Salarpuria Sattva Park Cubix RERA Details - PRM/KA/RERA/1250/303/PR/280225/007529 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Salarpuria Sattva Park Cubix under registration PRM/KA/RERA/1250/303/PR/280225/007529 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/303/PR/280225/007529
  • Project Name Park Cubix Phase 2
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Rural
  • Taluka Devanahalli
  • Original Completion 15 September 2029
  • Documents 100 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 September 2024 Expected commencement of civil works and foundation on site.
Original Completion 15 September 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Sattva Resi Private Limited
Registered Address 4th Floor, Sattva Windsor, No.3, ,Ulsoor Road, Bengaluru ,Bengaluru East ,Bengaluru Urban-560042
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address katha number 3963/2714/341/342/1/342/2/343/1/343/2/345/2/359/360/361/2/362/1/362/2/367/1/B issued Devanahalli town municipal council, , Survey No. 341/1, 342/1, 342/2, 343/1, 343/2, 345/2, 359, 360, 361/2, 362/1, 362/2, and 367/1 all situated at Devanahalli Village, Kasaba Hobli , Devanahalli , Bengaluru Rural, Karnataka - 562110

RERA Coordinates

Latitude, Longitude 13.24131597560623, 77.72044448956024
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. DHL-LBPAS-10791/24-25/BP
Authority BIAPPA - Bangalore Airport Area Planning Authority
Approved Date 24 February 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
13 PENTAMIX 2 15 1 85 Mixed 45.0 14 85
14 PENTAMIX 2 15 1 57 Residential 45.0 14 57
15 DIAMOND 2 15 1 86 Residential 45.0 14 86
16 DICE 2 15 1 116 Residential 45.0 14 171
17 QUARTZ 2 15 1 116 Residential 45.0 14 171
18 QUARTZ 2 15 1 116 Residential 45.0 14 171
19 QUARTZ 2 15 1 57 Residential 45.0 14 57

