The Sky Amenity Precinct at Dosti 604
Dosti 604 distributes its 25+ amenities across the ground, podium, and sky levels of the 56-floor towers. The sky gym, sky cinema lounge, and pickleball court in the sky maximise height as a lifestyle feature, while the Miyawaki forest and yoga lawn ground the experience in nature at the podium level.
Sports and Fitness Facilities at Dosti 604
- Sky gym for elevation-enhanced fitness with city views.
- Pickleball court in the sky and yoga lawn for active recreation.
- Kids' play areas and kids' pool for family use at Dosti 604.
Children's and Family Amenities at Dosti 604
- Kids' play areas with sand pits and a kids' pool within the podium level.
- Meditation pods for quiet, focused relaxation away from the community noise.
Wellness and Relaxation Amenities at Dosti 604
Meditation pods and a yoga lawn at Dosti 604 support daily wellness routines. The sky cinema lounge extends the leisure offer beyond fitness into social and entertainment, offering a distinct alternative to standard clubhouse formats.
Entertainment and Social Venues at Dosti 604
- Sky cinema lounge for resident screenings and social events at elevation.
- Podium-level communal zones for everyday gathering and informal interaction.
Green Space and Outdoor Amenities at Dosti 604
The Miyawaki forest at Dosti 604 brings dense, fast-growing native plantation into 2.5 acres in Wagle Industrial Estate — a meaningful green investment in a traditionally industrial neighbourhood.
Safety and Security at Dosti 604
- 24x7 security, CCTV, intercom, and fire fighting systems across all towers.
- Power backup covering common areas, lifts, and essential building services.
What Dosti 604's Amenity Ecosystem Adds Up To
At Dosti 604, 25+ amenities distributed across ground, podium, and sky levels — combined with the Miyawaki forest and Metro Line 4 proximity — create a liveability proposition well above the standard for the Wagle Industrial Estate new-launch segment.
SPECIFICATIONS
How to Read Dosti 604's Specification Sheet
The specification sheet defines materials across structure, flooring, walls, kitchen, bathrooms, and doors. Cross-check it against the PR1330002502719 RERA filing before signing to confirm specifications are binding.
Structure – RCC Frame Structure
RCC frame construction supports the 56-floor tower height at Dosti 604, providing earthquake resistance, structural integrity, and load-bearing reliability across all residential and podium floor plates.
Master Bedroom – Walls
Oil Bound Distemper — smooth, washable finish applied across all configurations at Dosti 604.
Master Bedroom – Flooring
Vitrified Tiles — durable, low-maintenance, with high compressive strength and minimal water absorption.
Other Bedrooms – Flooring
Vitrified Tiles maintain finish consistency across all bedrooms at Dosti 604, avoiding the tiered quality common in lower-specified projects.
Living and Dining Area – Flooring
Vitrified Tiles throughout the living and dining zone. Confirm balcony surface separately as exposed areas typically require an anti-slip specification.
Kitchen – Platform and Flooring
Oil Bound Distemper, Vitrified Tiles, RCC Frame Structure. Confirm platform material, backsplash inclusion, and sink fitting brand from the Dosti Group specification document.
Bathroom – Fixtures and Fittings
Quality sanitary ware with anti-skid flooring. Confirm brand names for taps, sanitary ware, and shower fittings from the specification sheet before signing.
Doors and Windows
Quality door and window systems with branded electrical fittings. Window placement across 56 floors supports natural ventilation and maximises light capture at all levels of Dosti 604.
What Dosti 604's Specification Sheet Doesn't Tell You – Five Things to Ask Before Signing
- Ask for the specific brand and grade of Vitrified Tiles — grade affects long-term durability and finish.
- Confirm whether the kitchen platform includes a backsplash and what material is used.
- Get branded electrical fitting names in writing from Dosti Group.
- Ask about balcony surface finish and waterproofing treatment for sky-level exposed areas.
- Confirm the five-year structural defect liability period under RERA from possession at Dosti 604.