RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number PRM/KA/RERA/1251/309/PR/190822/005168
- Project Name Oakstone Lakeview
- Project Type Residential/Group Housing
- Project Status Ready to Move
- District Bengaluru Urban
- Taluka Bengaluru North
- Original Completion 31 October 2024
- Documents 63 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Primary Promoter
OAKSTONE VENTURESLand, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Address Old Sy Nos.22/2, New No.22/5 and 22/6, , Present BBMP Katha Municipal No.312, Katha Sl No.3979, , Bengaluru North , Bengaluru Urban, Karnataka - 560086 |
RERA Coordinates |
|
| Latitude, Longitude 12.94223, 77.74154 | |
Plans & Approvals
Statutory approvals obtained or pending against the project site.
| Plan Approval No. | PRJ/10120/21-22IN |
|---|---|
| Authority | BBMP - Bruhat Bengaluru Mahanagara Palike |
| Approved Date | 09 February 2022 |
Understand this Project's RERA details
Get clear answers and additional support from our RERA experts.
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
| Name | No. of Basements | No. of Slab | No. of Slits | No. of Open Parking | Building Type | Height of Tower | No. of Floors | No. of Units |
|---|---|---|---|---|---|---|---|---|
| Oakstone Lakeview | 0 | 5 | 1 | 93 | Residential | 15.0 | 4 | 84 |
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
- Oakstone Lakeview
| Floor | Apartment Type | Carpet Area | No. of Unit |
|---|---|---|---|
| GF | 2 BHK | 67.32 | A 001 |
| GF | 2 BHK | 67.38 | A 002 |
| GF | 2 BHK | 65.41 | A 003 |
| GF | 2 BHK | 65.52 | A 004 |
| GF | 2 BHK | 65.96 | A 005 |
| GF | 2 BHK | 65.31 | A 006 |
| GF | 2 BHK | 62.06 | A 007 |
| GF | 2 BHK | 61.61 | A 008 |
| GF | 2 BHK | 64.34 | A010 |
| GF | 2 BHK | 67.64 | A 011 |
| GF | 2 BHK | 66.38 | A 012 |
| GF | 2 BHK | 66.38 | A 013 |
| GF | 2 BHK | 64.78 | A 014 |
| GF | 2 BHK | 65.17 | B001 |
| GF | 2 BHK | 56.84 | B002 |
| GF | 2 BHK | 57.64 | B 003 |
| GF | 2 BHK | 67.09 | B004 |
| GF | 2 BHK | 65.78 | B005 |
| GF | 2 BHK | 67.32 | A001 |
| GF | 2 BHK | 67.38 | A 002 |
| GF | 2 BHK | 65.4 | A 003 |
| 1 | 2 BHK | 65.52 | A 004 |
| 1 | 2 BHK | 65.96 | A 005 |
| 1 | 2 BHK | 65.31 | A 006 |
| 1 | 2 BHK | 62.01 | A 007 |
| 1 | 2 BHK | 61.61 | A 008 |
| 1 | 2 BHK | 64.34 | A 010 |
| 1 | 2 BHK | 67.63 | A 011 |
| 1 | 2 BHK | 66.38 | A 012 |
| 1 | 2 BHK | 66.38 | A 013 |
| 1 | 2 BHK | 64.78 | A 014 |
| 1 | 2 BHK | 65.17 | B 001 |
| 1 | 2 BHK | 56.84 | B 002 |
| 1 | 2 BHK | 57.64 | B 003 |
| 1 | 2 BHK | 67.09 | B 004 |
| 1 | 2 BHK | 65.78 | B 005 |
| 1 | 2 BHK | 67.32 | A 001 |
| 1 | 2 BHK | 67.38 | A 002 |
| 1 | 2 BHK | 65.4 | A 003 |
| 1 | 2 BHK | 65.52 | A 004 |
| 1 | 2 BHK | 65.96 | A 005 |
| 1 | 2 BHK | 65.31 | A 006 |
| 2 | 2 BHK | 62.01 | A 007 |
| 2 | 2 BHK | 61.61 | A 008 |
| 2 | 2 BHK | 64.34 | A 010 |
| 2 | 2 BHK | 67.63 | A 011 |
| 2 | 2 BHK | 66.38 | A 012 |
| 2 | 2 BHK | 66.38 | A 013 |
| 2 | 2 BHK | 64.78 | A 014 |
| 2 | 2 BHK | 65.17 | B 001 |
| 2 | 2 BHK | 56.84 | B 002 |
| 2 | 2 BHK | 57.64 | B 003 |
| 2 | 2 BHK | 67.09 | B 004 |
| 2 | 2 BHK | 65.78 | B 005 |
| 2 | 2 BHK | 67.32 | A 001 |
| 2 | 2 BHK | 67.38 | A 002 |
| 2 | 2 BHK | 65.4 | A 003 |
| 2 | 2 BHK | 65.52 | A 004 |
| 2 | 2 BHK | 65.96 | A 005 |
| 2 | 2 BHK | 65.31 | A 006 |
| 2 | 2 BHK | 62.01 | A 007 |
| 2 | 2 BHK | 61.61 | A 008 |
| 2 | 2 BHK | 64.34 | A 010 |
| 3 | 2 BHK | 67.63 | A 011 |
| 3 | 2 BHK | 66.38 | A 012 |
| 3 | 2 BHK | 66.38 | A 013 |
| 3 | 2 BHK | 64.78 | A 014 |
| 3 | 2 BHK | 65.17 | B 001 |
| 3 | 2 BHK | 56.84 | B 002 |
| 3 | 2 BHK | 57.64 | B 003 |
| 3 | 2 BHK | 67.09 | B 004 |
| 3 | 2 BHK | 65.78 | B 005 |
| 3 | 3 BHK | 83.98 | A 009 |
| 3 | 3 BHK | 89.67 | A 015 |
| 3 | 3 BHK | 72.57 | B 006 |
| 3 | 3 BHK | 83.98 | A 009 |
| 3 | 3 BHK | 89.67 | A 015 |
| 3 | 3 BHK | 77.21 | B 006 |
| 3 | 3 BHK | 83.98 | A 009 |
| 3 | 3 BHK | 89.67 | A 015 |
| 3 | 3 BHK | 77.21 | B 006 |
| 3 | 3 BHK | 83.98 | A 009 |
| 3 | 3 BHK | 89.67 | A 015 |
| 3 | 3 BHK | 77.21 | B 006 |
Parking, Garage & Area Details
Parking provision declared in the sanctioned plan.
