Sports
- Kids' Play Areas / Sand Pits
₹16.00 Lac - 21.30 Lac
₹7,800 Per Sq. Ft.
View the latest price list for I Build Shubharambh.
*Prices are indicative and subject to applicable charges and project terms.
I Build Shubharambh's average asking price is rising quarter-on-quarter, compared with Hadapsar.
I Build Shubharambh avg. price is ₹ 7.8 k/Sq.Ft. compared to Hadapsar at ₹ 14.2 K/Sq.Ft.
Monthly Rent in Hadapsar ranges from ₹ 24.9 K to ₹ 87.1 K with options available for 1,2,3,4 BHK units
Get the latest price and market updates for I Build Shubharambh.
Maharashtra Cabinet Committee has approved the revised cost of ₹10,502.36 crore for the eastern extension of the Pune Ring Road. This 31.805-km controlled-access expressway aims to divert traffic away from Pune city. With 80% of land acquisition complete, the project is slated for completion by June 2029
MSIDC and Pune Metro are set to sign MoUs to integrate Metro infrastructure with two upcoming road projects. Approximately 7.7 km of the Kharadi-Shirur elevated corridor and 17 km of the Hadapsar-Yavat elevated corridor will be developed as double-decker structures, with the upper deck designed to accommodate future Metro lines.
Cm Devendra Fadnavis laid the foundation stones for three elevated road projects worth ₹18,000 crore in Pune. These projects aim to significantly reduce traffic congestion across the city and its surrounding areas. The projects include the Pune-Shirur Elevated Highway, Hadapsar-Yavat Elevated Highway, and Talegaon-Chakan-Shikrapur Elevated Highway,.
Cm Devendra Fadnavis laid the foundation stones for three elevated road projects worth ₹18,000 crore in Pune. These projects aim to significantly reduce traffic congestion across the city and its surrounding areas. The projects include the Pune-Shirur Elevated Highway, Hadapsar-Yavat Elevated Highway, and Talegaon-Chakan-Shikrapur Elevated Highway,.
During Q2'2026, average property prices for I Build Shubharambh moved from ₹ 6,900/sqft to ₹ 7,800/sqft, reflecting a 13.04% rise.
Pune Metro's Phase 2 plans include approximately 22 km of integrated double-decker flyovers across the city. These corridors will feature six-lane and eight-lane elevated roads. Key stretches are planned on the Ramwadi-Wagholi, Vanaz-Chandani Chowk, Kharadi-Khadakwasla, and Bhairoba Nala-Akashwani routes.
Pune Metro's elevated Line 3, spanning 23.203 km and connecting Hinjewadi to Shivajinagar, will begin operations in phases starting June 15, 2026. The first phase will cover 12 stations from the Hinjewadi side, with the remaining stations expected to be operational by October.
PMC is moving forward with plans to construct a new bridge parallel to the existing Rajaram Bridge to alleviate traffic congestion on Sinhagad Road. This project aims to improve connectivity between Sinhagad Road and Karvenagar , DP Road, reducing daily traffic bottlenecks and enhancing commuter experience.
CM Devendra Fadnavis announced that Pune, Pimpri Chinchwad, and the Pune Metropolitan region will soon have a nearly 200 km Metro network. This expansion aims to significantly alleviate traffic congestion in the city. Currently, about 33 km of the metro network is operational, & 55 km in construction phase ,with further additions planned.
Pune's new double-decker flyover, featuring a road flyover below and a Metro line above, was inaugurated by Chief Minister Devendra Fadnavis to alleviate traffic congestion in areas like Baner, Pashan, Shivajinagar, and Aundh. Additionally, a 31.50 km six-lane elevated highway will be constructed on the Pune-Solapur national highway from Hadapsar to Yavat at a cost of ₹5,262 crore
Price:₹ 16.00 Lac
Price:₹ 21.30 Lac
Explore the master plan, project photos and walkthrough videos of I Build Shubharambh to understand the overall layout, tower placement, amenities, landscaped spaces and key highlights before making your buying decision.

Estimate commute from your office or kid's school to I Build Shubharambh.

Please select the starting point to calculate the travel time.
I Build Shubharambh has received its completion and occupancy approvals. With a possession status of Ready to Move, buyers can move in immediately after completing purchase formalities.
Yes, I Build Shubharambh is a Ready to Move residential project, allowing buyers to take possession immediately without any construction wait.
Yes, most major banks and NBFCs offer home loans for ready-to-move projects like I Build Shubharambh, subject to eligibility.
Residents of I Build Shubharambh can enjoy amenities such as Kids' Play Areas / Sand Pits, Power Backup, 24*7 Water Supply, 24 x 7 Security, Normal Park / Central Green, Indoor Games, designed for comfort and a modern lifestyle.
After taking possession at I Build Shubharambh, buyers should inspect electrical fittings, plumbing and water supply (municipal/borewell), elevator operations across 1, parking allocation, common areas, and verify that the flat matches the approved Oil Bound Distemper, Vitrified Tiles, RCC Frame Structure and inventory list before moving in.
This website is only for the purpose of providing information regarding real estate projects in different geographies. Any information which is being provided on this website is not an advertisement or a solicitation. The company has not verified the information and the compliances of the projects. Further, the company has not checked the RERA* registration status of the real estate projects listed herein. The company does not make any representation in regards to the compliances done against these projects. Please note that you should make yourself aware about the RERA* registration status of the listed real estate projects.
*Real Estate (Regulation & Development) Act, 2016.