Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Sobha Royal Crest RERA Details - PRM/KA/RERA/1251/309/PR/300522/004936 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha Royal Crest under registration PRM/KA/RERA/1251/309/PR/300522/004936 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/300522/004936
  • Project Name Sobha Royal Crest
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2028
  • Documents 108 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 14 June 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Sarjapur-Marthahalli Outer Ring Road,Bellandur Post, Bangalore - 560103 ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address BBMP Katha no 989/ 38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2, 38/5, 79, 80/1 ,Hosakerehalli village, , Uttarahalli Hobli, Bangalore South,Bangalore urban, Karnataka-560085 , Bengaluru South , Bengaluru Urban, Karnataka - 560085

RERA Coordinates

Latitude, Longitude 12.92293833677723, 77.53175663649583
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JDSOUTH/0010/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 12 May 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 1 2 28 4 110 Residential 100.0 31 110
Wing 2 2 28 4 109 Residential 100.0 31 109
Wing 3 2 28 4 110 Residential 100.0 31 110

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
4 BHK 0 units
  • Wing 1
  • Wing 2
  • Wing 3
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
3 3 BHK 126.4884 1041
3 3 BHK 115.3754 1042
3 3 BHK 115.3754 1043
3 3 BHK 126.4884 1044
4 3 BHK 126.4884 1051
4 3 BHK 115.3754 1052
4 3 BHK 115.3754 1053
4 3 BHK 126.4884 1054
5 3 BHK 126.4884 1061
5 3 BHK 115.3754 1062
5 3 BHK 115.3754 1063
5 3 BHK 126.4884 1064
6 3 BHK 126.4884 1071
6 3 BHK 115.3754 1072
6 3 BHK 115.3754 1073
6 3 BHK 126.4884 1074
7 3 BHK 126.4884 1081
7 3 BHK 115.3754 1082
7 3 BHK 115.3754 1083
7 3 BHK 126.4884 1084
8 3 BHK 126.4884 1091
8 3 BHK 115.3754 1092
8 3 BHK 115.3754 1093
8 3 BHK 126.4884 1094
9 3 BHK 126.4884 1101
9 3 BHK 115.3754 1102
9 3 BHK 115.3754 1103
9 3 BHK 126.4884 1104
10 3 BHK 126.4884 1111
10 3 BHK 115.3754 1112
10 3 BHK 115.3754 1113
10 3 BHK 126.4884 1114
11 3 BHK 126.4884 1121
11 3 BHK 115.3754 1122
11 3 BHK 115.3754 1123
11 3 BHK 126.4884 1124
12 3 BHK 126.4884 1131
12 3 BHK 115.3754 1132
12 3 BHK 115.3754 1133
12 3 BHK 126.4884 1134
13 3 BHK 126.4884 1141
13 3 BHK 115.3754 1142
13 3 BHK 115.3754 1143
13 3 BHK 126.4884 1144
14 3 BHK 126.4884 1151
14 3 BHK 115.3754 1152
14 3 BHK 115.3754 1153
14 3 BHK 126.4884 1154
15 3 BHK 126.4884 1161
15 3 BHK 115.3754 1162
15 3 BHK 115.3754 1163
15 3 BHK 126.4884 1164
16 3 BHK 126.4884 1171
16 3 BHK 115.3754 1172
16 3 BHK 115.3754 1173
16 3 BHK 126.4884 1174
17 3 BHK 126.4884 1181
17 3 BHK 115.3754 1182
17 4 BHK 182.2463 1183
17 3 BHK 126.4884 1184
18 3 BHK 126.4884 1191
18 3 BHK 115.3754 1192
18 3 BHK 126.4884 1194
19 3 BHK 126.4884 1201
19 3 BHK 115.3754 1202
19 3 BHK 115.3754 1203
19 3 BHK 126.4884 1204