| Type | Proposed | Booked | Work Done |
|---|---|---|---|
| Garage | - | - | - |
| Covered Parking | - | - | - |
| Open Parking | - | - | - |
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Sub Structure Earth Work And Other Leveling Preparation Work % not reported | Sub Structure Foundation Footing Work % not reported | Sub Structure Upto Plinth Level % not reported |
| Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported | Sub Structure Retaining Wall (All Types) % not reported | Sup Structure Rcc Or Ms Framed Structure % not reported |
| Sup Structure Masonry Construction % not reported | Sup Structure Plastering Inside , Outside & Ceiling % not reported | Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported |
| Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported | Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported | Sup Structure Railing And Grill Fixing % not reported |
| Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported | Finishing Works Painting % not reported | Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported |
| Finishing Works Weather Proof Work(tile,concrete) % not reported | Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported | Finishing Works Elevation Work % not reported |
| Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported | Internal Infrastructure Water Supply % not reported | Internal Infrastructure Sewage And Drainage System % not reported |
| Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported | Internal Infrastructure Energy Management % not reported | Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported |
| Internal Infrastructure Solid Waste Management And Disposal % not reported | Internal Infrastructure Emergency Evacuation Services % not reported | External Infrastructure Water Supply % not reported |
| External Infrastructure Internal Roads & Footpaths % not reported | External Infrastructure Sewage And Drainage System % not reported | External Infrastructure Electricity Supply Transformer And Substation % not reported |
| External Infrastructure Solid Waste Management And Disposal % not reported | External Infrastructure Emergency Evacuation Services % not reported | External Infrastructure Storm Water Drains % not reported |
| External Infrastructure Use Of Renewable Energy % not reported | External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported | External Infrastructure Fire Protection And Fire Safety Requirements % not reported |
| External Infrastructure Sewage Treatment Plant (Stp) % not reported | External Infrastructure Parks & Tree Planting % not reported | External Infrastructure Street Lighting % not reported |
| Amenities Electricity % not reported | Amenities Smart Home Automation % not reported | Amenities Cctv Surveillance % not reported |
| Amenities Club House % not reported | Amenities Community Hall % not reported | Amenities Outdoor Sports Facility % not reported |
| Amenities Indoor Sports Facility % not reported | Amenities Swimming Pool % not reported | Amenities Gym % not reported |
| Amenities Parks % not reported | Amenities Power Backup % not reported | Amenities Piped Gas % not reported |
| Amenities Water And Sanitation % not reported | Amenities Air Conditioning % not reported | Common Areas Staircases % not reported |
| Common Areas Lifts % not reported | Common Areas Corridor/lobbies % not reported | Common Areas Fire Escapes % not reported |
| Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported | Common Areas Basement % not reported | Common Areas Terrace % not reported |
| Common Areas Outer Wall % not reported | Common Areas Open Parking Areas % not reported | Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported |
| Common Areas Water Conservation And Renewable Energy % not reported | Common Areas Common Storage Spaces % not reported | Common Areas Oh Tank % not reported |
| Common Areas Stp % not reported | Common Areas Sump % not reported | Common Areas Watch Man Room % not reported |
| Common Areas Toilet % not reported | Common Areas Parking Stair Case % not reported | Common Areas Lift Machine Room % not reported |
| Common Areas Stair Case Head Room % not reported | Common Areas Electrical Room % not reported | Common Areas Generator Room % not reported |
| Common Areas Gym % not reported | Common Areas Swimming Pool % not reported | Common Areas Jogging Track % not reported |
| Common Areas Shuttle Court % not reported | Common Areas Cricket Net % not reported |
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | HDFC |
|---|---|
| Account Number (RERA) | 50200068265928 |
| IFSC | HDFC0002377 |
| Branch Address | Whitefield |