Keya The Lake Terraces RERA Details - PRM/KA/RERA/1251/308/PR/170824/006975 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Keya The Lake Terraces under registration PRM/KA/RERA/1251/308/PR/170824/006975 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/170824/006975
  • Project Name The lake Terraces
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 September 2026
  • Documents 106 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 February 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

KEYA HOMES INFRA LLP
Registered Address 17, Regent Court, Ground Floor, 80 Feet road,Koramangala ,Bengaluru East ,Bengaluru Urban-560034
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Neotown , 100 Feet Road , Anekal , Bengaluru Urban, Karnataka - 560100

RERA Coordinates

Latitude, Longitude 12.829888994258102, 77.66420423984528
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/Plan Sanction/EM?EO-3/TA-2/E/22/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 31 January 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 3 23 0 208 Residential 74.0 22 187
Tower B 3 25 0 222 Residential 76.45 24 222

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • Tower A
  • Tower B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3 BHK 98.96 A0201
1 1 BHK 44.88 A0202
1 2 BHK 75.96 A0203
1 2 BHK 78.21 A0204
1 2 BHK 75.96 A0205
1 2 BHK 75.96 A0206
1 2 BHK 75.96 A0207
1 2 BHK 75.96 A0208
1 2 BHK 75.96 A0209
2 3 BHK 98.96 A0301
2 1 BHK 44.88 A0302
2 2 BHK 75.96 A0303
2 2 BHK 78.21 A0304
2 2 BHK 75.96 A0305
2 2 BHK 75.96 A0306
2 2 BHK 75.96 A0307
2 2 BHK 75.96 A0308
2 2 BHK 75.96 A0309
3 3 BHK 98.96 A0401
3 1 BHK 44.88 A0402
3 2 BHK 75.96 A0403
3 2 BHK 78.21 A0404
3 2 BHK 75.96 A0405
3 2 BHK 75.96 A0406
3 2 BHK 75.96 A0407
3 2 BHK 75.96 A0408
3 2 BHK 75.96 A0409
4 3 BHK 98.96 A0501
4 1 BHK 44.88 A0502
4 2 BHK 75.96 A0503
4 2 BHK 78.21 A0504
4 2 BHK 75.96 A0505
4 2 BHK 75.96 A0506
4 2 BHK 75.96 A0507
4 2 BHK 75.96 A0508
4 2 BHK 75.96 A0509
5 3 BHK 98.96 A0601
5 1 BHK 44.88 A0602
5 2 BHK 75.96 A0603
5 2 BHK 78.21 A0604
5 2 BHK 75.96 A0605
5 2 BHK 75.96 A0606
5 2 BHK 75.96 A0607
5 2 BHK 75.96 A0608
5 2 BHK 75.96 A0609
6 3 BHK 98.96 A0701
6 1 BHK 44.88 A0702
6 2 BHK 75.96 A0703
6 2 BHK 78.21 A0704
6 2 BHK 75.96 A0705
6 2 BHK 75.96 A0706
6 2 BHK 75.96 A0707
6 2 BHK 75.96 A0708
6 2 BHK 75.96 A0709
7 3 BHK 98.96 A0801
7 1 BHK 44.88 A0802
7 2 BHK 75.96 A0803
7 2 BHK 78.21 A0804
7 2 BHK 75.96 A0805
7 2 BHK 75.96 A0806
7 2 BHK 75.96 A0807
7 2 BHK 75.96 A0808
7 2 BHK 75.96 A0809
8 3 BHK 98.96 A0901
8 1 BHK 44.88 A0902
8 2 BHK 75.96 A0903
8 2 BHK 78.21 A0904
8 2 BHK 75.96 A0905
8 2 BHK 75.96 A0906
8 2 BHK 75.96 A0907
8 2 BHK 75.96 A0908
8 2 BHK 75.96 A0909
9 3 BHK 98.96 A1001
9 1 BHK 44.88 A1002
9 2 BHK 75.96 A1003
9 2 BHK 78.21 A1004
9 2 BHK 75.96 A1005
9 2 BHK 75.96 A1006
9 2 BHK 75.96 A1007
9 2 BHK 75.96 A1008
9 2 BHK 75.96 A1009
10 3 BHK 98.96 A1101
10 1 BHK 44.88 A1102
10 2 BHK 75.96 A1103
10 2 BHK 78.21 A1104
10 2 BHK 75.96 A1105
10 2 BHK 75.96 A1106
10 2 BHK 75.96 A1107
10 2 BHK 75.96 A1108
10 2 BHK 75.96 A1109
11 3 BHK 98.96 A1201
