Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Green Edge Signature RERA Details - PRM/KA/RERA/1251/446/PR/220424/006831 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Green Edge Signature under registration PRM/KA/RERA/1251/446/PR/220424/006831 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/220424/006831
  • Project Name Green Edge Signature
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2026
  • Documents 101 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 08 February 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Green Edge Ventures
Registered Address NO 73 SORAHUNASE CROSS,SORAHUNASE VARTHUR VILLAGE & HOBLI ,Bengaluru East ,Bengaluru Urban-560087
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address BBMP Katha No 1482 Sy No 58/2, 60/8, 60/9, 60/10, 60/19, 60/20, 60/21 , SORAHUNASE CROSS SORAHUNASE VARTHUR VILLAGE and HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.944066837445549, 77.751214324729
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl. Dir/JD North/0085/2022-23 & PRJ/11929/22-23
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 08 February 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
BLOCK-A 2 7 0 112 Residential 20.99 6 112
BLOCK-B 2 7 0 104 Residential 20.99 6 104

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • BLOCK-A
  • BLOCK-B
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 110.52 A001
-1 3 BHK 108.50 A002
-1 3 BHK 95.86 A003
-1 3 BHK 95.86 A004
-1 2 BHK 78.58 A005
-1 2 BHK 78.43 A006
-1 3 BHK 100.93 A007
-1 3 BHK 100.93 A008
-1 2 BHK 77.53 B001
-1 2 BHK 82.81 B002
-1 3 BHK 95.86 B003
-1 3 BHK 95.86 B004
-1 3 BHK 110.52 B005
-1 3 BHK 110.52 B006
-1 3 BHK 100.93 B007
-1 3 BHK 100.93 B008
GF 3 BHK 110.52 A101
GF 3 BHK 110.52 A102
GF 3 BHK 95.86 A103
GF 3 BHK 95.86 A104
GF 2 BHK 78.43 A105
GF 2 BHK 78.43 A106
GF 3 BHK 100.93 A107
GF 3 BHK 100.93 A108
GF 2 BHK 77.53 B101
GF 2 BHK 82.81 B102
GF 3 BHK 95.86 B103
GF 3 BHK 95.86 B104
GF 3 BHK 110.52 B105
GF 3 BHK 110.52 B106
GF 3 BHK 100.93 B107
GF 3 BHK 100.93 B108
1 3 BHK 110.52 A201
1 3 BHK 111.05 A202
1 3 BHK 95.86 A203
1 3 BHK 95.86 A204
1 2 BHK 78.43 A205
1 2 BHK 78.43 A206
1 3 BHK 100.93 A207
1 3 BHK 100.93 A208
1 2 BHK 77.53 B201
1 2 BHK 82.81 B202
1 3 BHK 95.86 B203
1 3 BHK 95.86 B204
1 3 BHK 110.52 B205
1 3 BHK 110.52 B206
1 3 BHK 100.93 B207
1 3 BHK 100.93 B208
2 3 BHK 110.52 A301
2 3 BHK 111.05 A302
2 3 BHK 95.86 A303
2 3 BHK 95.86 A304
2 2 BHK 78.43 A305
2 2 BHK 78.43 A306
2 3 BHK 100.93 A307
2 3 BHK 100.93 A308
2 2 BHK 77.53 B301
2 2 BHK 82.81 B302