20 3 BHK 126.4884 1211
20 3 BHK 115.3754 1212
20 3 BHK 115.3754 1213
20 3 BHK 126.4884 1214
21 3 BHK 126.4884 1221
21 3 BHK 115.3754 1222
21 3 BHK 115.3754 1223
21 3 BHK 126.4884 1224
22 3 BHK 126.4884 1231
22 3 BHK 115.3754 1232
22 3 BHK 115.3754 1233
22 3 BHK 126.4884 1234
23 3 BHK 126.4884 1241
23 3 BHK 115.3754 1242
23 3 BHK 115.3754 1243
23 3 BHK 126.4884 1244
24 3 BHK 126.4884 1251
24 3 BHK 115.3754 1252
24 3 BHK 115.3754 1253
24 3 BHK 126.4884 1254
25 3 BHK 126.4884 1261
25 3 BHK 115.3754 1262
25 3 BHK 115.3754 1263
25 3 BHK 126.4884 1264
26 3 BHK 126.4884 1271
26 3 BHK 115.3754 1272
26 3 BHK 115.3754 1273
26 3 BHK 126.4884 1274
27 3 BHK 126.4884 1281
27 3 BHK 115.3754 1282
27 4 BHK 182.2463 1283
27 3 BHK 126.4884 1284
28 3 BHK 126.4884 1291
28 3 BHK 115.3754 1292
28 3 BHK 126.4884 1294
29 3 BHK 126.4884 1301
29 3 BHK 115.3754 1302
29 3 BHK 115.3754 1303
29 3 BHK 126.4884 1304
30 3 BHK 126.4884 1311
30 3 BHK 115.3754 1312
30 3 BHK 115.3754 1313
30 3 BHK 126.4884 1314
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
2 Completion Certificate
6 Completion Certificate
8 Completion Certificate
9 Completion Certificate
10 Completion Certificate
13 Completion Certificate
15 Completion Certificate
16 Completion Certificate
18 Completion Certificate
19 Completion Certificate
22 Completion Certificate
24 Completion Certificate
25 Completion Certificate
28 Completion Certificate
29 Completion Certificate
30 Completion Certificate
35 Completion Certificate
36 Completion Certificate
45 Completion Certificate
47 Completion Certificate
50 Completion Certificate
51 Completion Certificate
52 Completion Certificate
53 Completion Certificate
54 Completion Certificate
55 Completion Certificate
58 Completion Certificate
60 Completion Certificate
61 Completion Certificate
62 Completion Certificate
65 Completion Certificate
66 Completion Certificate
67 Completion Certificate
68 Completion Certificate
73 Completion Certificate
74 Completion Certificate
76 Completion Certificate
80 Completion Certificate
Fd 1 Balance Sheet Mar 2021.Pdf
Fd 2 Balance Sheet Mar 2020.Pdf
Fd 3 Balance Sheet Mar 2019.Pdf
Fd 4 Profit Loss Statement Mar 2021.Pdf
Fd 5 Profit Loss Statement Mar 2020.Pdf
Fd 6 Profit Loss Statement Mar 2019.Pdf
Fd 7 DR 2020 21.Pdf
Fd 8 DR 2019 20.Pdf
Fd 9 DR 2018 19.Pdf
Fd 10 Cash Flow Mar 2021.Pdf
Fd 11 Cash Flow Mar 2020.Pdf
Fd 12 Cash Flow Mar 2019.Pdf
Fd 13 Auditors Report Mar 2021.Pdf
Fd 14 Auditors Report Mar 2020.Pdf
Fd 15 Auditors Report Mar 2019.Pdf
Fd 16 ITR AY 2020 21.Pdf
Fd 17 ITR AY 2019 20.Pdf
Fd 18 ITR AY 2018 19.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 11 BMRCL( Annexure - 103 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 STP Drawings And Tech Write Up.Pdf
Ed 1 23-05-2022
Ed 2 23-05-2022
Ed 3 23-05-2022
Ed 4 23-05-2022
Ed 5 23-05-2022
Ed 6 23-05-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 921020041914885
IFSC UTIB0000009
Branch Address M G ROAD
Country/City