Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

MVN Aero One RERA Details - PRM/KA/RERA/1250/303/PR/141223/006472 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for MVN Aero One under registration PRM/KA/RERA/1250/303/PR/141223/006472 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/141223/006472
  • Project Name MVN AERO ONE T5 & T6
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 20 July 2027
  • Documents 86 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 20 July 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

MF FARMLANDS PRIVATE LIMITED
Registered Address MF Farmlands Pvt Limited,Sy No 29/2 , 29/3 ,29/4,28/1 and 28/4,Rayasandra village, ,Devanahalli ,Bengaluru Rural-562110
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 28/1, 28/4, 29/2, 29/3 & 29/4 Rayasandra village, Devanahalli Taluk , , Bangalore , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.216257310288146, 77.70991619654949
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. STRRPA/TP/CC/14/2020-21
Authority BMRDA - Bangalore Metropolitan Region Development Authority
Approved Date 12 November 2020

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower 5 2 13 1 70 Residential 49.95 13 53
Tower 6 0 14 1 81 Residential 49.95 14 84

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
  • Tower 5
  • Tower 6
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 77.5 5-00A
GF 2 BHK 77.5 5-01A
GF 1 BHK 40.87 5-01B
GF 2 BHK 75 5-01C
GF 2 BHK 74.56 5-01D
1 2 BHK 77.5 5-02A
1 1 BHK 40.87 5-02B
1 2 BHK 75 5-02C
1 2 BHK 74.56 5-02D
2 2 BHK 77.5 5-03A
2 1 BHK 40.87 5-03B
2 2 BHK 75 5-03C
2 2 BHK 74.56 5-03D
3 2 BHK 77.5 5-04A
3 1 BHK 40.87 5-04B
3 2 BHK 75 5-04C
3 2 BHK 74.56 5-04D
4 2 BHK 77.5 5-05A
4 1 BHK 40.87 5-05B
4 2 BHK 75 5-05C
4 2 BHK 74.56 5-05D
5 2 BHK 77.5 5-06A
5 1 BHK 40.87 5-06B
5 2 BHK 75 5-06C
5 2 BHK 74.56 5-06D
6 1 BHK 77.5 5-07A
6 2 BHK 40.87 5-07B
6 2 BHK 75 5-07C
6 2 BHK 74.56 5-07D
7 2 BHK 77.5 5-08A
7 1 BHK 40.87 5-08B
7 2 BHK 75 5-08C
7 2 BHK 74.56 5-08D
8 2 BHK 77.5 5-09A
8 1 BHK 40.87 5-09B
8 2 BHK 75 5-09C
8 2 BHK 74.56 5-09D
9 2 BHK 77.5 5-10A
9 1 BHK 40.87 5-10B
9 2 BHK 75 5-10C
9 2 BHK 74.56 5-10D
10 2 BHK 77.5 5-11A
10 1 BHK 40.87 5-11B
10 2 BHK 75 5-11C
10 2 BHK 74.56 5-11D
11 2 BHK 77.5 5-12A
11 1 BHK 40.87 5-12B
11 2 BHK 75 5-12C
11 2 BHK 74.56 5-12D
12 2 BHK 77.5 5-14A
12 1 BHK 40.87 5-14B
12 2 BHK 75 5-14C
12 2 BHK 74.56 5-14D
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported
Sub Structure Upto Plinth Level % not reported Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 22 To 23.Pdf
Fd 2 Balance Sheet 21-22.Pdf
Fd 3 Balance Sheet 20-21.Pdf
Fd 4 Profit & Loss 22 To 23.Pdf
Fd 5 Profit And Loss 21 To 22.Pdf
Fd 6 Profit & Loss 20-21.Pdf
Fd 7 Directors Report 22 To 23.Pdf
Fd 8 Directors Report 21 To 22.Pdf
Fd 9 Directors Report 20 To 21.Pdf
Fd 10 Cash Flow 22-23.Pdf
Fd 11 Cash Flow-21-22.Pdf
Fd 12 Cash Flow 20-21.Pdf
Fd 13 Auditors Report 22 To 23.Pdf
Fd 14 Audit Report 21-22.Pdf
Fd 15 Audit Report 20-21.Pdf
Fd 16 ITR 22 TO 23.Pdf
Fd 17 ITR 21 TO 22.Pdf
Fd 18 ITR 2021.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 14th Floor Plan And Terrace Floor Plan Compressed.Pdf
Od 2 06 Typical 3rd 5th 7th 9th 11th And 13th Floor (2) Compressed.Pdf
Od 3 05 1st Floor Plan And Typical 2nd 4th 6th 8th (3)Compressed.Pdf
Od 4 04 Ground Floor Plan 1 (2)Compressed.Pdf
Od 5 03 1st Basement Floor Plan (1)Compressed.Pdf
Od 6 02 2nd Basement Floor Plan (1)Compressed.Pdf
Od 7 DP Plan Order 1.Pdf
Od 8 Guidlines Value.Pdf
Od 9 STP Design.Pdf
Od 10 Village Map.Pdf
Od 11 VILLAGEMAP ZONEADLR SKETCH (2).Pdf
Ed 1 22-11-2023
Ed 2 22-11-2023
Ed 3 22-11-2023
Ed 4 22-11-2023
Ed 5 22-11-2023
Ed 6 22-11-2023
Ed 7 22-11-2023
Ed 8 22-11-2023
Ed 9 22-11-2023
Ed 10 22-11-2023
Ed 11 22-11-2023
Ed 12 22-11-2023
Ed 13 22-11-2023
Ed 14 22-11-2023
Ed 15 22-11-2023
Ed 16 22-11-2023
Ed 17 22-11-2023
Ed 18 07-12-2023
Ed 19 07-12-2023
Ed 20 07-12-2023
Ed 21 07-12-2023
Ed 22 07-12-2023
Ed 23 07-12-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 50200031104981
IFSC HDFC0001744
Branch Address DEVANAHALLI
Country/City