Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

Modern Spaaces Engrace RERA Details - PRM/KA/RERA/1251/308/PR/271023/006364 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Modern Spaaces Engrace under registration PRM/KA/RERA/1251/308/PR/271023/006364 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/271023/006364
  • Project Name Engrace 4
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2026
  • Documents 77 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Modern Spaces
Registered Address 73/2, Near Asset Serene Apartment,Chambenahalli, Sarjapur Road ,Bengaluru East ,Bengaluru Urban-562125
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SURVEY NO. 39 & 41/3 KATHA NO. 150200100100920081 OF KADAAGRAHARA VILLAGE , SARJAPURA HOBLI , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.863184, 77.757721
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/370/2023-24
Authority BMRDA - Bangalore Metropolitan Region Development Authority
Approved Date 23 August 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Engrace 4 0 6 1 161 Residential 17.95 5 145

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • Engrace 4
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 111.5 101
GF 3 BHK 111.5 102
GF 3 BHK 111.5 103
GF 3 BHK 111.5 104
GF 3 BHK 111.5 105
GF 3 BHK 111.3 106
GF 3 BHK 127.6 107
GF 3 BHK 123.3 108
GF 3 BHK 123.3 109
GF 3 BHK 98.3 110
GF 3 BHK 98.3 111
GF 3 BHK 98.3 112
GF 3 BHK 98.3 113
GF 3 BHK 98.3 114
GF 3 BHK 93.6 115
GF 3 BHK 123.3 116
GF 3 BHK 123.3 117
GF 3 BHK 92.2 118
GF 3 BHK 92.2 119
GF 3 BHK 92.2 120
GF 3 BHK 92.2 121
GF 3 BHK 92.2 122
GF 3 BHK 103.5 123
GF 3 BHK 121.6 124
GF 3 BHK 125.4 125
GF 3 BHK 125.4 126
GF 3 BHK 125.4 127
GF 3 BHK 125.4 128
GF 3 BHK 134.7 129
1 3 BHK 111.5 201
1 3 BHK 111.5 202
1 3 BHK 111.5 203
1 3 BHK 111.5 204
1 3 BHK 111.5 205
1 3 BHK 111.3 206
1 3 BHK 127.6 207
1 3 BHK 123.3 208
1 3 BHK 123.3 209
1 3 BHK 98.3 210
1 3 BHK 98.3 211
1 3 BHK 98.3 212
1 3 BHK 98.3 213
1 3 BHK 98.3 214
1 3 BHK 93.6 215
1 3 BHK 123.3 216
1 3 BHK 123.3 217
1 3 BHK 92.2 218
1 3 BHK 92.2 219
1 3 BHK 92.2 220
1 3 BHK 92.2 221
1 3 BHK 92.2 222
1 3 BHK 103.5 223
1 3 BHK 121.6 224
1 3 BHK 125.4 225
1 3 BHK 125.4 226
1 3 BHK 125.4 227
1 3 BHK 125.4 228
1 3 BHK 134.7 229
2 3 BHK 111.5 301
2 3 BHK 111.5 302
2 3 BHK 111.5 303
2 3 BHK 111.5 304
2 3 BHK 111.5 305
2 3 BHK 111.3 306
2 3 BHK 127.6 307
2 3 BHK 123.3 308
2 3 BHK 123.3 309
2 3 BHK 98.3 310
2 3 BHK 98.3 311
2 3 BHK 98.3 312
2 3 BHK 98.3 313
2 3 BHK 98.3 314
2 3 BHK 93.6 315
2 3 BHK 123.3 316
