Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

JRC Wild Woods RERA Details - PRM/KA/RERA/1251/310/PR/070425/007658 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for JRC Wild Woods under registration PRM/KA/RERA/1251/310/PR/070425/007658 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/070425/007658
  • Project Name JRC Wild Woods Phase III
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 10 November 2028
  • Documents 92 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 11 November 2023 Expected commencement of civil works and foundation on site.
Original Completion 10 November 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

M/S JRC PROJECTS
Registered Address 1st, Floor, Plot No 313, Katha No 1386 Sy No 37 4 Rainbow Residencey Layout Near Wipro Office ,Sarjapur Road, Junnasandra Village, Varthur Hobli ,Bengaluru South ,Bengaluru Urban-560035
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy Nos. 31, 32, 110 and 111/2 of Rayasandra Village , Sarjapura Hobli Anekal Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560099

RERA Coordinates

Latitude, Longitude 12.8661, 77.6761
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 33/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 11 October 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower K 1 5 0 105 Residential 14.95 4 105
Tower L 1 5 0 10 Residential 14.95 4 10

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
3 BHK 0 units
  • Tower K
  • Tower L
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 121.7949564 K-001
-1 3 BHK 121.7949564 K-002
-1 3 BHK 121.7949564 K-003
-1 3 BHK 121.905511 K-004
-1 3 BHK 121.905511 K-005
-1 3 BHK 121.7949564 K-006
-1 3 BHK 121.7949564 K-007
-1 1 BHK 60.03766057 K-008
-1 1 BHK 59.22847509 K-009
-1 1 BHK 60.03766057 K-010
-1 1 BHK 59.22847509 K-011
-1 1 BHK 60.03766057 K-012
-1 1 BHK 59.22847509 K-013
-1 1 BHK 60.03766057 K-014
-1 1 BHK 59.22847509 K-015
-1 1 BHK 60.03766057 K-016
-1 1 BHK 59.22847509 K-017
-1 1 BHK 60.03766057 K-018
-1 1 BHK 59.58800986 K-019
-1 1 BHK 60.03766057 K-020
-1 1 BHK 59.58800986 K-021
GF 3 BHK 121.7949564 K-101
GF 3 BHK 121.7949564 K-102
GF 3 BHK 121.7949564 K-103
GF 3 BHK 121.905511 K-104
GF 3 BHK 121.905511 K-105
GF 3 BHK 121.7949564 K-106
GF 3 BHK 121.7949564 K-107
GF 1 BHK 60.03766057 K-108
GF 1 BHK 59.58800986 K-109
GF 1 BHK 60.39812436 K-110
GF 1 BHK 59.58800986 K-111
GF 1 BHK 60.03766057 K-112
GF 1 BHK 59.58800986 K-113
GF 1 BHK 60.39812436 K-114
GF 1 BHK 59.58800986 K-115
GF 1 BHK 60.03766057 K-116
GF 1 BHK 59.58800986 K-117
GF 1 BHK 60.39812436 K-118
GF 1 BHK 59.58800986 K-119
GF 1 BHK 60.03766057 K-120
GF 1 BHK 59.58800986 K-121
1 3 BHK 121.7949564 K-201
1 3 BHK 121.7949564 K-202
1 3 BHK 121.7949564 K-203
1 3 BHK 121.905511 K-204
1 3 BHK 121.905511 K-205
1 3 BHK 121.7949564 K-206
1 3 BHK 121.7949564 K-207
1 1 BHK 60.03766057 K-208
1 1 BHK 59.58800986 K-209
1 1 BHK 60.39812436 K-210
1 1 BHK 59.58800986 K-211
1 1 BHK 60.03766057 K-212
1 1 BHK 59.58800986 K-213
1 1 BHK 60.39812436 K-214
1 1 BHK 59.58800986 K-215
1 1 BHK 60.03766057 K-216
1 1 BHK 59.58800986 K-217
1 1 BHK 60.39812436 K-218
1 1 BHK 59.58800986 K-219
1 1 BHK 60.03766057 K-220
1 1 BHK 59.58800986 K-221
2 3 BHK 121.7949564 K-301
2 3 BHK 121.7949564 K-302
