 5 (Wing-A&B) 1 14 0 104 Residential 42.5 13 104
Block 6 (Wing-A) 1 6 0 35 Residential 18.5 5 35
Block 7 (Wing-A) 1 6 0 35 Residential 18.5 5 35
Block 8 (Wing-A&B) 1 14 0 104 Residential 42.5 13 104

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
  • Block 3 (Wing-A,B,C & D)
  • Block 4 (Wing-A&B)
  • Block 5 (Wing-A&B)
  • Block 6 (Wing-A)
  • Block 7 (Wing-A)
  • Block 8 (Wing-A&B)
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2.5 BHK 82.82 A 101
GF 2.5 BHK 82.82 A 102
GF 2.5 BHK 82.82 A 103
GF 2.5 BHK 82.82 A 104
GF 2.5 BHK 82.82 B 101
GF 2.5 BHK 82.82 B 102
GF 2.5 BHK 82.82 B 103
GF 2.5 BHK 82.82 B 104
GF 2.5 BHK 82.82 C 101
GF 2.5 BHK 82.82 C 102
GF 2.5 BHK 82.82 C 103
GF 2.5 BHK 82.82 C 104
GF 2.5 BHK 82.82 D 101
GF 2.5 BHK 82.82 D 102
GF 2.5 BHK 82.82 D 103
GF 2.5 BHK 82.82 D 104
1 2.5 BHK 82.82 A 201
1 2.5 BHK 82.82 A 202
1 2.5 BHK 82.82 A 203
1 2.5 BHK 82.82 A 204
1 2.5 BHK 82.82 B 201
1 2.5 BHK 82.82 B 202
1 2.5 BHK 82.82 B 203
1 2.5 BHK 82.82 B 204
1 2.5 BHK 82.82 C 201
1 2.5 BHK 82.82 C 202
1 2.5 BHK 82.82 C 203
1 2.5 BHK 82.82 C 204
1 2.5 BHK 82.82 D 201
1 2.5 BHK 82.82 D 202
1 2.5 BHK 82.82 D 203
1 2.5 BHK 82.82 D 204
2 2.5 BHK 82.82 A 301
2 2.5 BHK 82.82 A 302
2 2.5 BHK 82.82 A 303
2 2.5 BHK 82.82 A 304
2 2.5 BHK 82.82 B 301
2 2.5 BHK 82.82 B 302
2 2.5 BHK 82.82 B 303
2 2.5 BHK 82.82 B 304
2 2.5 BHK 82.82 C 301
2 2.5 BHK 82.82 C 302
2 2.5 BHK 82.82 C 303
2 2.5 BHK 82.82 C 304
2 2.5 BHK 82.82 D 301
2 2.5 BHK 82.82 D 302
2 2.5 BHK 82.82 D 303
2 2.5 BHK 82.82 D 304
3 2.5 BHK 82.82 A 401
3 2.5 BHK 82.82 A 402
3 2.5 BHK 82.82 A 403
3 2.5 BHK 82.82 A 404
3 2.5 BHK 82.82 B 401
3 2.5 BHK 82.82 B 402
3 2.5 BHK 82.82 B 403
3 2.5 BHK 82.82 B 404
3 2.5 BHK 82.82 C 401
3 2.5 BHK 82.82 C 402
3 2.5 BHK 82.82 C 403
3 2.5 BHK 82.82 C 404
3 2.5 BHK 82.82 D 401
3 2.5 BHK 82.82 D 402
3 2.5 BHK 82.82 D 403
3 2.5 BHK 82.82 D 404
4 2.5 BHK 82.82 A 501
4 2.5 BHK 82.82 A 502
4 2.5 BHK 82.82 A 503
4 2.5 BHK 82.82 A 504
4 2.5 BHK 82.82 B 501
4 2.5 BHK 82.82 B 502
4 2.5 BHK 82.82 B 503
4 2.5 BHK 82.82 B 504
4 2.5 BHK 82.82 C 501
4 2.5 BHK 82.82 C 502
4 2.5 BHK 82.82 C 503
4 2.5 BHK 82.82 C 504
4 2.5 BHK 82.82 D 501
4 2.5 BHK 82.82 D 502
4 2.5 BHK 82.82 D 503
4 2.5 BHK 82.82 D 504
5 2.5 BHK 82.82 A 601
5 2.5 BHK 82.82 A 602
5 2.5 BHK 82.82 A 603
5 2.5 BHK 82.82 A 604
5 2.5 BHK 82.82 B 601