11 1 BHK 44.88 A1202
11 2 BHK 75.96 A1203
11 2 BHK 78.21 A1204
11 2 BHK 75.96 A1205
11 2 BHK 75.96 A1206
11 2 BHK 75.96 A1207
11 2 BHK 75.96 A1208
11 2 BHK 75.96 A1209
12 3 BHK 98.96 A1301
12 1 BHK 44.88 A1302
12 2 BHK 75.96 A1303
12 2 BHK 78.21 A1304
12 2 BHK 75.96 A1305
12 2 BHK 75.96 A1306
12 2 BHK 75.96 A1307
12 2 BHK 75.96 A1308
12 2 BHK 75.96 A1309
13 3 BHK 98.96 A1401
13 1 BHK 44.88 A1402
13 2 BHK 75.96 A1403
13 2 BHK 78.21 A1404
13 2 BHK 75.96 A1405
13 2 BHK 75.96 A1406
13 2 BHK 75.96 A1407
13 2 BHK 75.96 A1408
13 2 BHK 75.96 A1409
14 3 BHK 98.96 A1501
14 1 BHK 44.88 A1502
14 2 BHK 75.96 A1503
14 2 BHK 78.21 A1504
14 2 BHK 75.96 A1505
14 2 BHK 75.96 A1506
14 2 BHK 75.96 A1507
14 2 BHK 75.96 A1508
14 2 BHK 75.96 A1509
15 3 BHK 98.96 A1601
15 1 BHK 44.88 A1602
15 2 BHK 75.96 A1603
15 2 BHK 78.21 A1604
15 2 BHK 75.96 A1605
15 2 BHK 75.96 A1606
15 2 BHK 75.96 A1607
15 2 BHK 75.96 A1608
15 2 BHK 75.96 A1609
16 3 BHK 98.96 A1701
16 1 BHK 44.88 A1702
16 2 BHK 75.96 A1703
16 2 BHK 78.21 A1704
16 2 BHK 75.96 A1705
16 2 BHK 75.96 A1706
16 2 BHK 75.96 A1707
16 2 BHK 75.96 A1708
16 2 BHK 75.96 A1709
17 3 BHK 98.96 A1801
17 1 BHK 44.88 A1802
17 2 BHK 75.96 A1803
17 2 BHK 78.21 A1804
17 2 BHK 75.96 A1805
17 2 BHK 75.96 A1806
17 2 BHK 75.96 A1807
17 2 BHK 75.96 A1808
17 2 BHK 75.96 A1809
18 3 BHK 98.96 A1901
18 2 BHK 75.96 A1903
18 2 BHK 78.21 A1904
18 2 BHK 75.96 A1905
18 2 BHK 75.96 A1906
18 2 BHK 75.96 A1907
18 2 BHK 75.96 A1908
18 2 BHK 75.96 A1909
19 3 BHK 98.96 A2001
19 2 BHK 75.96 A2003
19 2 BHK 78.21 A2004
19 2 BHK 75.96 A2005
19 2 BHK 75.96 A2006
19 2 BHK 75.96 A2007
19 2 BHK 75.96 A2008
19 2 BHK 75.96 A2009
20 3 BHK 98.96 A2101
20 1 BHK 44.88 A2102
20 2 BHK 75.96 A2103
20 2 BHK 78.21 A2104
20 2 BHK 75.96 A2105
20 2 BHK 75.96 A2106
20 2 BHK 75.96 A2107
20 2 BHK 75.96 A2108
20 2 BHK 75.96 A2109
21 3 BHK 98.96 A2201
21 1 BHK 44.88 A2202
21 2 BHK 75.96 A2203
21 2 BHK 78.21 A2204
21 2 BHK 75.96 A2205
21 2 BHK 75.96 A2206
21 2 BHK 75.96 A2207
21 2 BHK 75.96 A2208
21 2 BHK 75.96 A2209
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 NA.Pdf
Fd 2 A 60 22-23.Pdf
Fd 3 A 60 21-22.Pdf
Fd 4 NA.Pdf
Fd 5 A 61 22-23.Pdf
Fd 6 A 61 21-22.Pdf
Fd 7 NA.Pdf
Fd 8 NA.Pdf
Fd 9 NA.Pdf
Fd 10 NA.Pdf
Fd 11 NA.Pdf
Fd 12 NA.Pdf
Fd 13 NA.Pdf
Fd 14 A 64 22-23.Pdf
Fd 15 A 64 21-22.Pdf
Fd 16 NA.Pdf
Fd 17 A 65 22-23.Pdf
Fd 18 A 65 21-22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Ed 1 30-04-2024
Ed 2 30-04-2024
Ed 3 30-04-2024
Ed 4 30-04-2024
Ed 5 30-04-2024
Ed 6 30-04-2024
Ed 7 30-04-2024
Ed 8 30-04-2024
Ed 9 30-04-2024
Ed 10 30-04-2024
Ed 11 30-04-2024
Ed 12 30-04-2024
Ed 13 30-04-2024
Ed 14 30-04-2024
Ed 15 30-04-2024
Ed 16 30-04-2024
Ed 17 30-04-2024
Ed 18 30-04-2024
Ed 19 30-04-2024
Ed 20 30-04-2024
Ed 21 30-04-2024
Ed 22 30-04-2024
Ed 23 30-04-2024
Ed 24 24-05-2024
Ed 25 24-05-2024
Ed 26 24-05-2024
Ed 27 24-05-2024
Ed 28 24-05-2024
Ed 29 24-05-2024
Ed 30 24-05-2024
Ed 31 02-08-2024
Ed 32 12-08-2024
Ed 33 12-08-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 59200319300605
IFSC HDFC0002777
Branch Address ST BED LAYOUT,  4TH BLOCK KORAMANGALA
Country/City