Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.ka

Sri Garudapriya Sunshine RERA Details - PRM/KA/RERA/1250/304/PR/010923/006218 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sri Garudapriya Sunshine under registration PRM/KA/RERA/1250/304/PR/010923/006218 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1250/304/PR/010923/006218
  • Project Name SRI GARUDA PRIYA SUNSHINE
  • Project Type Residential/Group Housing
  • Project Status Ready to Move
  • District Bengaluru Rural
  • Taluka Hosakote
  • Original Completion 31 July 2025
  • Documents 72 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 July 2025 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SRI GARUDA PRIYA BUILDERS
Registered Address No 12 Doddadunasandra Cross,Chikkatirupathi Road ,Bengaluru East ,Bengaluru Urban-560067
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address New Converted Survey No.101/4 & Sy No.101/5, (Old Sy No.101), Present Doddagattiganabbe Grama Panchayath Joint Katha Nos. 148/101/5, 149/101/8, 150/1 , PID No.150300401000320217, Situated at PETTANAHALLI VILLAGE, Kasaba Hobli, Hoskote Taluk , Hosakote , Bengaluru Rural, Karnataka - 562114

RERA Coordinates

Latitude, Longitude 13.165214, 77.4092323
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. CC/284/2022-23
Authority Local Planing Authority
Approved Date 23 March 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
SRI GARUDA PRIYA SUNSHINE 1 6 0 75 Residential 14.95 4 75

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • SRI GARUDA PRIYA SUNSHINE
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 78.32 1
-1 2 BHK 82.96 2
-1 2 BHK 85.28 3
-1 2 BHK 85.28 4
-1 2 BHK 83.61 5
-1 3 BHK 110.46 6
-1 3 BHK 109.07 7
-1 3 BHK 101.82 8
-1 2 BHK 94.39 9
-1 2 BHK 85.47 10
-1 2 BHK 90.12 11
-1 3 BHK 110.09 12
-1 3 BHK 121.14 13
-1 3 BHK 104.70 14
-1 3 BHK 110.27 15
GF 2 BHK 84.73 101
GF 2 BHK 89.93 102
GF 2 BHK 89.93 103
GF 2 BHK 89.93 104
GF 2 BHK 88.63 105
GF 2 BHK 115.66 106
GF 3 BHK 114.08 107
GF 3 BHK 108.51 108
GF 3 BHK 95.22 109
GF 2 BHK 85.47 110
GF 2 BHK 90.12 111
GF 3 BHK 110.09 112
GF 3 BHK 121.14 113
GF 3 BHK 104.70 114
GF 3 BHK 110.27 115
1 2 BHK 84.73 201
1 2 BHK 89.93 202
1 2 BHK 89.93 203
1 2 BHK 89.93 204
1 2 BHK 88.63 205
1 2 BHK 115.66 206
1 3 BHK 114.08 207
1 3 BHK 108.51 208
1 3 BHK 95.22 209
1 2 BHK 85.47 210
1 2 BHK 90.12 211
1 3 BHK 110.09 212
1 3 BHK 121.14 213
1 3 BHK 104.70 214
1 3 BHK 110.27 215
2 2 BHK 84.73 301
2 2 BHK 89.93 302
2 2 BHK 89.93 303
2 2 BHK 89.93 304
2 2 BHK 88.63 305
2 2 BHK 115.66 306
2 3 BHK 114.08 307
2 3 BHK 108.51 308
2 3 BHK 95.22 309
2 2 BHK 85.47 310
2 2 BHK 90.12 311
2 3 BHK 110.09 312
2 3 BHK 121.14 313
2 3 BHK 104.70 314
2 3 BHK 110.27 315
3 2 BHK 84.73 401
3 2 BHK 89.93 402
3 2 BHK 89.93 403
3 2 BHK 89.93 404
3 2 BHK 88.63 405
3 2 BHK 115.66 406
3 3 BHK 114.08 407
3 3 BHK 108.51 408
3 3 BHK 95.22 409
3 2 BHK 85.47 410
3 2 BHK 90.12 411
3 3 BHK 110.09 412
3 3 BHK 121.14 413
3 3 BHK 104.70 414
3 3 BHK 110.27 415
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 ITR Not Applicable.Pdf
Fd 2 ITR Not Applicable.Pdf
Fd 3 ITR Not Applicable.Pdf
Fd 4 ITR Not Applicable.Pdf
Fd 5 ITR Not Applicable.Pdf
Fd 6 ITR Not Applicable.Pdf
Fd 7 ITR Not Applicable.Pdf
Fd 8 ITR Not Applicable.Pdf
Fd 9 ITR Not Applicable.Pdf
Fd 10 ITR Not Applicable.Pdf
Fd 11 ITR Not Applicable.Pdf
Fd 12 ITR Not Applicable.Pdf
Fd 13 ITR Not Applicable.Pdf
Fd 14 ITR Not Applicable.Pdf
Fd 15 ITR Not Applicable.Pdf
Fd 16 ITR Not Applicable.Pdf
Fd 17 ITR Not Applicable.Pdf
Fd 18 ITR Not Applicable.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 CDP Demarcation Plan.Jpg
Od 2 Village Map Demarcation.Pdf
Od 3 Estimation Of Cost.Pdf
Od 4 Akarband.Pdf
Od 5 Old Mutation.Pdf
Od 6 Phodi Mutation.Pdf
Od 7 SR Guidance Value.Pdf
Od 8 Sale Deed - Gopal Krishna.Pdf
Od 9 Sale Deed Raghupathy.Pdf
Od 10 RDPR E Khatha.Pdf
Ed 1 03-08-2023
Ed 2 03-08-2023
Ed 3 03-08-2023
Ed 4 03-08-2023
Ed 5 03-08-2023
Ed 6 03-08-2023
Ed 7 22-08-2023
Ed 8 22-08-2023
Ed 9 22-08-2023
Ed 10 22-08-2023
Ed 11 22-08-2023
Ed 12 31-08-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank FEDERAL BANK OF INDIA
Account Number (RERA) 22620200003977
IFSC FDRL0002262
Branch Address Thirumalasettyhalli Branch
Country/City