5 2.5 BHK 82.82 B 602
5 2.5 BHK 82.82 B 603
5 2.5 BHK 82.82 B 604
5 2.5 BHK 82.82 C 601
5 2.5 BHK 82.82 C 602
5 2.5 BHK 82.82 C 603
5 2.5 BHK 82.82 C 604
5 2.5 BHK 82.82 D 601
5 2.5 BHK 82.82 D 602
5 2.5 BHK 82.82 D 603
5 2.5 BHK 82.82 D 604
6 2.5 BHK 82.82 A 701
6 2.5 BHK 82.82 A 702
6 2.5 BHK 82.82 A 703
6 2.5 BHK 82.82 A 704
6 2.5 BHK 82.82 B 701
6 2.5 BHK 82.82 B 702
6 2.5 BHK 82.82 B 703
6 2.5 BHK 82.82 B 704
6 2.5 BHK 82.82 C 701
6 2.5 BHK 82.82 C 702
6 2.5 BHK 82.82 C 703
6 2.5 BHK 82.82 C 704
6 2.5 BHK 82.82 D 701
6 2.5 BHK 82.82 D 702
6 2.5 BHK 82.82 D 703
6 2.5 BHK 82.82 D 704
7 2.5 BHK 82.82 A 801
7 2.5 BHK 82.82 A 802
7 2.5 BHK 82.82 A 803
7 2.5 BHK 82.82 A 804
7 2.5 BHK 82.82 B 801
7 2.5 BHK 82.82 B 802
7 2.5 BHK 82.82 B 803
7 2.5 BHK 82.82 B 804
7 2.5 BHK 82.82 C 801
7 2.5 BHK 82.82 C 802
7 2.5 BHK 82.82 C 803
7 2.5 BHK 82.82 C 804
7 2.5 BHK 82.82 D 801
7 2.5 BHK 82.82 D 802
7 2.5 BHK 82.82 D 803
7 2.5 BHK 82.82 D 804
8 2.5 BHK 82.82 A 901
8 2.5 BHK 82.82 A 902
8 2.5 BHK 82.82 A 903
8 2.5 BHK 82.82 A 904
8 2.5 BHK 82.82 B 901
8 2.5 BHK 82.82 B 902
8 2.5 BHK 82.82 B 903
8 2.5 BHK 82.82 B 904
8 2.5 BHK 82.82 C 901
8 2.5 BHK 82.82 C 902
8 2.5 BHK 82.82 C 903
8 2.5 BHK 82.82 C 904
8 2.5 BHK 82.82 D 901
8 2.5 BHK 82.82 D 902
8 2.5 BHK 82.82 D 903
8 2.5 BHK 82.82 D 904
9 2.5 BHK 82.82 A 1001
9 2.5 BHK 82.82 A 1002
9 2.5 BHK 82.82 A 1003
9 2.5 BHK 82.82 A 1004
9 2.5 BHK 82.82 B 1001
9 2.5 BHK 82.82 B 1002
9 2.5 BHK 82.82 B 1003
9 2.5 BHK 82.82 B 1004
9 2.5 BHK 82.82 C 1001
9 2.5 BHK 82.82 C 1002
9 2.5 BHK 82.82 C 1003
9 2.5 BHK 82.82 C 1004
9 2.5 BHK 82.82 D 1001
9 2.5 BHK 82.82 D 1002
9 2.5 BHK 82.82 D 1003
9 2.5 BHK 82.82 D 1004
10 2.5 BHK 82.82 A 1101
10 2.5 BHK 82.82 A 1102
10 2.5 BHK 82.82 A 1103
10 2.5 BHK 82.82 A 1104
10 2.5 BHK 82.82 B 1101
10 2.5 BHK 82.82 B 1102
10 2.5 BHK 82.82 B 1103
10 2.5 BHK 82.82 B 1104
10 2.5 BHK 82.82 C 1101
10 2.5 BHK 82.82 C 1102
10 2.5 BHK 82.82 C 1103
10 2.5 BHK 82.82 C 1104
10 2.5 BHK 82.82 D 1101
10 2.5 BHK 82.82 D 1102
10 2.5 BHK 82.82 D 1103
10 2.5 BHK 82.82 D 1104
11 2.5 BHK 82.82 A 1201
11 2.5 BHK 82.82 A 1202
11 2.5 BHK 82.82 A 1203
11 2.5 BHK 82.82 A 1204
11 2.5 BHK 82.82 B 1201
11 2.5 BHK 82.82 B 1202
11 2.5 BHK 82.82 B 1203
11 2.5 BHK 82.82 B 1204
11 2.5 BHK 82.82 C 1201
11 2.5 BHK 82.82 C 1202
11 2.5 BHK 82.82 C 1203