2 3 BHK 95.86 B303
2 3 BHK 95.86 B304
2 3 BHK 110.52 B305
2 3 BHK 110.52 B306
2 3 BHK 100.93 B307
2 3 BHK 100.93 B308
3 3 BHK 110.52 A401
3 3 BHK 111.05 A402
3 3 BHK 95.86 A403
3 3 BHK 95.86 A404
3 2 BHK 78.43 A405
3 2 BHK 78.43 A406
3 3 BHK 100.93 A407
3 3 BHK 100.93 A408
3 2 BHK 77.53 B401
3 2 BHK 82.81 B402
3 3 BHK 95.86 B403
3 3 BHK 95.86 B404
3 3 BHK 110.52 B405
3 3 BHK 110.52 B406
3 3 BHK 100.93 B407
3 3 BHK 100.93 B408
4 3 BHK 110.52 A501
4 3 BHK 111.05 A502
4 3 BHK 95.86 A503
4 3 BHK 95.86 A504
4 2 BHK 78.43 A505
4 2 BHK 78.43 A506
4 3 BHK 100.93 A507
4 3 BHK 100.93 A508
4 2 BHK 77.53 B501
4 2 BHK 82.81 B502
4 3 BHK 95.86 B503
4 3 BHK 95.86 B504
4 3 BHK 110.52 B505
4 3 BHK 110.52 B506
4 3 BHK 100.93 B507
4 3 BHK 100.93 B508
5 3 BHK 110.52 A601
5 3 BHK 111.05 A602
5 3 BHK 95.86 A603
5 3 BHK 95.86 A604
5 2 BHK 78.43 A605
5 2 BHK 78.43 A606
5 3 BHK 100.93 A607
5 3 BHK 100.93 A608
5 2 BHK 77.53 B601
5 2 BHK 82.81 B602
5 3 BHK 95.86 B603
5 3 BHK 95.86 B604
5 3 BHK 110.52 B605
5 3 BHK 110.52 B606
5 3 BHK 100.93 B607
5 3 BHK 100.93 B608
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Water And Sanitation % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet.Pdf
Fd 2 Balance Sheet.Pdf
Fd 3 Balance Sheet.Pdf
Fd 4 P&L Account.Pdf
Fd 5 P&L Account.Pdf
Fd 6 P&L Account.Pdf
Fd 7 Director Report.Pdf
Fd 8 Director Report.Pdf
Fd 9 Director Report.Pdf
Fd 10 Cashflow Statement.Pdf
Fd 11 Cashflow Statement.Pdf
Fd 12 Cashflow Statement.Pdf
Fd 13 Auditor Report.Pdf
Fd 14 Auditor Report.Pdf
Fd 15 Auditor Report.Pdf
Fd 16 IT ACKNOWLEDGEMENT.Pdf
Fd 17 IT ACKNOWLEDGEMENT.Pdf
Fd 18 IT ACKNOWLEDGEMENT.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 1 SITE PLAN.Pdf
Od 2 2 1st BF AB.Pdf
Od 3 3 2nd BF AB.Pdf
Od 4 4 GF ABC.Pdf
Od 5 5 1st Floor AB.Pdf
Od 6 6 2nd To 6th Typical &ELEVATION.Pdf
Od 7 7 TERRACE PLAN.Pdf
Od 8 GPA Jayamma.Pdf
Od 9 GPA Muniraju.Pdf
Od 10 JDA Jayamma.Pdf
Od 11 Amalgamation Deed.Pdf
Od 12 Certified Guidline Value Varthur -.Pdf
Od 13 Partnership Deed Green Edge Ventures.Pdf
Od 14 Reconstution Of Partnership Deed.Pdf
Od 15 Sharing Agreement Venture - Converted.Pdf
Od 16 NOC HAL.Pdf
Ed 1 18-04-2024
Ed 2 18-04-2024
Ed 3 18-04-2024
Ed 4 18-04-2024
Ed 5 18-04-2024
Ed 6 18-04-2024
Ed 7 18-04-2024
Ed 8 18-04-2024
Ed 9 18-04-2024
Ed 10 18-04-2024
Ed 11 18-04-2024
Ed 12 18-04-2024
Ed 13 18-04-2024
Ed 14 18-04-2024
Ed 15 18-04-2024
Ed 16 18-04-2024
Ed 17 18-04-2024
Ed 18 21-04-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 742705000476
IFSC ICICI000742
Branch Address CHANNASANDRA MAIN ROAD BANGALORE
Country/City