2 3 BHK 123.3 317
2 3 BHK 92.2 318
2 3 BHK 92.2 319
2 3 BHK 92.2 320
2 3 BHK 92.2 321
2 3 BHK 92.2 322
2 3 BHK 103.5 323
2 3 BHK 121.6 324
2 3 BHK 125.4 325
2 3 BHK 125.4 326
2 3 BHK 125.4 327
2 3 BHK 125.4 328
2 3 BHK 134.7 329
3 3 BHK 111.5 401
3 3 BHK 111.5 402
3 3 BHK 111.5 403
3 3 BHK 111.5 404
3 3 BHK 111.5 405
3 3 BHK 111.3 406
3 3 BHK 127.6 407
3 3 BHK 123.3 408
3 3 BHK 123.3 409
3 3 BHK 98.3 410
3 3 BHK 98.3 411
3 3 BHK 98.3 412
3 3 BHK 98.3 413
3 3 BHK 98.3 414
3 3 BHK 93.6 415
3 3 BHK 123.3 416
3 3 BHK 123.3 417
3 3 BHK 92.2 418
3 3 BHK 92.2 419
3 3 BHK 92.2 420
3 3 BHK 92.2 421
3 3 BHK 92.2 422
3 3 BHK 103.5 423
3 3 BHK 121.6 424
3 3 BHK 125.4 425
3 3 BHK 125.4 426
3 3 BHK 125.4 427
3 3 BHK 125.4 428
3 3 BHK 134.7 429
4 3 BHK 111.5 501
4 3 BHK 111.5 502
4 3 BHK 111.5 503
4 3 BHK 111.5 504
4 3 BHK 111.5 505
4 3 BHK 111.3 506
4 3 BHK 127.6 507
4 3 BHK 123.3 508
4 3 BHK 123.3 509
4 3 BHK 98.3 510
4 3 BHK 98.3 511
4 3 BHK 98.3 512
4 3 BHK 98.3 513
4 3 BHK 98.3 514
4 3 BHK 93.6 515
4 3 BHK 123.3 516
4 3 BHK 123.3 517
4 3 BHK 92.2 518
4 3 BHK 92.2 519
4 3 BHK 92.2 520
4 3 BHK 92.2 521
4 3 BHK 92.2 522
4 3 BHK 103.5 523
4 3 BHK 121.6 524
4 3 BHK 125.4 525
4 3 BHK 125.4 526
4 3 BHK 125.4 527
4 3 BHK 125.4 528
4 3 BHK 134.7 529
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Modern Spaces Signed Financials 2022-23.Pdf
Fd 2 Modern Spaces Financials 2021-22.Pdf
Fd 3 Not Available.Pdf
Fd 4 Modern Spaces Signed Financials 2022-23.Pdf
Fd 5 Modern Spaces Financials 2021-22.Pdf
Fd 6 Not Available.Pdf
Fd 7 Not Available.Pdf
Fd 8 Not Available.Pdf
Fd 9 Not Available.Pdf
Fd 10 Not Available.Pdf
Fd 11 Not Available.Pdf
Fd 12 Not Available.Pdf
Fd 13 Not Available.Pdf
Fd 14 Not Available.Pdf
Fd 15 Not Available.Pdf
Fd 16 Not Available.Pdf
Fd 17 Not Available.Pdf
Fd 18 Not Available.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 STP Design.Pdf
Od 2 CDP Master Extract.Jpeg
Od 3 STP Location Demarcation.Pdf
Od 4 E4 Area Statement- Unit Wise.Pdf
Od 5 Village Map Demarcation.Png
Od 6 Location Demarcation.Png
Od 7 Single Layout Plan.Pdf
Od 8 Single Layout Order.Pdf
Od 9 Guidance Value Certificate.Pdf
Od 10 1 Stilt Floor Plan.Pdf
Od 11 2 Site Plan And Elevation.Pdf
Od 12 3 Ground Floor Plan.Pdf
Od 13 4 Terrace Floor Plan.Pdf
Od 14 5 Typical 1-4 Floor Plan.Pdf
Od 15 Title Deed Sy No 41-3.Pdf
Od 16 Title Deed Sy No 39.Pdf
Ed 1 26-10-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank FEDERAL BANK OF INDIA
Account Number (RERA) 21660200003875
IFSC FDRL0002166
Branch Address Billapura
Country/City