11 2.5 BHK 82.82 C 1204
11 2.5 BHK 82.82 D 1201
11 2.5 BHK 82.82 D 1202
11 2.5 BHK 82.82 D 1203
11 2.5 BHK 82.82 D 1204
12 2.5 BHK 82.82 A 1301
12 2.5 BHK 82.82 A 1302
12 2.5 BHK 82.82 A 1303
12 2.5 BHK 82.82 A 1304
12 2.5 BHK 82.82 B 1301
12 2.5 BHK 82.82 B 1302
12 2.5 BHK 82.82 B 1303
12 2.5 BHK 82.82 B 1304
12 2.5 BHK 82.82 C 1301
12 2.5 BHK 82.82 C 1302
12 2.5 BHK 82.82 C 1303
12 2.5 BHK 82.82 C 1304
12 2.5 BHK 82.82 D 1301
12 2.5 BHK 82.82 D 1302
12 2.5 BHK 82.82 D 1303
12 2.5 BHK 82.82 D 1304
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ld Conversion Order
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 23-24.Pdf
Fd 2 BS 22-23.Pdf
Fd 3 Balance Sheet 21-22.Pdf
Fd 4 PL 23-24.Pdf
Fd 5 PL-22-23.Pdf
Fd 6 PL 21-22.Pdf
Fd 7 OAPL IT Ack FY 23-24.Pdf
Fd 8 OAPL IT Ack FY 22-23.Pdf
Fd 9 OAPL IT Ack FY 21-22.Pdf
Fd 10 OAPL Director Report 23-24.Pdf
Fd 11 Directors Report - OAPL 22-23.Pdf
Fd 12 OAPL - DR - 2021-22.Pdf
Fd 13 Cash Flow 23-24.Pdf
Fd 14 CF 22-23.Pdf
Fd 15 Cash Flow 21-22.Pdf
Fd 16 Auditor Report 23-24.Pdf
Fd 17 Auditor Report 22-23.Pdf
Fd 18 Audit Report 21-22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Od 1 Relinquishment Deed Chikkanayakanahalli.Pdf
Od 2 Title Report - Sy No 37-5.Pdf
Od 3 Title Report - Sy No 56-4.Pdf
Od 4 Title Report - Sy No 56-5.Pdf
Od 5 Title Report - Sy No 56-6.Pdf
Od 6 Title Report-Sy No 37-4.Pdf
Od 7 E Khata.Pdf
Od 8 Conversion Order -SyNo 37-5.Pdf
Od 9 Conversion Order SyNo37-4.Pdf
Od 10 Conversion Order Sy No 56-5.Pdf
Od 11 Conversion Order SyNo 56-4.Pdf
Od 12 Conversion Order-Sy No 56-6.Pdf
Od 13 EC 05-02-2022 To 25-11 -2024- Sy No 56-4.Pdf
Od 14 EC 05-02-2022 To 25-11-2024 - Sy No 37-5.Pdf
Od 15 EC 05-02-2022 To 25-11-2024 - Sy No 56-6.Pdf
Od 16 Conversion Order SyNo 56-4.Pdf
Od 17 Conversion Order-Sy No 56-6.Pdf
Od 18 Rectification Deed Doc 10011- SyNo 56-4.Pdf
Od 19 RTC 2020-2021 To 2022-2023- SyNo 37-4.Pdf
Od 20 RTC 2020-2021 To 2024-2025 - Sy No 37-5.Pdf
Od 21 RTC 2020-2021 To 2024-2025 - SyNo 56-4.Pdf
Od 22 RTC 2020-2021 To 2024-2025 - SyNo 56-5.Pdf
Od 23 RTC 2020-2021 To 2024-2025 - Syno 56-6.Pdf
Od 24 RTC 2023-2024 To 2024-2025 - SyNo 37-4.Pdf
Od 25 Sale Deed Doc 170 SyNo 37-5.Pdf
Od 26 Sale Deed Doc 179 Sy No 56-6.Pdf
Od 27 Sale Deed Doc 4446 Sy No56 -5.Pdf
Od 28 Sale Deed Doc 4466 Sy No 56-4.Pdf
Od 29 Sale Deed Doc177-SyNo37-4.Pdf
