Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Vaishno Luxuria RERA Details - PRM/KA/RERA/1251/308/PR/180924/007042 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Vaishno Luxuria under registration PRM/KA/RERA/1251/308/PR/180924/007042 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/180924/007042
  • Project Name VAISHNO LUXURIA
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 25 October 2027
  • Documents 104 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2024 Expected commencement of civil works and foundation on site.
Original Completion 25 October 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

VAISHNO VENTURES
Registered Address KHATA NO -227/43/3/1, NO-123, 123 GALAXY ONE B BLOCK,MANJUNATHA NAGAR, SEEGEHALLI ,Bengaluru East ,Bengaluru Urban-560049
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 12 & 86, NEKKUNDI, DOMMASANDRA VILLAGE , SARJAPURA (HOBLI), ANEKAL TALUK , Anekal , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.8792302, 77.7296353
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 10/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 13 May 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Villa 1 4 1 140 Residential 11.4 2 70

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • Villa
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 TYPE A 3 BHK 184.69 P-001
-1 TYPE B 3 BHK 185.99 P-002
-1 TYPE A 3 BHK 184.69 P-003
-1 TYPE B 3 BHK 203.28 P-004
-1 TYPE A 3 BHK 201.84 P-005
-1 TYPE B 3 BHK 203.28 P-006
-1 TYPE A 3 BHK 201.84 P-007
-1 TYPE B 3 BHK 203.28 P-008
-1 TYPE A 3 BHK 201.84 P-009
-1 TYPE B 3 BHK 203.28 P-010
-1 TYPE A 3 BHK 201.84 P-011
-1 TYPE B 3 BHK 203.28 P-012
-1 TYPE A 3 BHK 201.84 P-013
-1 TYPE B 3 BHK 203.28 P-014
-1 TYPE A 3 BHK 201.84 P-015
-1 TYPE B 3 BHK 203.28 P-016
-1 TYPE A 3 BHK 201.84 P-017
-1 TYPE B 3 BHK 203.28 P-018
-1 TYPE A 3 BHK 201.84 P-019
-1 TYPE B 3 BHK 203.28 P-020
-1 TYPE A 3 BHK 201.84 P-021
-1 TYPE B 3 BHK 203.28 P-022
-1 TYPE A 3 BHK 201.84 P-023
-1 TYPE B 3 BHK 203.28 P-024
-1 TYPE A 3 BHK 201.84 P-025
-1 TYPE B 3 BHK 203.28 P-026
-1 TYPE A 3 BHK 201.84 P-027
-1 TYPE B 3 BHK 185.99 P-028
-1 TYPE C 3 BHK 201.87 P-029
-1 TYPE C 3 BHK 201.87 P-030
-1 TYPE C 3 BHK 201.87 P-031
-1 TYPE C 3 BHK 201.87 P-032
-1 TYPE C 3 BHK 201.87 P-033
-1 TYPE C 3 BHK 201.87 P-034
-1 TYPE C 3 BHK 201.87 P-035
-1 TYPE C 3 BHK 198.58 P-036
-1 TYPE C 3 BHK 198.58 P-037
-1 TYPE C 3 BHK 198.58 P-038
-1 TYPE C 3 BHK 201.87 P-039
-1 TYPE C 3 BHK 201.87 P-040
-1 TYPE C 3 BHK 201.87 P-041
-1 TYPE C 3 BHK 201.87 P-042
-1 TYPE C 3 BHK 201.87 P-043
-1 TYPE C 3 BHK 201.87 P-044
-1 TYPE C 3 BHK 201.87 P-045
-1 TYPE C 3 BHK 201.87 P-046
-1 TYPE C 3 BHK 201.87 P-047
-1 TYPE C 3 BHK 201.87 P-048
-1 TYPE C 3 BHK 201.87 P-049
-1 TYPE C 3 BHK 201.87 P-050
-1 TYPE C 3 BHK 201.87 P-051
-1 TYPE C 3 BHK 201.87 P-052
-1 TYPE C 3 BHK 201.87 P-053
-1 TYPE C 3 BHK 201.87 P-054
-1 TYPE C 3 BHK 201.87 P-055
-1 TYPE C 3 BHK 201.87 P-056
-1 TYPE C 3 BHK 201.87 P-057
-1 TYPE C 3 BHK 201.87 P-058
-1 TYPE C 3 BHK 201.87 P-059
-1 TYPE C 3 BHK 201.87 P-060
-1 TYPE C 3 BHK 201.87 P-061
-1 TYPE C 3 BHK 201.87 P-062
-1 TYPE C 3 BHK 201.87 P-063
-1 TYPE C 3 BHK 201.87 P-064
-1 TYPE C 3 BHK 201.87 P-065
-1 TYPE C 3 BHK 201.87 P-066
-1 TYPE C 3 BHK 201.87 P-067
-1 TYPE C 3 BHK 201.87 P-068
-1 TYPE C 3 BHK 201.87 P-069
-1 TYPE C 3 BHK 201.87 P-070
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Affidavit
Promoter Address Proof
Promoter Registration Certificate
Promoter Pan Card
Fd 1 Profit And Loss Noc.Pdf
Fd 2 NA.Png
Fd 3 NA.Png
Fd 4 Profit And Loss Noc.Pdf
Fd 5 NA.Png
Fd 6 NA.Png
Fd 7 NA.Png
Fd 8 NA.Png
Fd 9 NA.Png
Fd 10 NA.Png
Fd 11 NA.Png
Fd 12 NA.Png
Fd 13 NA.Png
Fd 14 NA.Png
Fd 15 NA.Png
Fd 16 Profit And Loss Noc.Pdf
Fd 17 NA.Png
Fd 18 NA.Png
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Photo 1 Project Photo
Od 1 Land Cost Calculation.Pdf
Od 2 Market Value Copy.Pdf
Od 3 STP DEMACATION.Pdf
Od 4 VAISHNO LUXURIA COST ESTIMATION.Pdf
Od 5 VILLAGE MAP.Jpeg
Od 6 General Power Of Attorney .Pdf
Od 7 Source Of Water Supply Noc.Pdf
Od 8 BORE POINT 1.Jpeg
Od 9 BORE POINT 2.Jpeg
Od 10 BORE POINT 3.Jpeg
Ed 1 02-07-2024
Ed 2 02-07-2024
Ed 3 02-07-2024
Ed 4 02-07-2024
Ed 5 02-07-2024
Ed 6 02-07-2024
Ed 7 02-07-2024
Ed 8 02-07-2024
Ed 9 02-07-2024
Ed 10 02-07-2024
Ed 11 02-07-2024
Ed 12 02-07-2024
Ed 13 02-07-2024
Ed 14 02-07-2024
Ed 15 02-07-2024
Ed 16 02-07-2024
Ed 17 02-07-2024
Ed 18 18-07-2024
Ed 19 18-07-2024
Ed 20 18-07-2024
Ed 21 18-07-2024
Ed 22 18-07-2024
Ed 23 18-07-2024
Ed 24 18-07-2024
Ed 25 18-07-2024
Ed 26 18-07-2024
Ed 27 18-07-2024
Ed 28 16-09-2024
Ed 29 16-09-2024
Ed 30 16-09-2024
Ed 31 16-09-2024
Ed 32 16-09-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 57500001518302
IFSC HDFC0005493
Branch Address VARTHUR BRANCH
Country/City