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
5 BHK 0 units
STUDIO UNIT 0 units
  • 13 PENTAMIX
  • 14 PENTAMIX
  • 15 DIAMOND
  • 16 DICE
  • 17 QUARTZ
  • 18 QUARTZ
  • 19 QUARTZ
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2.5 BHK 80.82497213 T13-004
-1 3 BHK 99.68413229 T13-005
GF 3 BHK 102.4712003 T13-102
GF 3 BHK 97.82608696 T13-103
GF 2.5 BHK 80.82497213 T13-104
GF 3 BHK 99.68413229 T13-105
GF 3 BHK 98.10479376 T13-106
1 2.5 BHK 81.475288 T13-201
1 3 BHK 102.4712003 T13-202
1 3 BHK 97.82608696 T13-203
1 2.5 BHK 80.82497213 T13-204
1 3 BHK 99.68413229 T13-205
1 3 BHK 98.10479376 T13-206
2 2.5 BHK 81.475288 T13-301
2 3 BHK 102.4712003 T13-302
2 3 BHK 97.82608696 T13-303
2 2.5 BHK 80.82497213 T13-304
2 3 BHK 99.68413229 T13-305
2 3 BHK 98.10479376 T13-306
3 2.5 BHK 81.475288 T13-401
3 3 BHK 102.4712003 T13-402
3 3 BHK 97.82608696 T13-403
3 2.5 BHK 80.82497213 T13-404
3 3 BHK 99.68413229 T13-405
3 3 BHK 98.10479376 T13-406
4 2.5 BHK 81.475288 T13-501
4 3 BHK 102.4712003 T13-502
4 3 BHK 97.82608696 T13-503
4 2.5 BHK 80.82497213 T13-504
4 3 BHK 99.68413229 T13-505
4 3 BHK 98.10479376 T13-506
5 2.5 BHK 81.475288 T13-601
5 3 BHK 102.4712003 T13-602
5 3 BHK 97.82608696 T13-603
5 2.5 BHK 80.82497213 T13-604
5 3 BHK 99.68413229 T13-605
5 3 BHK 98.10479376 T13-606
6 2.5 BHK 81.475288 T13-701
6 3 BHK 102.4712003 T13-702
6 3 BHK 97.82608696 T13-703
6 2.5 BHK 80.82497213 T13-704
6 3 BHK 99.68413229 T13-705
6 3 BHK 98.10479376 T13-706
7 2.5 BHK 81.475288 T13-801
7 3 BHK 102.4712003 T13-802
7 3 BHK 97.82608696 T13-803
7 2.5 BHK 80.82497213 T13-804
7 3 BHK 99.68413229 T13-805
7 3 BHK 98.10479376 T13-806
8 2.5 BHK 81.475288 T13-901
8 3 BHK 102.4712003 T13-902
8 3 BHK 97.82608696 T13-903
8 2.5 BHK 80.82497213 T13-904
8 3 BHK 99.68413229 T13-905
8 3 BHK 98.10479376 T13-906
9 2.5 BHK 81.475288 T13-1001
9 3 BHK 102.4712003 T13-1002
9 3 BHK 97.82608696 T13-1003
9 2.5 BHK 80.82497213 T13-1004
9 3 BHK 99.68413229 T13-1005
9 3 BHK 98.10479376 T13-1006
10 2.5 BHK 81.475288 T13-1101
10 3 BHK 102.4712003 T13-1102
10 3 BHK 97.82608696 T13-1103
10 2.5 BHK 80.82497213 T13-1104
10 3 BHK 99.68413229 T13-1105
10 3 BHK 98.10479376 T13-1106
11 2.5 BHK 81.475288 T13-1201
11 3 BHK 102.4712003 T13-1202
11 3 BHK 97.82608696 T13-1203
11 2.5 BHK 80.82497213 T13-1204
11 3 BHK 99.68413229 T13-1205
11 3 BHK 98.10479376 T13-1206
12 2.5 BHK 81.475288 T13-1301
12 3 BHK 102.4712003 T13-1302
12 3 BHK 97.82608696 T13-1303
12 2.5 BHK 80.82497213 T13-1304
12 3 BHK 99.68413229 T13-1305
12 3 BHK 98.10479376 T13-1306
13 2.5 BHK 81.475288 T13-1401
13 3 BHK 102.4712003 T13-1402
13 3 BHK 97.82608696 T13-1403
13 2.5 BHK 80.82497213 T13-1404
13 3 BHK 99.68413229 T13-1405
13 3 BHK 98.10479376 T13-1406
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Multipurpose Hall % not reported Amenities Party Hall % not reported Amenities Squash Court % not reported
Amenities Aerobic/yoga % not reported Amenities Indoor Games % not reported Amenities Gymanasium % not reported
Amenities Ladies Health Club % not reported Amenities Gents Health Club % not reported Amenities Badminton Court % not reported
Amenities Childern's Play Area % not reported Amenities Senior Citizens Park % not reported Amenities Play Court % not reported
Amenities Theme Gardens % not reported Amenities Jogging/walking Track % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BS & Sch -23-24.Pdf
Fd 2 Balance Sheet FY 2022-23.Pdf
Fd 3 Park Cubix-Phase 2-Financial Data.Pdf
Fd 4 PL & Sch -23-24.Pdf
Fd 5 Audited Profit And Loss Statement FY 22 - 23.Pdf
Fd 6 Park Cubix-Phase 2-Financial Data.Pdf
Fd 7 FY 2023 - 24 ITR ACK.Pdf
Fd 8 FY 2022 - 23 ITR.Pdf
Fd 9 Park Cubix-Phase 2-Financial Data.Pdf
Fd 10 Sattva Resi Board Report 2023-24.Pdf
Fd 11 Director'S Report FY 22-23.Pdf
Fd 12 Park Cubix-Phase 2-Financial Data.Pdf
Fd 13 CFS -23-24.Pdf
Fd 14 NOT APPLICABLE.Pdf
Fd 15 Park Cubix-Phase 2-Financial Data.Pdf
Fd 16 Auditors Report -23-24.Pdf
Fd 17 Auditor'S Report FY 2022-2023.Pdf
Fd 18 Park Cubix-Phase 2-Financial Data.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 7 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Photo 6 Project Photo
Photo 7 Project Photo
Photo 8 Project Photo
Photo 9 Project Photo
Photo 10 Project Photo
Od 1 Devanahalli Reliquishment Deed To Purasabhe.Pdf
Od 2 2nd To Terrace Building-2.Pdf
Od 3 3rd To Terrace Building-5.Pdf
Od 4 ClubHouse Building-2.Pdf
Od 5 Ground & First Building-2.Pdf
Od 6 Ground To Terrace Building-3.Pdf
Od 7 Ground To Terrace Building-4.Pdf
Od 8 Ground To 2nd Building-5.Pdf
Od 9 2nd Basement Floor Plan.Pdf
Od 10 1st Basement Floor Plan.Pdf
Od 11 Park Cubix-Ph 2-Modifed DP.Pdf
Od 12 Park Cubix Phase2-Modified Residential DP Order.Pdf
Od 13 Devanahalli 341 LU.Pdf
Od 14 Devanahalli 341 RC.Pdf
Od 15 Devanahalli 341 SR.Pdf
Od 16 PARK CUBIX PH 2 - STP LAYOUT-MP.Pdf
Od 17 Park Cubix Ph2 -Saleable Area Statement.Pdf
Od 18 SATTVA PARK CUBIX- Ph2--Estimate.Pdf
Od 19 Affidavit For EC.Pdf
Od 20 Site Area Demarcation Phase 2.Pdf
Ed 1 26-02-2025
Ed 2 26-02-2025
Ed 3 26-02-2025
Ed 4 26-02-2025
Ed 5 26-02-2025
Ed 6 26-02-2025
Ed 7 26-02-2025
Ed 8 26-02-2025
Ed 9 26-02-2025
Ed 10 26-02-2025
Ed 11 26-02-2025
Ed 12 26-02-2025
Ed 13 26-02-2025
Ed 14 26-02-2025
Ed 15 26-02-2025
Ed 16 26-02-2025
Ed 17 26-02-2025
Ed 18 26-02-2025
Ed 19 26-02-2025
Ed 20 26-02-2025
Ed 21 26-02-2025
Ed 22 26-02-2025
Ed 23 26-02-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705616313
IFSC ICIC0000002
Branch Address MG Road
Country/City