Od 30 Tropica 2- Agreement For Sale ( FINAL)28-11.Pdf
Od 31 Specification.Pdf
Od 32 5 6 7 8 TERRACE AREA DIAGRAM.Pdf
Od 33 5 6 7 8 GROUND FLOOR DIAGRAM Compressed.Pdf
Od 34 77 Area Development Plan.Pdf
Od 35 MODIFIED PLAN SANCTION LETTER.Pdf
Od 36 Chikkanayakanahalli GLV.Pdf
Od 37 BASEMENT AREA DIAGRAM PLAN.Pdf
Od 38 BASEMENT FLOOR PLAN.Pdf
Od 39 BLOCK 1 TO 8 ELEVATION PLAN Compressed.Pdf
Od 40 BLOCK 1 TO 8 SECTION PLAN Compressed.Pdf
Od 41 BLOCK 1 2 3 4 FLOOR&TERRACE PLAN (1) Compressed.Pdf
Od 42 BLOCK 1 2 3 4 FLOOR&TERRACE PLAN Compressed.Pdf
Od 43 BLOCK 1 2 3 4 TERRACE FLOOR DIAGRAM Compressed.Pdf
Od 44 BLOCK 5 6 7 8 FLOOR&TERRACE PLAN Compressed.Pdf
Od 45 GROUND FLOOR PLAN Compressed.Pdf
Od 46 SITE PLAN Compressed.Pdf
Od 47 BTPL ADARSH TROPICA 750 KLD [375 X 2 MODULAR] STP FEASIBILITY REPORT.Pdf
Od 48 CDP Plan Demarcation Of The Proposed Site.Pdf
Od 49 TROPICA - BDA DP Work Order Copy.Pdf
Od 50 TROPICA BP BDA License COPY.Pdf
Od 51 Village Map Demarcation Of The Proposed Site.Pdf
Od 52 Latitude Longitude.Pdf
Od 53 Full OAPL BS FY 2023-24.Pdf
Od 54 4600-OAPL (1).Pdf
Od 55 4600 - Orchid Apartments Private Limited.Pdf
Ed 1 30-12-2024
Ed 2 30-12-2024
Ed 3 30-12-2024
Ed 4 30-12-2024
Ed 5 30-12-2024
Ed 6 30-12-2024
Ed 7 30-12-2024
Ed 8 30-12-2024
Ed 9 30-12-2024
Ed 10 30-12-2024
Ed 11 30-12-2024
Ed 12 30-12-2024
Ed 13 30-12-2024
Ed 14 30-12-2024
Ed 15 30-12-2024
Ed 16 30-12-2024
Ed 17 30-12-2024
Ed 18 30-12-2024
Ed 19 30-12-2024
Ed 20 30-12-2024
Ed 21 30-12-2024
Ed 22 30-12-2024
Ed 23 30-12-2024
Ed 24 30-12-2024
Ed 25 30-12-2024
Ed 26 30-12-2024
Ed 27 30-12-2024
Ed 28 30-12-2024
Ed 29 30-12-2024
Ed 30 30-12-2024
Ed 31 30-12-2024
Ed 32 30-12-2024
Ed 33 30-12-2024
Ed 34 30-12-2024
Ed 35 30-12-2024
Ed 36 30-12-2024
Ed 37 30-12-2024
Ed 38 30-12-2024
Ed 39 30-12-2024
Ed 40 30-12-2024
Ed 41 30-12-2024
Ed 42 30-12-2024
Ed 43 30-12-2024
Ed 44 29-01-2025
Ed 45 29-01-2025
Ed 46 29-01-2025
Ed 47 29-01-2025
Ed 48 29-01-2025
Ed 49 29-01-2025
Ed 50 29-01-2025
Ed 51 29-01-2025
Ed 52 29-01-2025
Ed 53 29-01-2025
Ed 54 29-01-2025
Ed 55 29-01-2025
Ed 56 29-01-2025
Ed 57 29-01-2025
Ed 58 29-01-2025
Ed 59 25-02-2025
Ed 60 25-02-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Standard Chartered Bank
Account Number (RERA) 45505443539
IFSC SCBL0036073
Branch Address Koramangala
Country/City