2 3 BHK 121.7949564 K-303
2 3 BHK 121.905511 K-304
2 3 BHK 121.905511 K-305
2 3 BHK 121.7949564 K-306
2 3 BHK 121.7949564 K-307
2 1 BHK 60.03766057 K-308
2 1 BHK 59.58800986 K-309
2 1 BHK 60.39812436 K-310
2 1 BHK 59.58800986 K-311
2 1 BHK 60.03766057 K-312
2 1 BHK 59.58800986 K-313
2 1 BHK 60.39812436 K-314
2 1 BHK 59.58800986 K-315
2 1 BHK 60.03766057 K-316
2 1 BHK 59.58800986 K-317
2 1 BHK 60.39812436 K-318
2 1 BHK 59.58800986 K-319
2 1 BHK 60.03766057 K-320
2 1 BHK 59.58800986 K-321
3 3 BHK 121.7949564 K-401
3 3 BHK 121.7949564 K-402
3 3 BHK 121.7949564 K-403
3 3 BHK 121.905511 K-404
3 3 BHK 121.905511 K-405
3 3 BHK 121.7949564 K-406
3 3 BHK 121.7949564 K-407
3 1 BHK 60.03766057 K-408
3 1 BHK 59.58800986 K-409
3 1 BHK 60.39812436 K-410
3 1 BHK 59.58800986 K-411
3 1 BHK 60.03766057 K-412
3 1 BHK 59.58800986 K-413
3 1 BHK 60.39812436 K-414
3 1 BHK 59.58800986 K-415
3 1 BHK 60.03766057 K-416
3 1 BHK 59.58800986 K-417
3 1 BHK 60.39812436 K-418
3 1 BHK 59.58800986 K-419
3 1 BHK 60.03766057 K-420
3 1 BHK 59.58800986 K-421
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Fd 8 ITR 2022 23.Pdf
Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 BALANCE SHEET.Pdf
Fd 2 BS With Schedules AY 2022 23 Compressed.Pdf
Fd 3 BS 2021 22 Original.Pdf
Fd 4 PROFIT & LOSS.Pdf
Fd 5 P L AY 2022 23.Pdf
Fd 6 PL 2021 22.Pdf
Fd 7 ITR 2024-25.Pdf
Fd 9 ITR 2021 22.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Photo 5 Project Photo
Od 1 1&3 FLOOR PLAN BUILDING 3&4 C.Pdf
Od 2 2&4 FLOOR PLAN BUILDING 3 & 4 C.Pdf
Od 3 BASEMENT FLOOR PLAN BUILDING 3 & 4 C.Pdf
Od 4 BUILDING 3 4 SANCTION APPROVAL ORDER FROM BDA.Pdf
Od 5 BUILDING 3 & 4 SANCTION APPROVAL FROM BDA.Pdf
Od 6 GROUND FLOOR PLAN BUILDING 3 & 4 C.Pdf
Od 7 SECTION & ELEVATION PLAN BUILDING 3 & 4 C.Pdf
Od 8 TERRACE FLOOR PLAN BUILDING 3 & 4 C.Pdf
Od 9 SITE PALN BUILDING 3 & 4 C.Pdf
Od 10 Aakarabandh Sy No 31.Pdf
Od 11 Aakarabandh Sy No 32.Pdf
Od 12 Aakarabandh Sy No 110.Pdf
Od 13 Aakarabandh Sy No 111 2.Pdf
Od 14 Survey Sketch Sy No 31.Pdf
Od 15 Survey Sketch Sy No 32.Pdf
Od 16 Survey Sketch Sy No 110 111 2.Pdf
Od 17 DISCHARGE DEED 5764.Pdf
Od 18 Title Deed Sy No 31.Pdf
Od 19 Title Deed Sy No 32.Pdf
Od 20 Title Deed Sy No 110.Pdf
Od 21 Title Deed Sy No 111 2.Pdf
Od 22 MR OLD 31 32 110 111 2.Pdf
Od 23 Area Statement JRC Wildwoods Building 3.Pdf
Od 24 CDP Map.Pdf
Od 25 Village Map.Pdf
Od 26 Original Blue Print DP Saction Plan.Pdf
Od 27 SANCTION APPROVAL ORDER FROM BDA.Pdf
Od 28 BIFURCATION OF AREA DETAILS.Pdf
Od 29 JRC Wildwoods Phase - 3 Common Area Details.Pdf
Od 30 STP (2).Pdf
Od 31 Mortgage.Pdf
Od 32 LAND COST CALCULATION.Pdf
Od 33 DP Saction Plan Letter.Pdf
Od 34 ADLR Sketch.Pdf
Od 35 Estimation JRC WW 3.Pdf
Od 36 Sale Deed 1 Acre 18 Gunta.Pdf
Od 37 CONVERSION ORDER SY 31 SR 36-2017-18.Pdf
Od 38 CONVERSION ORDER SY 110 111-2 SR 35-2017-18.Pdf
Od 39 LAND CONVERSION SKETCH 31.Pdf
Od 40 LAND CONVERSION SKETCH 32.Pdf
Od 41 SKETCH 12 3.Pdf
Od 42 31 Hissa Phodi.Pdf
Od 43 32 Thipani.Pdf
Ed 1 25-03-2025
Ed 2 25-03-2025
Ed 3 25-03-2025
Ed 4 25-03-2025
Ed 5 25-03-2025
Ed 6 25-03-2025
Ed 7 25-03-2025
Ed 8 25-03-2025
Ed 9 25-03-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 923020052057685
IFSC UTIB0001888
Branch Address Sarjapur Road
Country/City