Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

Modern Spaaces Engrace RERA Details - PRM/KA/RERA/1251/308/PR/220722/005097 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Modern Spaaces Engrace under registration PRM/KA/RERA/1251/308/PR/220722/005097 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/220722/005097
  • Project Name Modern Spaces Felicity Engrace 2
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 June 2026
  • Documents 69 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2022 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Modern Spaces
Registered Address 73/2, Near Asset Serene Apartment, Chambenahalli,Sarjapur Road ,Bengaluru East ,Bengaluru Urban-562125
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No.39 & 40/2, Khata No:1317/39 & 40/2 in Kada Agrahara Village, , Sarjapura Hobli , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.863205, 77.760161
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/613/2021-22
Authority BMRDA - Bangalore Metropolitan Region Development Authority
Approved Date 03 March 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Block A 0 5 1 66 Residential 14.95 4 60
Block B 0 5 1 106 Residential 14.95 4 96
Block C 0 5 1 30 Residential 14.95 4 28
Block D 0 5 1 40 Residential 14.95 4 36
Block E 0 5 1 132 Residential 14.95 4 120

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Block A
  • Block B
  • Block C
  • Block D
  • Block E
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 89.44 A001
GF 2 BHK 82.40 A002
GF 2 BHK 82.40 A003
GF 2 BHK 82.40 A004
GF 2 BHK 86.08 A005
GF 3 BHK 110.35 A006
GF 3 BHK 110.35 A007
GF 2 BHK 92.70 A008
GF 2 BHK 92.70 A009
GF 2 BHK 92.70 A010
GF 2 BHK 92.68 A011
GF 2 BHK 89.19 A012
GF 2 BHK 79.41 A013
GF 2 BHK 89.19 A014
GF 2 BHK 89.19 A015
1 2 BHK 89.44 A101
1 2 BHK 82.40 A102
1 2 BHK 82.40 A103
1 2 BHK 82.40 A104
1 2 BHK 86.08 A105
1 3 BHK 110.35 A106
1 3 BHK 110.35 A107
1 2 BHK 92.70 A108
1 2 BHK 92.70 A109
1 2 BHK 92.70 A110
1 2 BHK 92.68 A111
1 2 BHK 89.19 A112
1 2 BHK 79.41 A113
1 2 BHK 89.19 A114
1 2 BHK 89.19 A115
2 2 BHK 89.44 A201
2 2 BHK 82.40 A202
2 2 BHK 82.40 A203
2 2 BHK 82.40 A204
2 2 BHK 86.08 A205
2 3 BHK 110.35 A206
2 3 BHK 110.35 A207
2 2 BHK 92.70 A208
2 2 BHK 92.70 A209
2 2 BHK 92.70 A210
2 2 BHK 92.68 A211
2 2 BHK 89.19 A212
2 2 BHK 79.41 A213
2 2 BHK 89.19 A214
2 2 BHK 89.19 A215
3 2 BHK 89.44 A301
3 2 BHK 82.40 A302
3 2 BHK 82.40 A303
3 2 BHK 82.40 A304
3 2 BHK 86.08 A305
3 3 BHK 110.35 A306
3 3 BHK 110.35 A307
3 2 BHK 92.70 A308
3 2 BHK 92.70 A309
3 2 BHK 92.70 A310
3 2 BHK 92.68 A311
3 2 BHK 89.19 A312
3 2 BHK 79.41 A313
3 2 BHK 89.19 A314
3 2 BHK 89.19 A315
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Common Areas Staircases % not reported Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported
Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported
Common Areas Terrace % not reported Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported
Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Not Applicable With Reason.Pdf
Fd 2 Not Applicable With Reason.Pdf
Fd 3 Not Applicable With Reason.Pdf
Fd 4 Not Applicable With Reason.Pdf
Fd 5 Not Applicable With Reason.Pdf
Fd 6 Not Applicable With Reason.Pdf
Fd 7 Not Applicable With Reason.Pdf
Fd 8 Not Applicable With Reason.Pdf
Fd 9 Not Applicable With Reason.Pdf
Fd 10 Not Applicable With Reason.Pdf
Fd 11 Not Applicable With Reason.Pdf
Fd 12 Not Applicable With Reason.Pdf
Fd 13 Not Applicable With Reason.Pdf
Fd 14 Not Applicable With Reason.Pdf
Fd 15 Not Applicable With Reason.Pdf
Fd 16 Not Applicable With Reason.Pdf
Fd 17 Not Applicable With Reason.Pdf
Fd 18 Not Applicable With Reason.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Photo 1 Project Photo
Od 1 SEIAA NOC.Pdf
Od 2 CDP Map Engrace 2.Pdf
Od 3 STP Design And Drawing.Pdf
Od 4 Initial Sanction Order.Pdf
Od 5 GUIDANCE VALUE FROM SUB REGISTER.Pdf
Od 6 Location And Demarcation.Pdf
Od 7 LICENSES AND TAX APID SY 40-2 AND 29.Pdf
Od 8 Section Plan.Pdf
Od 9 Single Layout Plan.Pdf
Od 10 Single Layout Plan Approval Letter.Pdf
Ed 1 20-07-2022
Ed 2 20-07-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank FEDERAL BANK OF INDIA
Account Number (RERA) 21660200003313
IFSC FDRL0002166
Branch Address Billapura
Country/City